90 FR 150 pgs. 38009-38045 - Air Plan Approval; OR; Update to Materials Incorporated by Reference

Type: RULEVolume: 90Number: 150Pages: 38009 - 38045
Docket number: [EPA-R10-OAR-2024-0480; FRL-12783-01-R10]
FR document: [FR Doc. 2025-14971 Filed 8-6-25; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version
Pages: 38009, 38010, 3801138012, 38013, 38014, 38015, 38016, 38028, 38030, 38035, 38038, 38039, 38040, 38041,

[top] page 38009

ENVIRONMENTAL PROTECTION AGENCY

40 CFR Part 52

[EPA-R10-OAR-2024-0480; FRL-12783-01-R10]

Air Plan Approval; OR; Update to Materials Incorporated by Reference

AGENCY:

Environmental Protection Agency (EPA).

ACTION:

Final rule; administrative change.


[top] page 38010

SUMMARY:

The Environmental Protection Agency (EPA) is updating the materials that are incorporated by reference (IBR) into the Oregon State Implementation Plan (SIP). The regulations affected by this update have been previously submitted by Oregon and approved by the EPA. In this final rule, the EPA is also notifying the public of corrections and clarifying changes in the Code of Federal Regulations (CFR) tables that identify the materials incorporated by reference into the Oregon SIP. This update affects the materials that are available for public inspection at the National Archives and Records Administration (NARA) and the EPA Regional Office.

DATES:

This action is effective August 7, 2025.

ADDRESSES:

The SIP materials for which incorporation by reference into 40 CFR part 52 is finalized through this action are available for inspection at the following locations: Environmental Protection Agency, Region 10, 1200 Sixth Avenue, Suite 155, Seattle, WA 98101; and www.regulations.gov. To view the materials at the Region 10 Office, the EPA requests that you email the contact listed in the FOR FURTHER INFORMATION CONTACT section to schedule your inspection. The Regional Office's official hours of business are Monday through Friday 8:30 a.m. to 4:30 p.m., excluding Federal holidays.

FOR FURTHER INFORMATION CONTACT:

Claudia Vaupel, EPA Region 10, 1200 Sixth Avenue-Suite 155, Seattle, WA 98101, at 206-553-6121, or vaupel.claudia@epa.gov.

SUPPLEMENTARY INFORMATION:

I. Background

Each State has a SIP containing the control measures and strategies used to attain and maintain the national ambient air quality standards (NAAQS). The SIP is extensive, containing such elements as air pollution regulations, emissions inventories, monitoring networks, attainment demonstrations, and enforcement mechanisms, among other elements. In developing the SIP, the State formally adopts the control measures and strategies used to attain and maintain the NAAQS and submits them to the EPA for review and approval. 1 The EPA approves the State's submitted regulatory provisions and codifies them in part 52, "Approval and Promulgation of Implementation Plans," of Title 40 of the Code of Federal Regulations (40 CFR part 52). In codifying the State regulatory provisions, the full text is not reproduced in its entirety in 40 CFR part 52 but is "incorporated by reference" as of a specific effective date. The public is referred to the location of the full text version for the specifics of each State regulatory provision incorporated by reference into the SIP. The information provided allows the EPA and the public to monitor the extent to which a State implements and enforces the SIP.

Footnotes:

1 ?See Clean Air Act section 110(a)(1) and (2).

The SIP is a living document that is revised by the State as necessary to address the unique air pollution problems in the State. A SIP revision may include changes to one or more regulations in their entirety, or portions of regulations. The State indicates the changes in the submitted SIP revision (such as by using redline/strikethrough text) and the EPA takes action on the requested changes. The EPA establishes a docket for each action using a unique Docket Identification Number, listed in each Federal Register document. The docket and complete submission are available for viewing on www.regulations.gov.

On May 22, 1997 (62 FR 27968), the EPA began implementing revised procedures for incorporating regulatory provisions by reference into the Code of Federal Regulations for each SIP. The revised procedures updated the format for the identification of each SIP in 40 CFR part 52, streamlined the mechanism for announcing EPA approval of SIP revisions, and streamlined the mechanism for updating the "IBR material" (the full text of the regulatory provisions and source-specific permits, etc.) incorporated by reference into each SIP in 40 CFR part 52. The revised procedures also called for the EPA to maintain a "SIP Compilation" of the IBR material for each State.

The EPA must update each SIP Compilation and periodically publish an informational document in the rules section of the Federal Register notifying the public that updates have been made to a SIP Compilation for a particular State. The EPA began applying the 1997 revised procedures to the Oregon SIP on December 10, 2013 (78 FR 74012). The EPA subsequently published updates to the Oregon SIP IBR materials on April 10, 2019 (84 FR 14272) and December 20, 2022 (87 FR 77720).

A. Approved and Incorporated by Reference Regulatory Materials

Since the last published update to the Oregon SIP IBR materials, the EPA took two actions, on July 23, 2024 (89 FR 59610) and October 8, 2024 (89 FR 81361), to approve and incorporated by reference a number of regulatory provisions into the Oregon SIP at 40 CFR 52.1970(c) and (d). The approval actions and associated regulatory provisions are described in the following paragraphs of this preamble.

1. Paragraph (c) EPA Approved Regulations and Statutes

a. Action on July 23, 2024 (89 FR 59610):

• OAR 340-200-0020 General Air Quality Definitions (defining terms used in the Oregon air quality regulations), State effective March 1, 2023;

• OAR 340-200-0025 Abbreviations and Acronyms (defining abbreviations and acronyms used in the Oregon air quality regulations), State effective March 1, 2023;

• OAR 340-200-0035 Reference Materials (specifying the title and version of each reference material used in the Oregon air quality regulations), State effective March 1, 2023;

• OAR 340-204-0300 Designation of Sustainment Areas (identifying the areas in Oregon designated as sustaining the relevant air quality standard), State effective March 1, 2023;

• OAR 340-204-0310 Designation of Reattainment Areas (identifying the areas in Oregon designated as reattaining the relevant air quality standard), State effective March 1, 2023;

• OAR 340-206-0010 Introduction (establishing significant harm levels for pollutants in areas based on priority level), State effective March 1, 2023;

• OAR 340-208-0110 Visible Air Contaminant Limitations (establishing limits and test methods for visible emissions), State effective March 1, 2023;

• OAR 340-209-0080 Issuance or Denial of a Permit (specifying procedures for issuing and denying permits, including how to request a hearing to contest a permit decision), State effective March 1, 2023;

• OAR 340-210-0100 Registration in General (identifying categories of sources that are required to register with the Oregon DEQ), State effective March 1, 2023;

• OAR 340-210-0205 Notice of Construction and Approval of Plans: Applicability and Requirements, except paragraph (3) (listing source types and activities that require notice to the Oregon DEQ prior to construction), State effective March 1, 2023;

• OAR 340-210-0225 Notice of Construction and Approval of Plans: Types of Construction/Modification Changes (establishing the activities that qualify for each type of notice of construction), State effective March 1, 2023;


[top] • OAR 340-210-0230 Notice of Construction and Approval of Plans: page 38011 Notice to Construct Application (requiring the specific information to be submitted in an application), State effective March 1, 2023;

• OAR 340-210-0240 Notice of Construction and Approval of Plans: Construction Approval (specifying what level of approval from Oregon DEQ is needed before a source may begin construction), State effective March 1, 2023;

• OAR 340-210-0250 Notice of Construction and Approval of Plans: Approval to Operate (specifying what is required of a source to obtain approval to operate), State effective March 1, 2023;

• OAR 340-214-0110 Reporting: Request for Information (requiring sources to respond to Oregon DEQ requests for information), State effective March 1, 2023;

• OAR 340-214-0114, Reporting: Records; Maintaining and Reporting (detailing when and how to record and report data), State effective March 1, 2023;

• OAR 340-214-0130 Reporting: Information Exempt from Disclosure (establishing that trade secrets and other eligible data may be exempt from disclosure), State effective March 1, 2023;

• OAR 340-216-0020 Applicability and Jurisdiction (identifying source categories subject to Division 216 regarding air contaminant discharge permits), State effective March 1, 2023;

• OAR 340-216-0025 Types and Permits (identifying the types of air contaminant discharge permits), State effective March 1, 2023;

• OAR 340-216-0040 Application Requirements (spelling out the information required to be included in permit applications), State effective March 1, 2023;

• OAR 340-216-0054 Short Term Activity ACDPs (listing the pilot and other time-limited activities that may be eligible for a short term activity ACDP), State effective March 1, 2023;

• OAR 340-216-0056 Basic ACDPs (identifying the contents of a basic ACDP), State effective March 1, 2023;

• OAR 340-216-0060 General Air Contaminant Discharge Permits (identifying the contents of a general ACDP), State effective March 1, 2023;

• OAR 340-216-0064 Simple ACDPs (identifying the contents of a simple ACDP), State effective March 1, 2023;

• OAR 340-216-0066 Standard ACDPs (identifying the contents of a standard ACDP), State effective March 1, 2023;

• OAR 340-216-0068 Simple and Standard ACDP Attachments (allowing Oregon DEQ to add requirements to existing simple and standard ACDP permits), State effective March 1, 2023;

• OAR 340-216-0082 Expiration, Termination, Reinstatement or Revocation of an ACDP (regulating when and how ACDPs expire, are terminated, reinstated or revoked), State effective March 1, 2023;

• OAR 340-216-0084 Department Initiated Modification (establishing a means by which Oregon DEQ may modify an ACDP when needed), State effective March 1, 2023;

• OAR 340-216-8010 Table 1-Activities and Sources (listing which source categories and associated activities must obtain an ACDP), State effective March 1, 2023;

• OAR 340-216-8020 Table 2-Air Contaminant Discharge Permits, except paragraph (2) and Table 2 (requiring sources to pay ACDP fees to the Oregon DEQ), State effective March 1, 2023;

• OAR 340-222-0020 Applicability and Jurisdiction (requiring that plant site emission limits are included in most ACDPs and title V operating permits), State effective March 1, 2023;

• OAR 340-222-0035 General Requirements for Establishing All PSELs (describing how plant site emission limits are established and how they are revised), State effective March 1, 2023;

• OAR 340-222-0041 Annual PSELs (prescribing how annual plant site emission limits are established on a source-specific basis), State effective March 1, 2023;

• OAR 340-222-0042 Short Term PSEL (establishing short term limits for sources located in areas with an established short term significant emission rate), State effective March 1, 2023;

• OAR 340-222-0046 Netting Basis (establishing netting basis requirements), State effective March 1, 2023;

• OAR 340-224-0030 New Source Review Procedural Requirements (establishing application and processing procedures for new source review permits), State effective March 1, 2023;

• OAR 340-224-0520 Net Air Quality Benefit Emission Offsets: Requirements for Demonstrating Net Air Quality Benefit for Ozone Areas (requiring certain sources to offset emissions in areas with ozone problems), State effective March 1, 2023;

• OAR 340-224-0530 Net Air Quality Benefit Emission Offsets: Requirements for Demonstrating Net Air Quality Benefit for Non-Ozone Areas (requiring sources to offset emissions in areas with particulate matter problems), State effective March 1, 2023;

• OAR 340-225-0030 Procedural Requirements (prescribing the procedures for air quality analysis), State effective March 1, 2023;

• OAR 340-225-0050 Requirements for Analysis in PSD Class II and Class III Areas (establishing the modeling requirements for sources in PSD class II and III areas), State effective March 1, 2023;

• OAR 340-225-0070 Requirements for Demonstrating Compliance with Air Quality Related Values Protection (describing how to comply with limits established for national parks, wilderness, and other areas), State effective March 1, 2023;

• OAR 340-226-0100 Highest and Best Practicable Treatment and Control: Policy and Application (requiring appropriate conditions in permits to control and treat emissions to the highest extent), State effective March 1, 2023;

• OAR 340-226-0130 Highest and Best Practicable Treatment and Control: Typically Achievable Control Technology (TACT) (laying out when and how the Oregon DEQ will make typically achievable control technology determinations), State effective March 1, 2023;

• OAR 340-226-0140 Highest and Best Practicable Treatment and Control: Additional Control Requirements for Stationary Sources of Air Contaminants (providing that the Oregon DEQ will establish additional control requirements to protect the NAAQS, visibility, and other public health and environmental goals), State effective March 1, 2023;

• OAR 340-226-0210 Grain Loading Standards: Particulate Emission Limitations for Sources Other Than Fuel Burning Equipment, Refuse Burning Equipment and Fugitive Emissions (establishing particulate emission standards for non-fuel burning equipment), State effective March 1, 2023;

• OAR 340-228-0210 General Emission Standards for Fuel Burning Equipment: Grain Loading Standards (setting grain loading standards for fuel-burning equipment), State effective March 1, 2023;

• OAR 340-232-0030 Definitions (defining terms used in the rules establishing emission standards for VOC point sources), State effective March 1, 2023;

• OAR 340-232-0040 General Non-Categorical Requirements (spelling out general case-by-case RACT requirements for VOC point sources), State effective March 1, 2023;


[top] • OAR 340-232-0090 Bulk Gasoline Terminals Including Truck and Trailer Loading (VOC emission limits for bulk page 38012 gasoline terminals), State effective March 1, 2023;

• OAR 340-232-0160 Surface Coating in Manufacturing (VOC emission limits for surface coating operations), State effective March 1, 2023;

• OAR 340-232-0170 Aerospace Component Coating Operations (VOC emission limits for component coating in the aerospace industry), State effective March 1, 2023;

• OAR 340-234-0010 Definitions except (8) and (10) (defining terms used in the rules establishing emission standards for the wood products industry), State effective March 1, 2023;

• OAR 340-234-0210 Kraft Pulp Mills: Emission Limitations, except references to total reduced sulfur (setting emission limits for kraft pulp mills), State effective March 1, 2023; and

• OAR 340-236-8010 Hot Mix Asphalt Plants: Table-Process Weight Table (requiring hot mix asphalt plants to comply with specific process weight discharge rates), State effective March 1, 2023.

b. Action on October 8, 2024 (89 FR 81361):

• OAR 340-223-0010 Purpose (for maintaining reasonable progress and other requirements associated with Oregon's implementation of the Federal Regional Haze Rule), State effective July 26, 2021;

• OAR 340-223-0020 Definitions (updating this section to account for revised program requirements between the first regional haze implementation period and the second implementation period), State effective July 26, 2021;

• OAR 340-223-0100 Screening Methodology for Sources for Round II of Regional Haze (establishing the criteria for selecting sources for review under the regional haze program), State effective July 26, 2021;

• OAR 340-223-0110 Options for Compliance with Round II of Regional Haze (establishing requirements for sources and compliance options under the regional haze program), State effective July 26, 2021;

• OAR 340-223-0120 Four Factor Analysis (establishing the requirements for assessing potential controls for reasonable progress under the regional haze program), State effective July 26, 2021; and

• OAR 340-223-0130 Final Orders Ordering Compliance with Round II of Regional Haze (establishing unilateral order authority and procedures for contested case hearings under the regional haze program), State effective July 26, 2021.

2. Paragraph (d) EPA Approved State Source-Specific Requirements

a. Action on October 8, 2024 (89 FR 81361):

• Ash Grove Cement Company, Permit No. 01-0029-TV-01, permit conditions (3), (9) through (11), (14), (16) through (28), (42), (45) through (76), (84) through (97), (99), (100), and (102) only, State effective October 16, 2020;

• Biomass One, L.P., Order No. 15-0159, State effective August 9, 2021;

• Boise Cascade Wood Products, LLC-Elgin Complex, Order No. 31-0006, State effective August 12, 2021;

• Boise Cascade Wood Products, LLC-Elgin Complex, Permit No. 31-0006-TV-01, permit conditions (56), (59) through (75), (77), and (78) only, State effective December 5, 2016;

• Boise Cascade Wood Products, LLC-Medford, Order No. 15-0004, State effective August 9, 2021;

• Boise Cascade Wood Products, LLC-Medford, Permit No. 15-0004-TV-01, permit conditions (71), (72), and (74) through (88) only, State effective February 20, 2020;

• Cascade Pacific Pulp, LLC-Halsey Pulp Mill, Order No. 22-3501-A2, State effective August 25, 2023;

• Cascades Tissue Group: A Division of Cascades Holding US Inc., Order No. 05-1849, State effective August 18, 2021;

• Cascades Tissue Group: A Division of Cascades Holding US Inc., Permit No. 05-1849-TV-01, permit conditions (24), (25), (27), and (29) through (43) only, State effective April 6, 2018;

• Collins Products, L.L.C., Permit No. 18-0013-TV-01, permit conditions (3), (14) through (16), (19) through (24), (34 through (42), (63) through (75), and (77) only, State effective January 26, 2015;

• Columbia Forest Products, Inc., Permit No. 18-0014-TV-01, permit conditions (3), (8) through (20), (22), (23), (34) through (52), (58) through (66), (67-introductory paragraph), (67.a), (67.b.iii) through (67.b.v), and (68) through (70) only, State effective September 26, 2017;

• EVRAZ Inc, Order No. 26-1865, State effective August 9, 2021;

• Gas Transmission Northwest LLC-Compressor Station 12, Order No. 09-0084, State effective August 9, 2021;

• Gas Transmission Northwest LLC-Compressor Station 12, Permit No. 09-0084-TV-01, permit conditions (32) through (34) and (37) through (50) only, State effective August 10, 2017;

• Gas Transmission Northwest LLC-Compressor Station 13, Order No. OAH CASE NO. 2021-ABC-04835/DEQ CASE NO. AQ/RH-HQ-2021-140, State effective June 1, 2022;

• Gas Transmission Northwest LLC-Compressor Station 13, Permit No. 18-0096-TV-01, permit conditions (24) through (26), (32) through (35), and (37) through (44) only, State effective July 11, 2018;

• Georgia-Pacific-Toledo LLC, Order No. 21-0005, Amendment No. 21-005-A1, State effective December 5, 2022;

• Georgia Pacific-Wauna Mill, Order No. 04-0004, Amendment No. 04-004-A1, State effective December 5, 2022;

• Gilchrist Forest Products, Permit No. 18-0005-TV-01, permit conditions (4), (5), (9), (10), (12) though (19), (41) through (43), (45) through (59), and (61) only, State effective July 25, 2023;

• International Paper-Springfield, Order No. 208850, State August 9, 2021;

• International Paper-Springfield, Permit No. 208850, permit conditions (186) through (189), (192), and (198) only, State effective October 4, 2016;

• JELD-WEN, Permit No. 18-0006-TV-01, permit conditions (55) through (77) and (80) through (87) only, State effective December 01, 2021;

• JELD-WEN, Permit No. 18-0006-TV-01, Addendum No, 1, permit conditions 53 and 53b only, State effective August 11, 2022;

• Kingsford Manufacturing Company, Permit No. 204402, addendum No. 2, permit conditions (71) through (73) and (75) through (91) only, State effective November 15, 2021;

• Klamath Energy LLC-Klamath Cogeneration, Permit No. 18-0003-TV-01, permit conditions (10) through (16), (18), (24) through (28), (32) through (37), (39) through (49), (51), (52), and (54), and (56) only, State effective June 12, 2017;

• Klamath Energy LLC-Klamath Cogeneration, Permit No. 18-0003-TV-01, Addendum No. 1, permit conditions (3.a), (3.b), (61.l), and (66.b.xii), State effective December 8, 2020;

• Northwest Pipeline LLC-Baker Compressor Station, Order No. 01-0038, amendment 01-0038-A1, State effective February 1, 2022;

• Northwest Pipeline LLC-Baker Compressor Station, Permit No. 01-0038-TV-01, permit conditions (27) through (30) and (32) through (43) only, State effective January 12, 2017;

• Northwest Pipeline LLC-Oregon City Compressor Station, Order No. 03-2729, amendment 03-2729-A1, State effective February 1, 2022;

• Northwest Pipeline LLC-Oregon City Compressor Station, Permit No. 03-2729-TV-01, permit conditions (7), (19), (25) through (27), (38), (41), (45), and (50) through (65) only, State effective February 19, 2013;


[top] • Ochoco Lumber Company, Permit No. 12-0032-ST-01, permit conditions page 38013 (1.1) through (1.3), (1.6), (2.1) through (2.5), (4.1) though (4.4), and (5.1) through (6.2) only, State effective June 25, 2019;

• Owens-Brockway Glass Container Inc., Order No. 26-1876, State effective August 9, 2021;

• Owens-Brockway Glass Container Inc., Permit No. 26-1876-TV-01, permit conditions (33) through (48) only, State effective December 10, 2019,

• Pacific Wood Laminates, Inc., Permit No. 08-0003-TV-01, permit conditions (3), (9), (10), (12) through (19), (26) through (41), (56) through (71), and (73) only, State effective December 30, 2019;

• PGE Beaver Plant/Port Westward I Plant, Order No. 05-2606, State effective August 10, 2021;

• PGE Beaver Plant/Port Westward I Plant, Permit No. 05-2520, permit conditions (62) through (66), (68) through (78), (79.a), (80) through (83), (85), (87), (88.a), (89.d), (89.f), and (89.i) only, State effective January 21, 2009;

• Roseburg Forest Products-Dillard, Order No. 10-0025, State effective August 9, 2021;

• Roseburg Forest Products-Medford MDF, Permit No. 15-0073-TV-01, permit conditions (44) through (46), (48) through (61), (63), and (64) only, State effective August 18, 2022;

• Roseburg Forest Products-Riddle Plywood, Permit No. 10-0078-TV-01, permit conditions (65), (66), (68) through (81) only, State effective July 31, 2019;

• Swanson Group Mfg. LLC, Permit No. 10-0045-TV-01, permit conditions (4), (10) through (24), (25-introductory paragraph), (25.a) through (25.c), (27) through (40), (50) through (64), and (66) only, State effective June 12, 2017;

• Timber Products Co. Limited Partnership, Permit No. 15-0025-TV-01, permit conditions (70) through (72) and (74) through (90) only, State effective June 23, 2022;

• Willamette Falls Paper Company, Order No. 03-2145, State effective August 9, 2021;

• Willamette Falls Paper Company, Permit No. 03-2145-TV-01, permit conditions (40) through (55) only, State effective February 24, 2016; and

• Woodgrain Millwork LLC-Particleboard, Permit No. 31-0002-TV-01, permit conditions (3), (12) through (21), (22-introductory paragraph), (22.a), (22.e), (22.f), (23), (25) though (28), (30) through (35), (37), (39) through (41), (43), (44), (46), (48), (49), (51) through (72), (80) through (94), and (96) only, State effective May 24, 2021.

B. Regulatory Materials Removed From Incorporation by Reference

Since the last published update to the Oregon SIP IBR materials, the EPA also removed regulatory materials from the Oregon SIP at 40 CFR 52.1970(c). The actions and associated regulatory provisions removed from incorporation by reference are described in the following paragraphs of this preamble. No IBR material was removed from paragraph (d).

1. Paragraph (c) EPA Approved Regulations and Statutes

a. Action on July 23, 2024 (89 FR 59610):

• OAR 340-210-0215, Notice of Construction and Approval of Plans: Requirement (requirements to notify the Oregon DEQ prior to constructing or modifying a subject source), State effective April 16, 2015;

• OAR 340-222-0040, Generic Annual PSEL (establishing generic plant site emission limits for subject sources that emit less than the significant emission rate), State effective April 16, 2015;

• OAR 340-021-200 Purpose (describing the purpose of contingency control requirements for existing industrial sources in coarse particulate matter nonattainment areas), State effective May 1, 1995;

• OAR 340-021-205 Relation to Other Rules (describing the relation of contingency control requirements to other regulations), State effective March 10, 1993;

• OAR 340-021-210 Applicability (stating that contingency control requirements shall apply if the EPA determines an area has failed to attain the PM 10 standard by the applicable attainment date), State effective March 10, 1993;

• OAR 340-021-215 Definitions (establishing definitions used in the contingency control requirements), State effective March 10, 1993;

• OAR 340-021-220 Compliance Schedule for Existing Sources (setting the compliance schedule for sources to install emissions control systems as a contingency control requirement), State effective March 10, 1993;

• OAR 340-021-225 Wood-Waste Boilers (limiting emissions from wood-waste boilers to a specific rate as a contingency control requirement), State effective March 10, 1993;

• OAR 340-021-230 Wood Particle Dryers at Particleboard Plants (limiting emissions from wood particle dryers to a specific rate as a contingency control requirement), State effective March 10, 1993;

• OAR 340-021-235 Hardboard Manufacturing Plants (limiting emissions from hardboard manufacturing plants to a specific rate as a contingency control requirement), State effective March 10, 1993;

• OAR 340-021-240, Air Conveying Systems (limiting emissions from air conveying systems to a specific rate as a contingency control requirement), State effective March 10, 1993; and

• OAR 340-021-245, Fugitive Emissions (requiring wood products manufacturing plants to limit fugitive emissions as a contingency control requirement), State effective March 10, 1993.

2. Action on October 8, 2024 (89 FR 81361):

• OAR 340-223-0030 BART and Additional Regional Haze Requirements for the Foster-Wheeler Boiler at the Boardman Coal-Fired Power Plant (Federal Acid Rain Program Facility ORISPL Code 6106 (establishing nitrogen oxide and sulfur dioxide emission limits, retrofit control technology and fuel requirements for the Foster-Wheeler Boiler), State effective December 10, 2010;

• OAR 340-223-0040 Federally Enforceable Permit Limits (requirements for sources that accept a federally enforceable limit to avoid specific best available retrofit technology requirements), State effective December 10, 2010;

• OAR 340-223-0050 Alternative Regional Haze Requirements for the Foster-Wheeler Boiler at the Boardman Coal-Fired Power Plant (Federal Acid Rain Program Facility ORISPL Code 6106 (regional haze compliance options and dates for the Foster-Wheeler Boiler), State effective December 10, 2010; and

• OAR 340-223-0080 Alternative Requirements for the Foster-Wheeler Boiler at the Boardman Coal-Fired Power Plant (Federal Acid Rain Program Facility ORISPL Code 6106) Based Upon Permanently Ceasing the Burning of Coal Within Five Years of EPA Approval of the Revision to the Oregon Clean Air Act State Implementation Plan Incorporating OAR Chapter 340, Division 223 (regional haze compliance options and dates for the Foster-Wheeler Boiler if it ceases to burn coal), State effective December 10, 2010.

II. EPA Action


[top] In this action, the EPA is providing notification of an update to the materials incorporated by reference into the Oregon SIP as of June 1, 2025, and identified in 40 CFR 52.1970(c) and (d). This update includes SIP materials submitted by Oregon and approved by page 38014 the EPA since the last IBR update. See 87 FR 77720 (December 20, 2022).

In addition, the EPA is providing notification of the following corrections:

40 CFR 52.1970(c): correcting entry "629-048-0110" to reflect that a revision to this regulation was approved in the EPA action on May 25, 2021 (86 FR 27976); and

40 CFR 52.1970(e): correcting the entry for "ODEQ Continuous Emissions Monitoring Manual" in Table 5 to include the statewide applicable geographic area, which was inadvertently left blank in the action on October 11, 2017 (82 FR 47122).

III. Good Cause Exemption

The EPA has determined that this action falls under the "good cause" exemption in section 553(b)(3)(B) of the Administrative Procedure Act (APA) which, upon finding "good cause," authorizes agencies to dispense with public participation and section 553(d)(3) which allows an agency to make an action effective immediately (thereby avoiding the 30-day delayed effective date otherwise provided for in the APA). This administrative action simply codifies provisions which are already in effect as a matter of law in Federal and approved State programs, makes corrections and clarifying changes to the tables in the CFR, and makes ministerial changes to the prefatory heading to the tables in the CFR. Under section 553 of the APA, an agency may find good cause where procedures are "impracticable, unnecessary, or contrary to the public interest." Public comment for this administrative action is "unnecessary" and "contrary to the public interest" since the codification (and corrections) only reflect existing law. Immediate notice of this action in the Federal Register benefits the public by providing the public notification of the updated Oregon SIP Compilation and notification of corrections to the Oregon "Identification of Plan" portion of the CFR. Further, pursuant to section 553(d)(3), making this action immediately effective benefits the public by immediately updating both the SIP Compilation and the CFR "Identification of plan" section (which includes table entry corrections).

IV. Incorporation by Reference

In this document, The EPA is finalizing regulatory text that includes incorporation by reference. In accordance with requirements of 1 CFR 51.5, The EPA is finalizing the incorporation by reference of regulations promulgated by Oregon, previously approved by the EPA and federally effective before June 1, 2025, contained in Volume I, 40 CFR 52.1970(c), EPA approved regulations and statutes, and Volume II, 40 CFR 52.1970(d) EPA approved state source-specific requirements, described in section II. of this preamble. The EPA has made, and will continue to make, these materials generally available through www.regulations.gov and at the EPA Region 10 Office (please contact the person identified in the FOR FURTHER INFORMATION CONTACT section of this preamble for more information).

V. Statutory and Executive Order Reviews

Under the Clean Air Act, the Administrator is required to approve a SIP submission that complies with the provisions of the Clean Air Act and applicable Federal regulations. 42 U.S.C. 7410(k); 40 CFR 52.02(a). Thus, in reviewing SIP submissions, EPA's role is to approve State choices, provided that they meet the criteria of the Clean Air Act. Accordingly, this action merely approves State law as meeting Federal requirements and does not impose additional requirements beyond those imposed by State law. For that reason, this action:

• Is not a significant regulatory action subject to review by the Office of Management and Budget under Executive Order 12866 (58 FR 51735, October 4, 1993);

• Is not subject to Executive Order 14192 (90 FR 9065, February 6, 2025) because SIP actions are exempt from review under Executive Order 12866:

• Does not impose an information collection burden under the provisions of the Paperwork Reduction Act (44 U.S.C. 3501 et seq. );

• Is certified as not having a significant economic impact on a substantial number of small entities under the Regulatory Flexibility Act (5 U.S.C. 601 et seq. );

• Does not contain any unfunded mandate or significantly or uniquely affect small governments, as described in the Unfunded Mandates Reform Act of 1995 (Pub. L. 104-4);

• Does not have federalism implications as specified in Executive Order 13132 (64 FR 43255, August 10, 1999);

• Is not subject to Executive Order 13045 (62 FR 19885, April 23, 1997) because it approves a State program;

• Is not a significant regulatory action subject to Executive Order 13211 (66 FR 28355, May 22, 2001); and

• Is not subject to requirements of section 12(d) of the National Technology Transfer and Advancement Act of 1995 (15 U.S.C. 272 note) because application of those requirements would be inconsistent with the Clean Air Act.

In addition, the SIP is not approved to apply on any Indian reservation land or in any other area where EPA or an Indian Tribe has demonstrated that a Tribe has jurisdiction. In those areas of Indian country, the rule does not have Tribal implications and will not impose substantial direct costs on Tribal governments or preempt Tribal law as specified by Executive Order 13175 (65 FR 67249, November 9, 2000).

This action is subject to the Congressional Review Act, and EPA will submit a rule report to each House of the Congress and to the Comptroller General of the United States. This action is not a "major rule" as defined by 5 U.S.C. 804(2).

Under section 307(b)(1) of the Clean Air Act, petitions for judicial review of this action must be filed in the United States Court of Appeals for the appropriate circuit by October 6, 2025. Filing a petition for reconsideration by the Administrator of this final rule does not affect the finality of this action for the purposes of judicial review nor does it extend the time within which a petition for judicial review may be filed, and shall not postpone the effectiveness of such rule or action. This action may not be challenged later in proceedings to enforce its requirements. (See section 307(b)(2).)

List of Subjects in 40 CFR Part 52

Environmental protection, Air pollution control, Carbon monoxide, Incorporation by reference, Intergovernmental relations, Lead, Nitrogen dioxide, Ozone, Particulate matter, Reporting and recordkeeping requirements, Sulfur oxides, Volatile organic compounds.

Dated: July 18, 2025.

Emma Pokon,

Regional Administrator, Region 10.

For the reasons set forth in the preamble, EPA is amending 40 CFR part 52 as follows:

PART 52-APPROVAL AND PROMULGATION OF IMPLEMENTATION PLANS

1. The authority citation for part 52 continues to read as follows:

Authority:

42 U.S.C. 7401 et seq.

Subpart MM-Oregon

2. In §?52.1970, paragraphs (b), (c), (d) and (e) are revised to read as follows:

§?52.1970 Identification of plan.


[top] (b) Incorporation by reference. page 38015

(1) Material listed in paragraphs (c) and (d) of this section with an EPA approval date prior to June 1, 2025, was approved for incorporation by reference by the Director of the Federal Register in accordance with 5 U.S.C. 552(a) and 1 CFR part 51. Material is incorporated as it exists on the date of the approval and notification of any change in the material will be published in the Federal Register . Entries in paragraphs (c) and (d) of this section with EPA approval dates after June 1, 2025, will be incorporated by reference in the next update to the SIP compilation.

(2) EPA Region 10 certifies that the rules/regulations provided by the EPA in the SIP compilation at the addresses in paragraph (b)(3) of this section are an exact duplicate of the officially promulgated State rules/regulations which have been approved as part of the State Implementation Plan as of the dates referenced in paragraph (b)(1) of this section.

(3) Copies of the materials incorporated by reference may be inspected at the Region 10 EPA Office at 1200 Sixth Avenue, Suite 155, Seattle, WA 98101. To obtain the material, please call (206) 553-6357. You may inspect the material with an EPA approval date prior to June 1, 2025, for Oregon at the National Archives and Records Administration (NARA). For information on the availability of this material at NARA email fedreg.legal@nara.gov or go to www.archives.gov/federal-register/cfr/ibr-locations.

(c) EPA approved regulations and statutes.

State citation Title/subject State effective date EPA approval date Explanations
ORS 477.515 Permits 1971 11/1/2001, 66 FR 55105 Permits required for fires on forestlands; waiver, permit conditions, smoke management plan; restricted areas, rules and excepted areas.

page 38016page 38017page 38018page 38019page 38020page 38021page 38022page 38023page 38024page 38025page 38026page 38027


[top] 
State citation Title/subject State effective date EPA approval date Explanations
Chapter 340-Department of Environmental Quality
Division 200-General Air Pollution Procedures and Definitions
200-0010 Purpose and Application 4/16/2015 10/11/2017, 82 FR 47122
200-0020 General Air Quality Definitions 3/1/2023 7/23/2024, 89 FR 59610
200-0025 Abbreviations and Acronyms 3/1/2023 7/23/2024, 89 FR 59610
200-0030 Exceptions 4/16/2015 10/11/2017, 82 FR 47122
200-0035 Reference Materials 3/1/2023 7/23/2024, 89 FR 59610
Division 202-Ambient Air Quality Standards and PSD Increments
202-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
202-0020 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
Ambient Air Quality Standards
202-0050 Purpose and Scope of Ambient Air Quality Standards 4/16/2015 10/11/2017, 82 FR 47122
202-0060 Suspended Particulate Matter 10/16/2015 5/24/2018, 83 FR 24034
202-0070 Sulfur Dioxide 4/16/2015 10/11/2017, 82 FR 47122
202-0080 Carbon Monoxide 7/1/2011 1/22/2003, 68 FR 2891
202-0090 Ozone 7/13/2017 5/24/2018, 83 FR 24034
202-0100 Nitrogen Dioxide 4/16/2015 10/11/2017, 82 FR 47122
202-0130 Lead 4/16/2015 10/11/2017, 82 FR 47122
Prevention of Significant Deterioration Increments
202-0200 General 4/16/2015 10/11/2017, 82 FR 47122
202-0210 Ambient Air PSD Increments 4/16/2015 10/11/2017, 82 FR 47122
202-0220 Ambient Air Ceilings 4/16/2015 10/11/2017, 82 FR 47122
202-0225 Ambient Air Quality Impact Levels for Maintenance Areas 4/16/2015 10/11/2017, 82 FR 47122
Division 204-Designation of Air Quality Areas
204-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
204-0020 Designation of Air Quality Control Regions 4/16/2015 10/11/2017, 82 FR 47122
204-0030 Designation of Nonattainment Areas 4/16/2015 10/11/2017, 82 FR 47122
204-0040 Designation of Maintenance Areas 4/16/2015 10/11/2017, 82 FR 47122
204-0050 Designation of Prevention of Significant Deterioration Areas 4/16/2015 10/11/2017, 82 FR 47122
204-0060 Redesignation of Prevention of Significant Deterioration Areas 4/16/2015 10/11/2017, 82 FR 47122
204-0070 Special Control Areas 4/16/2015 10/11/2017, 82 FR 47122
204-0080 Motor Vehicle Inspection Boundary Designations 4/16/2015 10/11/2017, 82 FR 47122
204-0090 Oxygenated Gasoline Control Areas 4/16/2015 10/11/2017, 82 FR 47122
Designation of Areas
204-0300 Designation of Sustainment Areas 3/1/2023 7/23/2024, 89 FR 59610
204-0310 Designation of Reattainment Areas 3/1/2023 7/23/2024, 89 FR 59610
204-0320 Priority Sources 4/16/2015 10/11/2017, 82 FR 47122
Division 206-Air Pollution Emergencies
206-0010 Introduction 3/1/2023 7/23/2024, 89 FR 59610
206-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
206-0030 Episode State Criteria for Air Pollution Emergencies 4/16/2015 10/11/2017, 82 FR 47122
206-0040 Special Conditions 4/16/2015 10/11/2017, 82 FR 47122
206-0050 Source Emission Reduction Plans 4/16/2015 10/11/2017, 82 FR 47122
206-0060 Regional Air Pollution Authorities 4/16/2015 10/11/2017, 82 FR 47122
206-0070 Operations Manual 4/16/2015 10/11/2017, 82 FR 47122
206-8010 Air Pollution Episode ALERT Conditions Source Emission Reduction Plan Emissions Control Actions to be Taken as Appropriate in Alert Episode Area 4/16/2015 10/11/2017, 82 FR 47122
206-8020 Air Pollution Episode WARNING Conditions Emission Reduction Plan 4/16/2015 10/11/2017, 82 FR 47122
206-8030 Air Pollution Episode EMERGENCY Conditions Emission Reduction Plan 4/16/2015 10/11/2017, 82 FR 47122
206-8040 Air Pollution Episode Conditions Due to Particulate Which is Primarily Fallout from Volcanic Activity or Windblown Dust 4/16/2015 10/11/2017, 82 FR 47122
Division 208-Visible Emissions and Nuisance Requirements
208-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
208-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Visible Emissions
208-0110 Visible Air Contaminant Limitations 3/1/2023 7/23/2024, 89 FR 59610
Fugitive Emission Requirements
208-0210 Requirements for Fugitive Emissions 4/16/2015 10/11/2017, 82 FR 47122
Division 209-Public Participation
209-0010 Purpose 4/16/2015 10/11/2017, 82 FR 47122
209-0020 Applicability 11/16/2018 10/31/2019, 84 FR 58324
209-0030 Public Notice Categories and Timing 11/16/2018 10/31/2019, 84 FR 58324
209-0040 Public Notice Information 11/16/2018 10/31/2019, 84 FR 58324
209-0050 Public Notice Procedures 11/16/2018 10/31/2019, 84 FR 58324
209-0060 Persons Required to be Notified 4/16/2018 10/11/2017, 82 FR 47122
209-0080 Issuance or Denial of a Permit 3/1/2023 7/23/2024, 89 FR 59610
Division 210-Stationary Source Notification Requirements
210-0010 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
210-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Registration
210-0100 Registration in General 3/1/2023 7/23/2024, 89 FR 59610
210-0110 Registration Requirements 4/16/2015 10/11/2017, 82 FR 47122
210-0120 Re-Registration and Maintaining Registration 4/16/2015 10/11/2017, 82 FR 47122
Notice of Construction and Approval of Plans
210-0205 Applicability 3/1/2023 7/23/2024, 89 FR 59610 Except paragraph (3).
210-0225 Types of Construction/Modification Changes 3/1/2023 7/23/2024, 89 FR 59610
210-0230 Notice to Construct 3/1/2023 7/23/2024, 89 FR 59610
210-0240 Construction Approval 3/1/2023 7/23/2024, 89 FR 59610
210-0250 Approval to Operate 3/1/2023 7/23/2024, 89 FR 59610
Division 212-Stationary Source Testing and Monitoring
212-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
212-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Sampling, Testing and Measurement
212-0110 Applicability 4/16/2015 10/11/2017, 82 FR 47122
212-0120 Program 4/16/2015 10/11/2017, 82 FR 47122
212-0130 Stack Heights and Dispersion Techniques 4/16/2015 10/11/2017, 82 FR 47122
212-0140 Methods 4/16/2015 10/11/2017, 82 FR 47122
212-0150 Department Testing 4/16/2015 10/11/2017, 82 FR 47122
Division 214-Stationary Source Reporting Requirements
214-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
214-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Reporting
214-0100 Applicability 4/16/2015 10/11/2017, 82 FR 47122
214-0110 Request for Information 3/1/2023 7/23/2024, 89 FR 59610
214-0114 Records; Maintaining and Reporting 3/1/2023 7/23/2024, 89 FR 59610
214-0120 Enforcement 10/14/1999 1/22/2003, 68 FR 2891
214-0130 Reporting: Information Exempt from Disclosure 3/1/2023 7/23/2024, 89 FR 59610
Emissions Statements for VOC and NO X Sources
214-0200 Purpose and Applicability 4/16/2015 10/11/2017, 82 FR 47122
214-0210 Requirements 4/16/2015 10/11/2017, 82 FR 47122
214-0220 Submission of Emission Statement 4/16/2015 10/11/2017, 82 FR 47122
Excess Emissions and Emergency Provision
214-0300 Purpose and Applicability 11/8/2007 12/27/2011, 76 FR 80747
214-0310 Planned Startup and Shutdown 11/8/2007 12/27/2011, 76 FR 80747
214-0320 Scheduled Maintenance 11/8/2007 12/27/2011, 76 FR 80747
214-0330 All Other Excess Emissions 11/8/2007 12/27/2011, 76 FR 80747
214-0340 Reporting Requirements 11/8/2007 12/27/2011, 76 FR 80747
214-0350 Enforcement Action Criteria 11/8/2007 12/27/2011, 76 FR 80747
214-0360 Emergency as an Affirmative Defense 11/8/2007 12/27/2011, 76 FR 80747
Division 216-Air Contaminant Discharge Permits
216-0010 Purpose 4/16/2015 10/11/2017, 82 FR 47122
216-0020 Applicability and Jurisdiction 3/1/2023 7/23/2024, 89 FR 59610
216-0025 Types of Permits 3/1/2023 7/23/2024, 89 FR 59610
216-0030 Definitions 11/16/2018 10/31/2019, 84 FR 58324
216-0040 Application Requirements 3/1/2023 7/23/2024, 89 FR 59610
216-0052 Construction ACDPs 4/16/2015 10/11/2017, 82 FR 47122
216-0054 Short-Term Activity ACDPs 3/1/2023 7/23/2024, 89 FR 59610
216-0056 Basic ACDPs 3/1/2023 7/23/2024, 89 FR 59610
216-0060 General Air Contaminant Discharge Permits 3/1/2023 7/23/2024, 89 FR 59610
216-0062 General ACDP Attachments 4/16/2015 10/11/2017, 82 FR 47122
216-0064 Simple ACDPs 3/1/2023 7/23/2024, 89 FR 59610
216-0066 Standard ACDPs 3/1/2023 7/23/2024, 89 FR 59610
216-0068 Simple and Standard ACDP Attachments 3/1/2023 7/23/2024, 89 FR 59610
216-0070 Permitting a Source with Multiple Activities or Processes at a Single Adjacent or Contiguous Site 4/16/2015 10/11/2017, 82 FR 47122
216-0082 Expiration, Termination, Reinstatement or Revocation of an ACDP 3/1/2023 7/23/2024, 89 FR 59610
216-0084 Department-Initiated Modification 3/1/2023 7/23/2024, 89 FR 59610
216-0090 Sources Subject to ACDPs and Fees 11/16/2018 10/31/2019, 84 FR 58324
216-0094 Temporary Closure 4/16/2015 10/11/2017, 82 FR 47122
216-8010 Table 1-Activities and Sources 3/1/2023 7/23/2024, 89 FR 59610
216-8020 Table 2-Air Contaminant Discharge Permits 3/1/2023 7/23/2024, 89 FR 59610 Except paragraph (2) and Table 2.
Division 222-Stationary Source Plant Site Emission Limits
222-0010 Policy 4/16/2015 10/11/2017, 82 FR 47122
222-0020 Applicability and Jurisdiction 3/1/2023 7/23/2024, 89 FR 59610
222-0030 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Criteria for Establishing Plant Site Emission Limits
222-0035 General Requirements for Establishing All PSELs 3/1/2023 7/23/2024, 89 FR 59610
222-0041 Source Specific Annual PSEL 3/1/2023 7/23/2024, 89 FR 59610
222-0042 Short Term PSEL 3/1/2023 7/23/2024, 89 FR 59610
222-0046 Netting Basis 3/1/2023 7/23/2024, 89 FR 59610
222-0048 Baseline Period and Baseline Emission Rate 4/16/2015 10/11/2017, 82 FR 47122
222-0051 Actual Emissions 4/16/2015 10/11/2017, 82 FR 47122
222-0055 Unassigned Emissions 4/16/2015 10/11/2017, 82 FR 47122
222-0080 Plant Site Emission Limit Compliance 4/16/2015 10/11/2017, 82 FR 47122
222-0090 Combining and Splitting Sources and Changing Primary SIC Code 4/16/2015 10/11/2017, 82 FR 47122
Division 223-Regional Haze Rules
223-0010 Purpose 7/26/2021 10/8/2024, 89 FR 81361
223-0020 Definitions 7/26/2021 10/8/2024, 89 FR 81361
223-0100 Screening Methodology for Sources for Round II of Regional Haze 7/26/2021 10/8/2024, 89 FR 81361
223-0110 Options for Compliance with Round II of Regional Haze 7/26/2021 10/8/2024, 89 FR 81361
223-0120 Four Factor Analysis 7/26/2021 10/8/2024, 89 FR 81361
223-0130 Final Orders Ordering Compliance with Round II of Regional Haze 7/26/2021 10/8/2024, 89 FR 81361
Division 224-New Source Review
224-0010 Applicability, General Prohibitions, General Requirements and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
224-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
224-0025 Major Modification 4/16/2015 10/11/2017, 82 FR 47122
224-0030 New Source Review Procedural Requirements 3/1/2023 7/23/2024, 89 FR 59610
224-0034 Exemptions 4/16/2015 10/11/2017, 82 FR 47122
224-0038 Fugitive and Secondary Emissions 4/16/2015 10/11/2017, 82 FR 47122
224-0040 Review of Sources Subject to Major NSR or Type A State NSR for Compliance with Regulations 4/16/2015 10/11/2017, 82 FR 47122
Major New Source Review
224-0045 Requirements for Sources in Sustainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0050 Requirements for Sources in Nonattainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0055 Requirements for Sources in Reattainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0060 Requirements for Sources in Maintenance Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0070 Prevention of Significant Deterioration Requirements for Sources in Attainment or Unclassified Areas 4/16/2015 10/11/2017, 82 FR 47122
State New Source Review
224-0245 Requirements for Sources in Sustainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0250 Requirements for Sources in Nonattainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0255 Requirements for Sources in Reattainment Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0260 Requirements for Sources in Maintenance Areas 4/16/2015 10/11/2017, 82 FR 47122
224-0270 Requirements for Sources in Attainment and Unclassified Areas 4/16/2015 10/11/2017, 82 FR 47122
Net Air Quality Benefit Emission Offsets
224-0500 Net Air Quality Benefit for Sources Locating within or Impacting Designated Area 4/16/2015 10/11/2017, 82 FR 47122
224-0510 Common Offset Requirements 4/16/2015 10/11/2017, 82 FR 47122 Except paragraph (3).
224-0520 Requirements for Demonstrating Net Air Quality Benefit for Ozone Areas 3/1/2023 7/23/2024, 89 FR 59610
224-0530 Requirements for Demonstrating Net Air Quality Benefit for Non-Ozone Areas 3/1/2023 7/23/2024, 89 FR 59610
224-0540 Sources in a Designated Area Impacting Other Designated Areas 4/16/2015 10/11/2017, 82 FR 47122
Division 225-Air Quality Analysis
225-0010 Purpose and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
225-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
225-0030 Procedural Requirements 3/1/2023 7/23/2024, 89 FR 59610
225-0040 Air Quality Models 4/16/2015 10/11/2017, 82 FR 47122
225-0045 Requirements for Analysis in Maintenance Areas 4/16/2015 10/11/2017, 82 FR 47122
225-0050 Requirements for Analysis in PSD Class I and Class III Areas 3/1/2023 7/23/2024, 89 FR 59610
225-0060 Requirements for Demonstrating Compliance with Standards and Increments in PSD Class I Areas 4/16/2015 10/11/2017, 82 FR 47122
225-0070 Requirements for Demonstrating Compliance with Air Quality Related Values Protection 3/1/2023 7/23/2024, 89 FR 59610
Division 226-General Emission Standards
226-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
226-0010 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Highest and Best Practicable Treatment and Control
226-0100 Policy and Application 3/1/2023 7/23/2024, 89 FR 59610
226-0110 Pollution Prevention 4/16/2015 10/11/2017, 82 FR 47122
226-0120 Operating and Maintenance Requirements 4/16/2015 10/11/2017, 82 FR 47122
226-0130 Typically Achievable Control Technology (TACT) 3/1/2023 7/23/2024, 89 FR 59610
226-0140 Additional Control Requirements for Stationary Sources of Air Contaminants 3/1/2023 7/23/2024, 89 FR 59610
Grain Loading Standards
226-0210 Particulate Emission Limitations for Sources Other Than Fuel Burning Equipment, Refuse Burning Equipment and Fugitive Emissions 3/1/2023 7/23/2024, 89 FR 59610
Particulate Emissions from Process Equipment
226-0310 Emission Standard 4/16/2015 10/11/2017, 82 FR 47122
226-0320 Determination of Process Weight 4/16/2015 10/11/2017, 82 FR 47122
Alternative Emission Controls
226-0400 Alternative Emission Controls (Bubble) 4/16/2015 10/11/2017, 82 FR 47122
226-0810 Particulate Matter Emissions Standards for Process Equipment 4/16/2015 10/11/2017, 82 FR 47122
Division 228-Requirements for Fuel Burning Equipment and Fuel Sulfur Content
228-0010 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
228-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
Sulfur Content of Fuels
228-0100 Residual Fuel Oils 4/16/2015 10/11/2017, 82 FR 47122
228-0110 Distillate Fuel Oils 4/16/2015 10/11/2017, 82 FR 47122
228-0120 Coal 4/16/2015 10/11/2017, 82 FR 47122
228-0130 Exemptions 4/16/2015 10/11/2017, 82 FR 47122
General Emission Standards for Fuel Burning Equipment
228-0200 Sulfur Dioxide Standards 4/16/2015 10/11/2017, 82 FR 47122
228-0210 General Emission Standards for Fuel Burning Equipment: Grain Loading Standards 3/1/2023 7/23/2024, 89 FR 59610
Division 232-Emission Standards for VOC Point Sources
232-0010 Introduction 4/16/2015 10/11/2017, 82 FR 47122
232-0020 Applicability 4/16/2015 10/11/2017, 82 FR 47122
232-0030 Definitions 3/1/2023 7/23/2024, 89 FR 59610
232-0040 General Non-Categorical Requirements 3/1/2023 7/23/2024, 89 FR 59610
232-0050 Exemptions 4/16/2015 10/11/2017, 82 FR 47122
232-0060 Compliance Determination 4/16/2015 10/11/2017, 82 FR 47122
232-0080 Bulk Gasoline Plants Including Transfer of Gasoline 4/16/2015 10/11/2017, 82 FR 47122
232-0085 Gasoline Delivery Vessel(s) 4/16/2015 10/11/2017, 82 FR 47122
232-0090 Bulk Gasoline Terminals Including Truck and Trailer Loading 3/1/2023 7/23/2024, 89 FR 59610
232-0100 Testing Vapor Transfer and Collection Systems 4/16/2015 10/11/2017, 82 FR 47122
232-0110 Loading Gasoline and Volatile Organic Liquids Onto Marine Tank Vessels 4/16/2015 10/11/2017, 82 FR 47122
232-0120 Cutback and Emulsified Asphalt 4/16/2015 10/11/2017, 82 FR 47122
232-0130 Petroleum Refineries 4/16/2015 10/11/2017, 82 FR 47122
232-0140 Petroleum Refinery Leaks 4/16/2015 10/11/2017, 82 FR 47122
232-0150 VOC Liquid Storage 4/16/2015 10/11/2017, 82 FR 47122
232-0160 Surface Coating in Manufacturing 3/1/2023 7/23/2024, 89 FR 59610
232-0170 Aerospace Component Coating Operations 3/1/2023 7/23/2024, 89 FR 59610
232-0180 Degreasers 4/16/2015 10/11/2017, 82 FR 47122
232-0190 Open Top Vapor Degreasers 4/16/2015 10/11/2017, 82 FR 47122
232-0200 Conveyorized Degreasers 4/16/2015 10/11/2017, 82 FR 47122
232-0210 Asphaltic and Coal Tar Pitch Used for Roofing Coating 4/16/2015 10/11/2017, 82 FR 47122
232-0220 Flat Wood Coating 4/16/2015 10/11/2017, 82 FR 47122
232-0230 Rotogravure and Flexographic Printing 4/16/2015 10/11/2017, 82 FR 47122
Division 234-Emission Standards for Wood Product Industries
234-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
234-0010 Definitions 3/1/2023 7/23/2024, 89 FR 59610 Except (8) and (10).
Wigwam Waste Burners
234-0100 Wigwam Waste Burners 4/16/2015 10/11/2017, 82 FR 47122
234-0140 Existing Administrative Agency Orders 4/16/2015 10/11/2017, 82 FR 47122
Kraft Pulp Mills
234-0200 Statement of Policy and Applicability 4/16/2015 10/11/2017, 82 FR 47122
234-0210 Emission Limitations 3/1/2023 7/23/2024, 89 FR 59610 Except references to total reduced sulfur.
234-0220 More Restrictive Emission Limits 4/16/2015 10/11/2017, 82 FR 47122 Except (2).
234-0240 Monitoring 4/16/2015 10/11/2017, 82 FR 47122 Except (1).
234-0250 Reporting 4/16/2015 10/11/2017, 82 FR 47122 Except (1) and (2).
234-0270 Chronic Upset Conditions 4/16/2015 10/11/2017, 82 FR 47122
Board Products Industries (Veneer, Plywood, Particleboard, Hardboard)
234-0500 Applicability and General Provisions 4/16/2015 10/11/2017, 82 FR 47122
234-0510 Veneer and Plywood Manufacturing Operations 4/16/2015 10/11/2017, 82 FR 47122
234-0520 Particleboard Manufacturing Operations 4/16/2015 10/11/2017, 82 FR 47122
234-0530 Hardboard Manufacturing Operations 4/16/2015 10/11/2017, 82 FR 47122
234-0540 Testing and Monitoring 4/16/2015 10/11/2017, 82 FR 47122
Division 236-Emission Standards for Specific Industries
236-0005 Applicability and Jurisdiction 4/16/2015 10/11/2017, 82 FR 47122
236-0010 Definitions 7/19/2019 6/9/2020, 85 FR 35198
Hot Mix Asphalt Plants
236-0400 Applicability 4/16/2015 10/11/2017, 82 FR 47122
236-0410 Control Facilities Required 4/16/2015 10/11/2017, 82 FR 47122
236-0420 Other Established Air Quality Limitations 4/16/2015 10/11/2017, 82 FR 47122
236-0440 Ancillary Sources of Emission-Housekeeping of Plant Facilities 4/16/2015 10/11/2017, 82 FR 47122
236-8010 Process Weight Table 3/1/2023 7/23/2024, 89 FR 59610
Division 240-Rules for Areas with Unique Air Quality Needs
240-0010 Purpose 4/16/2015 10/11/2017, 82 FR 47122
240-0020 Emission Limitations 4/16/2015 10/11/2017, 82 FR 47122
240-0030 Definitions 4/16/2015 10/11/2017, 82 FR 47122
240-0050 Compliance Testing Requirements 4/16/2015 10/11/2017, 82 FR 47122
The Medford-Ashland Air Quality Maintenance Area and the Grants Pass Urban Growth Area
240-0100 Applicability 4/16/2015 10/11/2017, 82 FR 47122
240-0110 Wood Waste Boilers 4/16/2015 10/11/2017, 82 FR 47122
240-0120 Veneer Dryer Emission Limitations 4/16/2015 10/11/2017, 82 FR 47122
240-0130 Air Conveying Systems (Medford-Ashland AQMA Only) 4/16/2015 10/11/2017, 82 FR 47122
240-0140 Wood Particle Dryers at Particleboard Plants 4/16/2015 10/11/2017, 82 FR 47122
240-0150 Hardboard Manufacturing Plants 4/16/2015 10/11/2017, 82 FR 47122
240-0160 Wigwam Waste Burners 4/16/2015 10/11/2017, 82 FR 47122
240-0180 Control of Fugitive Emissions (Medford-Ashland AQMA Only) 4/16/2015 10/11/2017, 82 FR 47122
240-0190 Requirement for Operation and Maintenance Plans (Medford-Ashland AQMA Only) 4/16/2015 10/11/2017, 82 FR 47122
240-0210 Continuous Monitoring 4/16/2015 10/11/2017, 82 FR 47122
240-0220 Source Testing 4/16/2015 10/11/2017, 82 FR 47122
240-0250 Open Burning 4/16/2015 10/11/2017, 82 FR 47122
La Grande Urban Growth Area
240-0300 Applicability 4/16/2015 10/11/2017, 82 FR 47122
240-0320 Wood-Waste Boilers 4/16/2015 10/11/2017, 82 FR 47122
240-0330 Wood Particle Dryers at Particleboard Plants 4/16/2015 10/11/2017, 82 FR 47122
240-0340 Hardboard Manufacturing Plants 4/16/2015 10/11/2017, 82 FR 47122
240-0350 Air Conveying Systems 4/16/2015 10/11/2017, 82 FR 47122
240-0360 Fugitive Emissions 4/16/2015 10/11/2017, 82 FR 47122
The Lakeview Urban Growth Area
240-0400 Applicability 4/16/2015 10/11/2017, 82 FR 47122
240-0410 Control of Fugitive Emissions 4/16/2015 10/11/2017, 82 FR 47122
240-0420 Requirement for Operation and Maintenance Plans 4/16/2015 10/11/2017, 82 FR 47122
240-0430 Source Testing 4/16/2015 10/11/2017, 82 FR 47122
240-0440 Open Burning 4/16/2015 10/11/2017, 82 FR 47122
Klamath Falls Nonattainment Area
240-0500 Applicability 12/11/2012 8/25/2015, 80 FR 51470
240-0510 Opacity Standard 4/16/2015 10/11/2017, 82 FR 47122
240-0520 Control of Fugitive Emissions 12/11/2012 8/25/2015, 80 FR 51470
240-0530 Requirement for Operation and Maintenance Plans 12/11/2012 8/25/2015, 80 FR 51470
240-0540 Compliance Schedule for Existing Industrial Sources 12/11/2012 8/25/2015, 80 FR 51470
240-0550 Requirements for New Sources When Using Residential Wood Fuel-Fired Device Offsets 4/16/2015 10/11/2017, 82 FR 47122
Real and Permanent PM 2.5 and PM 10 Offsets
240-0560 Real and Permanent PM2.5 and PM10 Offsets 4/16/2015 10/11/2017, 82 FR 47122
Klamath Falls Nonattainment Area Contingency Measures
240-0570 Applicability 12/11/2012 6/6/2016, 81 FR 36176
240-0580 Existing Industrial Sources Control Efficiency 12/11/2012 6/6/2016, 81 FR 36176
240-0610 Continuous Monitoring for Industrial Sources 4/16/2015 10/11/2017, 82 FR 47122
240-0620 Contingency Measures: New Industrial Sources 12/11/2012 6/6/2016, 81 FR 36176
240-0630 Contingency Enhanced Curtailment of Use of Solid Fuel Burning Devices and Fireplaces 12/11/2012 6/6/2016, 81 FR 36176
Division 242-Rules Applicable to the Portland Area
242-0010 What is the Employee Commute Options Program? 4/12/2007 12/19/2011, 76 FR 78571
242-0020 Who is Subject to ECO? 4/12/2007 12/19/2011, 76 FR 78571
242-0030 What Does ECO Require? 4/12/2007 12/19/2011, 76 FR 78571
242-0040 How Does the Department Enforce ECO? 4/12/2007 12/19/2011, 76 FR 78571
242-0050 Definitions of Terms Used in These Rules 4/12/2007 12/19/2011, 76 FR 78571
242-0060 Should All Employees at a Work Site be Counted? 10/14/1999 1/22/2003, 68 FR 2891
242-0070 What are the Major Requirements of ECO? 4/12/2007 12/19/2011, 76 FR 78571
242-0080 What are the Registration Requirements? 4/12/2007 12/19/2011, 76 FR 78571
242-0090 What are the Requirements for an Employee Survey? 4/12/2007 12/19/2011, 76 FR 78571
242-0100 Special Requirements for Employers Intending to Comply Without an Approved Plan 10/14/1999 1/22/2003, 68 FR 2891
242-0110 What if an Employer Does Not Meet the Target Auto Trip Rate? 4/12/2007 12/19/2011, 76 FR 78571
242-0120 How Will Employers Demonstrate Progress Toward the Target Auto Trip Rate? 4/12/2007 12/19/2011, 76 FR 78571
242-0130 What is the Schedule Employers Must Follow to Implement ECO? 10/14/1999 1/22/2003, 68 FR 2891
242-0140 How Should Employers Account for Changes in Work Force Size? 10/14/1999 1/22/2003, 68 FR 2891
242-0150 How Can an Employer Reduce Auto Commute Trips to a Work Site? 10/14/1999 1/22/2003, 68 FR 2891
242-0160 What Should be Included in an Auto Trip Reduction Plan? 4/12/2007 12/19/2011, 76 FR 78571
242-0170 When Will the Department Act on a Submitted Auto Trip Reduction Plan? 10/14/1999 1/22/2003, 68 FR 2891
242-0180 What is a Good Faith Effort? 4/12/2007 12/19/2011, 76 FR 78571
242-0190 How Does the ECO Program Affect New Employers, Expanding Employers and Employers Relocating Within the Portland AQMA? 4/12/2007 12/19/2011, 76 FR 78571
242-0200 Can a New or Relocating Employer Comply with ECO Through Restricted Parking Ratios? 4/12/2007 12/19/2011, 76 FR 78571
242-0210 Can an Existing Employer Comply with ECO Through Restricted Parking Ratios? 4/12/2007 12/19/2011, 76 FR 78571
242-0220 What if an Employer Has More Than One Work Site Within the Portland AQMA? 4/12/2007 12/19/2011, 76 FR 78571
242-0230 Can Employers Submit a Joint Plan? 10/14/1999 1/22/2003, 68 FR 2891
242-0240 Are There Alternatives to Trip Reduction? 4/12/2007 12/19/2011, 76 FR 78571
242-0250 What Alternatives Qualify as Equivalent Emission Reductions? 10/14/1999 1/22/2003, 68 FR 2891
242-0260 Can Employers Get Credit for Existing Trip Reduction Programs? 4/12/2007 12/19/2011, 76 FR 78571
242-0270 Are Exemptions Allowed if an Employer is Unable to Reduce Trips or Take Advantage of Alternate Compliance Options? 4/12/2007 12/19/2011, 76 FR 78571
242-0280 Participation in the Industrial Emission Management Program 4/12/2007 12/19/2011, 76 FR 78571
242-0290 What Kind of Records Must be Kept and for How Long? 4/12/2007 12/19/2011, 76 FR 78571
Voluntary Maximum Parking Ratio Program
242-0300 What is the Voluntary Parking Ratio Program? 10/14/1999 1/22/2003, 68 FR 2891
242-0310 Who can Participate in the Voluntary Parking Ratio Program? 10/14/1999 1/22/2003, 68 FR 2891
242-0320 Definitions of Terms and Land Uses 10/14/1999 1/22/2003, 68 FR 2891
242-0330 How Does a Property Owner Comply with the Voluntary Parking Ratio Program? 10/14/1999 1/22/2003, 68 FR 2891
242-0340 What are the Incentives for Complying with the Voluntary Parking Ratio Program? 10/14/1999 1/22/2003, 68 FR 2891
242-0350 Why Do I Need a Parking Ratio Permit? 10/14/1999 1/22/2003, 68 FR 2891
242-0360 What is Required to Obtain a Parking Ratio Permit? 10/14/1999 1/22/2003, 68 FR 2891
242-0370 How is the Parking Ratio Program Enforced? 10/14/1999 1/22/2003, 68 FR 2891
242-0380 When Will the Department Act on a Submitted Permit Application? 10/14/1999 1/22/2003, 68 FR 2891
242-0390 What are the Applicable Parking Ratios? 10/14/1999 1/22/2003, 68 FR 2891
Industrial Emission Management Program
242-0400 Applicability 4/16/2015 10/11/2017, 82 FR 47122
242-0410 Definition of Terms 4/16/2015 10/11/2017, 82 FR 47122
242-0420 Unused PSEL Donation Program 4/16/2015 10/11/2017, 82 FR 47122
242-0430 Industrial Growth Allowances 4/16/2015 10/11/2017, 82 FR 47122
242-0440 Industrial Growth Allowance Allocation 4/16/2015 10/11/2017, 82 FR 47122
Gasoline Vapors from Gasoline Transfer and Dispensing Operations
242-0500 Purpose and Applicability 4/16/2015 10/27/2015, 80 FR 65655
242-0510 Definitions 4/16/2015 10/27/2015, 80 FR 65655
242-0520 General Provisions 4/16/2015 10/27/2015, 80 FR 65655
Motor Vehicle Refinishing
242-0600 Applicability 4/16/2015 10/11/2017, 82 FR 47122
242-0610 Definitions 4/16/2015 10/11/2017, 82 FR 47122
242-0620 Requirements for Motor Vehicle Refinishing in Portland AQMA 4/16/2015 10/11/2017, 82 FR 47122
242-0630 Inspecting and Testing Requirements 4/16/2015 10/11/2017, 82 FR 47122
Division 244-Oregon Federal Hazardous Air Pollutant Program ? 2 ? 3
General Provisions for Stationary Sources
244-0030 Definitions 1/21/2021 8/11/2021, 86 FR 43954
Emission Standards for Gasoline Dispensing Facilities
244-0232 Purpose 4/16/2015 10/27/2015, 80 FR 65655
244-0234 Affected Sources 4/16/2015 10/27/2015, 80 FR 65655
244-0236 Affected Equipment or Processes 4/16/2015 10/27/2015, 80 FR 65655
244-0238 Compliance Dates 4/16/2015 10/27/2015, 80 FR 65655 Except (1)(a) and (2)(c).
Emission Limitations and Management Practices
244-0239 General Duties to Minimize Emissions 4/16/2015 10/27/2015, 80 FR 65655
244-0240 Work Practice and Submerged Fill Requirements 4/16/2015 10/27/2015, 80 FR 65655 Except (1)(b) and (c).
244-0242 Vapor Balance Requirements 4/16/2015 10/27/2015, 80 FR 65655 Including tables 2 and 3. Except (4)(c) and (d).
Testing and Monitoring Requirements
244-0244 Testing and Monitoring Requirements 4/16/2015 10/27/2015, 80 FR 65655
Notifications, Records, and Reports
244-0246 Notifications 4/16/2015 10/27/2015, 80 FR 65655
244-0248 Recordkeeping Requirements 4/16/2015 10/27/2015, 80 FR 65655
244-0250 Reporting Requirements 4/16/2015 10/27/2015, 80 FR 65655
244-0252 General Provision Applicability 12/31/2008 10/27/2015, 80 FR 65655
Division 250-General Conformity
250-0010 Purpose 10/14/1999 1/22/2003, 68 FR 2891
250-0020 Applicability 10/14/1999 1/22/2003, 68 FR 2891
250-0030 Definitions 10/16/2015 5/24/2018, 83 FR 24034
250-0040 Conformity Analysis 10/14/1999 1/22/2003, 68 FR 2891
250-0050 Reporting Requirements 10/14/1999 1/22/2003, 68 FR 2891
250-0060 Public Participation 10/14/1999 1/22/2003, 68 FR 2891
250-0070 Frequency of Conformity Determinations 10/14/1999 1/22/2003, 68 FR 2891
250-0080 Criteria for Determining Conformity of General Federal Actions 10/14/1999 1/22/2003, 68 FR 2891
250-0090 Procedures for Conformity Determinations of General Federal Actions 10/14/1999 1/22/2003, 68 FR 2891
250-0100 Mitigation of Air Quality Impacts 10/14/1999 1/22/2003, 68 FR 2891
Division 252-Transportation Conformity
252-0010 Propose 10/14/1999 1/22/2003, 68 FR 2891
252-0030 Definitions 3/5/2010 10/4/2012, 77 FR 60627
252-0060 Consultation 3/5/2010 10/4/2012, 77 FR 60627
252-0070 Timeframe of Conformity Determinations 3/5/2010 10/4/2012, 77 FR 60627 Except last two sentences.
252-0230 Written Comments 3/5/2010 10/4/2012, 77 FR 60627
Division 256-Motor Vehicles
256-0010 Definitions 11/19/2020 7/12/2022, 87 FR 41256
Visible Emissions
256-0100 Visible Emissions-General Requirements, Exclusions 7/12/2005 12/19/2011, 76 FR 78571
256-0130 Motor Vehicle Fleet Operation 11/19/2020 7/12/2022, 87 FR 41256
Certification of Pollution Control Systems
256-0200 County Designations 11/19/2020 7/12/2022, 87 FR 41256
Emission Control System Inspection
256-0300 Scope 11/19/2020 7/12/2022, 87 FR 41256
256-0310 Government-Owned Vehicle, Permanent Fleet Vehicle and United States Government Vehicle Testing 11/19/2020 7/12/2022, 87 FR 41256
256-0330 Department of Defense Personnel Participating in the Privately Owned Vehicle Import Control Program 10/14/1999 11/24/2004, 69 FR 67819
256-0340 Light Duty Motor Vehicle Emission Control Test Method for Enhanced Program 11/19/2020 7/12/2022, 87 FR 41256
256-0355 Emissions Control Test Method for OBD Test Program 11/19/2020 7/12/2022, 87 FR 41256
256-0356 Emissions Control Test Method for On-Site Vehicle Testing for Automobile Dealerships 11/19/2020 7/12/2022, 87 FR 41256
256-0370 Renewal of Registration for Light Duty Motor Vehicles and Heavy Duty Gasoline Motor Vehicles Temporarily Operating Outside of Oregon 11/19/2020 7/12/2022, 87 FR 41256
256-0380 Light Duty Motor Vehicle Emission Control Test Criteria for Basic Program 11/19/2020 7/12/2022, 87 FR 41256
256-0390 Heavy Duty Gasoline Motor Vehicle Emission Control Test Criteria 11/19/2020 7/12/2022, 87 FR 41256
256-0400 Light Duty Motor Vehicle Emission Control Standards for Basic Program 11/19/2020 7/12/2022, 87 FR 41256
256-0420 Heavy-Duty Gasoline Motor Vehicle Emission Control Standards 11/19/2020 7/12/2022, 87 FR 41256
256-0440 Criteria for Qualifications of Persons Eligible to Inspect Motor Vehicles and Motor Vehicle Pollution Control Systems and Execute Certificates 11/19/2020 7/12/2022, 87 FR 41256
256-0450 Gas Analytical System Licensing Criteria for Basic Program 11/19/2020 7/12/2022, 87 FR 41256
256-0465 Test Equipment Licensing Criteria for OBD Test Program 11/19/2020 7/12/2022, 87 FR 41256
256-0470 Agreement with Independent Contractor; Qualifications of Contractor; Agreement Provisions 11/19/2020 7/12/2022, 87 FR 41256
Division 258-Motor Vehicle Fuel Specifications
258-0010 Definitions 10/14/1999 1/22/2003, 68 FR 2891
Oxygenated Gasoline
258-0100 Policy 10/14/1999 1/22/2003, 68 FR 2891
258-0110 Purpose and General Requirements 10/14/1999 1/22/2003, 68 FR 2891
258-0120 Sampling and Testing for Oxygen Content 10/14/1999 1/22/2003, 68 FR 2891
258-0130 Compliance Options 10/14/1999 1/22/2003, 68 FR 2891
258-0140 Per Gallon Oxygen Content Standard 10/14/1999 1/22/2003, 69 FR 2891
258-0150 Average Oxygen Content Standard 10/14/1999 1/22/2003, 68 FR 2891
258-0160 Minimum Oxygen Content 10/14/1999 1/22/2003, 68 FR 2891
258-0170 Oxygenated Gasoline Blending 10/14/1999 1/22/2003, 68 FR 2891
258-0180 Registration 10/14/1999 1/22/2003, 68 FR 2891
258-0190 CAR, Distributor and Retail Outlet Operating Permits 10/14/1999 1/22/2003, 68 FR 2891
258-0200 Owners of Gasoline and Terminals, Distributors and Retail Outlets Required to Have Indirect Source Operating Permits 10/14/1999 1/22/2003, 68 FR 2891
258-0210 Recordkeeping 10/14/1999 1/22/2003, 68 FR 2891
258-0220 Reporting 10/14/1999 1/22/2003, 68 FR 2891
258-0230 Prohibited Activities 10/14/1999 1/22/2003, 68 FR 2891
258-0240 Inspection and Sampling 10/14/1999 1/22/2003, 68 FR 2891
258-0250 Liability for Violation of a Prohibited Activity 10/14/1999 1/22/2003, 68 FR 2891
258-0260 Defenses for Prohibited Activities 10/14/1999 1/22/2003, 68 FR 2891
258-0270 Inability to Produce Conforming Gasoline Due to Extraordinary Circumstances 10/14/1999 1/22/2003, 68 FR 2891
258-0280 Quality Assurance Program 10/14/1999 1/22/2003, 68 FR 2891
258-0290 Attest Engagements Guidelines When Prohibited Activities Alleged 10/14/1999 1/22/2003, 68 FR 2891
258-0300 Dispenser Labeling 10/14/1999 1/22/2003, 68 FR 2891
258-0310 Contingency Provision for Carbon Monoxide Nonattainment Areas 10/14/1999 1/22/2003, 68 FR 2891
Standard for Automotive Gasoline
258-0400 Reid Vapor Pressure for Gasoline 10/14/1999 1/22/2003, 68 FR 2891
Division 262-Heat Smart Program for Residential Woodstoves and Other Solid Fuel Heating Devices
262-0400 Purpose and Applicability of Rules 3/15/2011 6/20/2013, 78 FR 37124
262-0450 Definitions 4/16/2015 10/11/2017, 82 FR 47122
262-0500 Certification of Solid Fuel Burning Devices for Sale and New 3/15/2011 6/20/2013, 78 FR 37124
262-0600 New and Used Solid Fuel Burning Devices 5/17/2012 6/20/2013, 78 FR 37124
262-0700 Removal and Destruction of Used Solid Fuel Burning Devices 3/15/2011 6/20/2013, 78 FR 37124
262-0800 Wood Burning and Other Heating Devices Curtailment Program 3/15/2011 6/20/2013, 78 FR 37124
262-0900 Materials Prohibited from Burning 3/15/2011 6/20/2013, 78 FR 37124
262-1000 Wood Burning Contingency Measures for PM 2.5 Nonattainment Areas 12/11/2012 6/6/2016, 81 FR 36176
Division 264-Rules for Open Burning
264-0010 How to Use These Open Burning Rules 4/16/2015 10/11/2017, 82 FR 47122
264-0020 Policy 4/16/2015 10/11/2017, 82 FR 47122
264-0030 Definitions 4/16/2015 10/11/2017, 82 FR 47122
264-0040 Exemptions, Statewide 4/16/2015 10/11/2017, 82 FR 47122
264-0050 General Requirements Statewide 4/16/2015 10/11/2017, 82 FR 47122
264-0060 General Prohibitions Statewide 4/16/2015 10/11/2017, 82 FR 47122
264-0070 Open Burning Conditions 4/16/2015 10/11/2017, 82 FR 47122
264-0075 Delegation of Authority 4/16/2015 10/11/2017, 82 FR 47122
264-0078 Open Burning Control Areas 4/16/2015 10/11/2017, 82 FR 47122
264-0080 County Listing of Specific Open Burning Rules 4/16/2015 10/11/2017, 82 FR 47122
Open Burning Requirements
264-0100 Baker, Clatsop, Crook, Curry, Deschutes, Gilliam, Grant, Harney, Hood River, Jefferson, Klamath, Lake, Lincoln, Malheur, Morrow, Sherman, Tillamook, Umatilla, Union, Wallowa, Wasco and Wheeler Counties 4/16/2015 10/11/2017, 82 FR 47122
264-0110 Benton, Linn, Marion, Polk, and Yamhill Counties 4/16/2015 10/11/2017, 82 FR 47122
264-0120 Clackamas County 4/16/2015 10/11/2017, 82 FR 47122
264-0130 Multnomah County 4/16/2015 10/11/2017, 82 FR 47122
264-0140 Washington County 4/16/2015 10/11/2017, 82 FR 47122
264-0150 Columbia County 4/16/2015 10/11/2017, 82 FR 47122
264-0160 Lane County 4/16/2015 10/11/2017, 82 FR 47122
264-0170 Coos, Douglas, Jackson and Josephine Counties 4/16/2015 10/11/2017, 82 FR 47122
264-0175 Klamath County 4/16/2015 10/11/2017, 82 FR 47122
264-0180 Letter Permits 4/16/2015 10/11/2017, 82 FR 47122
Division 266-Field Burning Rules (Willamette Valley)
266-0010 Introduction 10/14/1999 1/22/2003, 68 FR 2891
266-0020 Policy 10/14/1999 1/22/2003, 68 FR 2891
266-0030 Definitions 10/14/1999 1/22/2003, 68 FR 2891
266-0040 General Requirements 10/14/1999 1/22/2003, 68 FR 2891
266-0050 Registration, Permits, Fees, Records 10/14/1999 1/22/2003, 68 FR 2891
266-0060 Acreage Limitations, Allocations 10/14/1999 1/22/2003, 68 FR 2891
266-0070 Daily Burning Authorization Criteria 10/14/1999 1/22/2003, 68 FR 2891
266-0080 Burning by Public Agencies (Training Fires) 10/14/1999 1/22/2003, 68 FR 2891
266-0090 Preparatory Burning 10/14/1999 1/22/2003, 68 FR 2891
266-0100 Experimental Burning 10/14/1999 1/22/2003, 68 FR 2891
266-0110 Emergency Burning Cessation 10/14/1999 1/22/2003, 68 FR 2891
266-0120 Propane Flaming 10/14/1999 1/22/2003, 68 FR 2891
266-0130 Stack Burning 10/14/1999 1/22/2003, 68 FR 2891
Division 268-Emission Reduction Credits
268-0010 Applicability 4/16/2015 10/11/2017, 82 FR 47122
268-0020 Definitions 4/16/2015 10/11/2017, 82 FR 47122
268-0030 Emission Reduction Credits 4/16/2015 10/11/2017, 82 FR 47122
Chapter 629-Oregon Department of Forestry
629-24-301 Maintenance of Productivity and Related Values 8/1/1987 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
629-048-0001 Title, Scope and Effective Dates 3/1/2019 5/25/2021, 86 FR 27976
629-048-0005 Definitions 3/1/2019 5/25/2021, 86 FR 27976
629-048-0010 Purpose 3/1/2019 5/25/2021, 86 FR 27976
629-048-0020 Necessity of Prescribed Burning 3/1/2019 5/25/2021, 86 FR 27976
629-048-0021 Necessity of Safeguarding Public Health 3/1/2019 5/25/2021, 86 FR 27976
629-048-0100 Regulated Areas 1/1/2008 8/22/2012, 77 FR 50611
629-048-0110 Characterization and Response to Smoke Incidents, Smoke Intrusions, and National Ambient Air Quality Standards (NAAQS) Exceedances 3/1/2019 5/25/2021, 86 FR 27976
629-048-0120 Air Quality Maintenance Objectives 3/1/2019 5/25/2021, 86 FR 27976
629-048-0130 Visibility Objectives 7/11/2014 5/25/2021, 86 FR 27976
629-048-0135 Special Protection Zone Requirements 3/1/2019 5/25/2021, 86 FR 27976
629-048-0137 SPZ Contingency Plan Requirements 3/1/2019 5/25/2021, 86 FR 27976
629-048-0140 Smoke Sensitive Receptor Areas 3/1/2019 5/25/2021, 86 FR 27976
629-048-0150 Criteria for Future Listing of Smoke Sensitive Receptor Areas 3/1/2019 5/25/2021, 86 FR 27976
629-048-0160 Bear Creek/Rogue River Valley SSRA 1/1/2008 8/22/2012, 77 FR 50611
629-048-0180 Communication, Community Response Plans, and Exemption Requests 3/1/2019 5/25/2021, 86 FR 27976
629-048-0200 Regulated Areas 3/1/2019 5/25/2021, 86 FR 27976
629-048-0210 Best Burn Practices; Emission Reduction Techniques 3/1/2019 5/25/2021, 86 FR 27976
629-048-0220 Forecast Procedures 3/1/2019 5/25/2021, 86 FR 27976
629-048-0230 Burn Procedures 3/1/2019 5/25/2021, 86 FR 27976
629-048-0300 Registration of Intent to Burn 1/1/2008 8/22/2012, 77 FR 50611
629-048-0310 Fees for Prescribed Burning 3/1/2019 5/25/2021, 86 FR 27976
629-048-0320 Reporting of Accomplishments 3/1/2019 5/25/2021, 86 FR 27976
629-048-0330 Emission Inventories 1/1/2008 8/22/2012, 77 FR 50611
629-048-0400 Coordination with Other Regulating Jurisdictions and for Other Pollutants 1/1/2008 8/22/2012, 77 FR 50611
629-048-0450 Periodic Evaluation and Adaptive Management 3/1/2019 5/25/2021, 86 FR 27976
629-048-0500 Enforcement 3/1/2019 5/25/2021, 86 FR 27976
Department of State Police
Chapter 837-Office of State Fire Marshall
Division 110-Field Burning and Propaning Rules
837-110-0010 Field Preparation 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0020 Firefighting Water Supplies 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0030 Firefighting Equipment 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0040 Ignition Criteria 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0050 Prohibited Use 2/7/1989 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0060 Communication 2/7/1989 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0070 Fire Safety Watch 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0080 Fire Safety Buffer Zones 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0090 Ban on Burning 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
Propaning
837-110-0110 Field Preparation 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0120 Firefighting Water Supplies 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0130 Firefighting Equipment 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0140 Communication 2/7/1989 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0150 Fire Safety Watch 2/7/1994 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
837-110-0160 Ban on Burning 8/11/1993 11/1/2001, 66 FR 55105 Statewide Visibility Plan.
1 ?The EPA approves the requirements in Table 2 of this paragraph (c) only to the extent they apply to (1) pollutants for which NAAQS have been established (criteria pollutants) and precursors to those criteria pollutants as determined by the EPA for the applicable geographic area; and (2) any additional pollutants that are required to be regulated under Part C of Title I of the CAA, but only for the purposes of meeting or avoiding the requirements of Part C of Title I of the CAA.
2 ?Only for the Portland-Vancouver, Medford-Ashland, and Salem-Keizer Area Transportation Study air quality management areas, as well as all of Clackamas, Multnomah, and Washington counties.
3 ?The EPA approves Division 244 only to the extent needed to implement the requirements for gasoline dispensing facilities that are approved into the SIP for the purpose of regulating VOC emissions.


page 38028page 38029


[top] 
Agency and ordinance Title or subject Date EPA approval date Explanations
City of Grants Pass Ordinance No. 4671 Bans Open Burning 7/23/1990 (city approved) 12/17/1993, 58 FR 65934 Grants Pass PM-10 Attainment Plan.
City of Eugene Ordinance No. 19731 An Ordinance Restricting the Use of Solid Fuel Space Heating Devices During Air Pollution Episodes 11/5/1990 (city approved) 8/24/1994, 59 FR 43483 Eugene-Springfield PM-10 Attainment Plan.
Lane County Ordinance No. 9-90 (Alternative 2) Restricts Use of Solid Fuel Space Heating Devices During Air Pollution Episodes 12/19/1990 (county enacted) 8/24/1994, 59 FR 43483 Eugene-Springfield PM-10 Attainment Plan.
City of Springfield Ordinance No. 5546 Restricts Use of Solid Fuel Space Heating Devices During Air Pollution Episodes 12/17/1990 (city approved) 8/24/1994, 59 FR 43483 Eugene-Springfield PM-10 Attainment Plan.
Union County Ordinance 1991-6 Field Burning Smoke Management Program 6/5/1991 (county passed) 2/15/1995, 60 FR 8563 La Grande PM-10 Attainment Plan.
City of Klamath Falls Ordinance 6630 An Ordinance Consenting to the Application of the Klamath County Air Quality Program Ordinance Within City Limits 9/16/1991 (city approval) 4/14/1997, 62 FR 18047 Klamath Falls PM-10 Attainment Plan.
City of Oakridge Ordinance 815 Restricts Use of Solid Fuel Space Heating Devices During Air Pollution Episodes 8/15/1996 (city approved) 3/15/1999, 64 FR 12751 Oakridge PM-10 Attainment Plan.
Town of Lakeview Resolution No. 402 Establishes a Lakeview Air Quality Improvement Program 2/28/1994 (town passed) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Lake County Commissioners Resolution Establishment of a Lakeview Urban Growth Boundary Air Quality Improvement Program 3/15/1995 (county passed) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Town of Lakeview Ordinance No. 748 Prohibits Use of Solid Fuel Burning Devices, Provides Certain Exemptions and Establishes Enforcement Controls 2/28/1995 (town adopted) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Town of Lakeview Ordinance No. 749 Prohibits Waste Burning; Restricts Open Burning, Repeals Ordinance No. 581 2/28/1995 (town adopted) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Lake County Ordinance No. 29 Prohibits Use of Solid Fuel Burning Devices, Provides Certain Exemptions and Establishes Enforcement Controls 3/15/1995 (county adopted) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Lake County Ordinance No. 30 Prohibits Waste Burning and Restricts Open Burning 3/15/1995 (county adopted) 9/21/1999, 64 FR 51051 Lakeview PM-10 Attainment Plan.
Medford Ordinance No. 6484 Woodstove Curtailment 11/03/1989 (city approved) 7/24/2002, 67 FR 48388 Medford Carbon Monoxide (CO) Maintenance Plan.
Union County Ordinance No. 1992-4 Management and Control of Field Burning 7/1/1992 (county effective) 11/01/2001, 66 FR 55105 Statewide Visibility Plan.
Jefferson County Ordinance No. 0-58-89 Management and Control of Field Burning 5/31/1989 (county passed) 11/01/2001, 66 FR 55105 Statewide Visibility Plan.
Codified Ordinances of Jackson County 1810.01 Definitions 5/2/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.02 Exceptions to chapter 8/22/2001 (county passed 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.03 Requirements for solid fuel heating device installation 12/20/1989 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.04 Solid fuel burning device omission standard 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.05 Restriction of woodburning and emissions on high pollution days 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.06 Trackout 12/04/1985 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.07 Open burning 8/22/2001 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County 1810.08 Burning of material emitting dense smoke or noxious odors in solid fuel burning devices 12/20/1989 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County Exhibit A [Map 1] 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County Exhibit B Proposed Curtailment Boundary Jackson County 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County Exhibit C [Map 2] 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Codified Ordinances of Jackson County Exhibit D Boundary Description Medford-Ashland Air Quality Maintenance Area 5/02/1990 (county passed) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 5.550 Outside Burning 3/16/2000 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 7.220 Definitions 9/17/1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 7.222 Operation of Solid Fuel Burning Device Prohibition 9/17/1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 7.224 Exemptions 9/17/1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 7.240 Installation of Solid-Fuel Heating Devices 8/02/1990 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Code of the City of Medford, Oregon: 7.242 Prohibited Materials 9/17/1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.010 Definitions 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.012 Requirements for solid fuel burning device installation 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.014 Solid fuel burning device emission standard 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.020 Operation of solid fuel device prohibition 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.030 Exemptions 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.01.032 Prohibited materials 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.04.040 H Penalty and abatement 1979 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Central Point Municipal Code: 8.04.095 Trackout prohibited 1994 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 10.30.005 Definitions 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 10.30.010 Outdoor and Indoor Burning Restricted 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 10.30.020 Period When Outdoor Burning is Authorized 2000 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 10.30.030 Requirements for Permitted Fires 1993 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 10.30.040 Permits Required 1993 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 9.24.010 Definitions 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 9.24.020 Requirements for Solid Fuel Heating Device Installation 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 9.24.030 Solid Fuel Burning Device Emission Standard 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 9.24.040 Restriction of Woodburning an Emissions on High Pollution Days 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Ashland Municipal Code: 9.24.050 Prohibited Materials 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Talent Ordinance #565 An ordinance of the city of Talent adopting a uniform fire code 8/20/1992 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Talent Ordinance #98-635-0 An ordinance regulating the use of solid fuel burning devices within the city of Talent, Oregon 3/04/1998 (city approved) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.16.050 Burn days 1982 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.16.090 Prohibited materials 1982 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.20.010 Definitions 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.20.020 Requirements for solid fuel heating device installation 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.20.030 Solid fuel burning device emission standard 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.20.040 Restriction of woodburning and emissions on high pollution days 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Phoenix Code: 8.20.050 Prohibited materials 1998 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Jacksonville code: Ordinance 375 An ordinance amending chapter 8.08.100 of the Jacksonville Municipal Code 4/21/1992 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Jacksonville Code Chapter 8.10 Woodheating February 1992 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Eagle Point Code: 8.08.160 Outside burning of refuse or rubbish 2000 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Eagle Point Code: 8.08.170 Open burning restricted 1990 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Eagle Point Code: 8.08.180 Purposes for open burning permit 1990 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Eagle Point Code: 8.08.190 Times when open burning fire allowed 1990 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
City of Eagle Point Code: 8.08.200 Public nuisance 1990 (city effective) 6/19/2006, 71 FR 35163 Medford-Ashland PM-10 Attainment Plan.
Klamath County Ordinance 63.06 Chapter 406-Klamath County Clean Air Ordinance 63.06 12/31/2012 (county effective) 08/25/2015, 80 FR 51470 Except 406.300 and 406.400 Klamath Falls PM 2.5 Attainment Plan.
City of Oakridge Ordinance No. 920 An Ordinance Amending Section 7 of Ordinance 914 and Adopting New Standards for the Oakridge Air Pollution Control Program 10/20/2016 (county approved) 8/22/2022, 87 FR 51262 Except section 6.
Lane County Code Chapter 9 Restriction on Use of Solid Fuel Space Heating Devices 2/9/2017 (county approved) 8/22/2022, 87 FR 51262 Except sections 9.145 and 9.150.


page 38030page 38031page 38032page 38033page 38034


[top] 
LRAPA citation Title/subject State effective date EPA approval date Explanations
Title 11-Policy and General Provisions
11-005 Policy 10/9/1979 9/9/1993, 58 FR 47385
11-010 Construction and Validity 10/9/1979 9/9/1993, 58 FR 47385
Title 12-Definitions
12-001 General 3/23/2018 10/5/2018, 83 FR 50274
12-005 Definitions 5/17/2019 10/31/2019, 84 FR 59327
12-010 Abbreviations and Acronyms 3/23/2018 10/5/2018, 83 FR 50274
12-020 Exceptions 5/17/2019 10/31/2019, 84 FR 59327
12-025 Reference Materials 5/17/2019 10/31/2019, 84 FR 58327
Title 16-Home Wood Heating Curtailment Program Enforcement
16-001 Purpose 7/13/1993 8/24/1994, 59 FR 43483
16-010 Definitions 7/13/1993 8/24/1994, 59 FR 43483
16-100 Civil Penalty Schedule 7/13/1993 8/24/1994, 59 FR 43483
16-110 Classification of Violations 7/13/1993 8/24/1994, 59 FR 43483
16-120 Notice of Violation 7/13/1993 8/24/1994, 59 FR 43483
16-130 Appeal of Civil Penalty 7/13/1993 8/24/1994, 59 FR 43483
16-140 Conducting Contested Case Evidentiary Hearings 7/13/1993 8/24/1994, 59 FR 43483
16-150 Evidentiary Rules 7/13/1993 8/24/1994, 59 FR 43483
16-160 Final Orders 7/13/1993 8/24/1994, 59 FR 43483
16-170 Default Orders 7/13/1993 8/24/1994, 59 FR 43483
Title 29-Designation of Air Quality Areas
29-0010 Definitions 11/18/2021 8/22/2022, 87 FR 51262
29-0020 Designation of Air Quality Control Regions 11/18/2021 8/22/2022, 87 FR 51262
29-0030 Designation of Nonattainment Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0040 Designation of Maintenance Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0050 Designation of Prevention of Significant Deterioration Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0060 Redesignation of Prevention of Significant Deterioration Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0070 Special Control Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0080 Motor Vehicle Inspection Boundary Designations 11/18/2021 8/22/2022, 87 FR 51262
29-0090 Oxygenated Gasoline Control Areas 11/18/2021 8/22/2022, 87 FR 51262
Designation of Areas
29-0300 Designation of Sustainment Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0310 Designation of Reattainment Areas 11/18/2021 8/22/2022, 87 FR 51262
29-0320 Priority Sources 11/18/2021 8/22/2022, 87 FR 51262
Title 30-Incinerator Regulations
30-010 Definitions 3/23/2018 10/5/2018, 83 FR 50274
30-015 Best Available Control Technology for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274
30-020 Emission Limitations for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274 Except (2) and (8).
30-025 Design and Operation for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274 Except (9).
30-030 Continuous Emission Monitoring for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274 Except (1)(I) and (2)(E).
30-035 Reporting and Testing for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274
30-040 Compliance for Solid and Infectious Waste Incinerators 3/31/2014 10/5/2018, 83 FR 50274
30-045 Emission Limitations of Crematory Incinerators 3/31/2014 10/5/2018, 83 FR 50274 Except (3).
30-050 Design and Operation of Crematory Incinerators 3/31/2014 10/5/2018, 83 FR 50274
30-055 Monitoring and Reporting for Crematory Incinerators 3/31/2014 10/5/2018, 83 FR 50274
30-060 Compliance of Crematory Incinerators 3/31/2014 10/5/2018, 83 FR 50274
Title 31-Public Participation
31-0010 Purpose 3/23/2018 10/5/2018, 83 FR 50274
31-0020 Applicability 5/17/2019 10/31/2019, 84 FR 58327
31-0030 Public Notice Categories and Timing 5/17/2019 10/31/2019, 84 FR 58327
31-0040 Public Notice Information 5/17/2019 10/31/2019, 84 FR 58327
31-0050 Public Notice Procedures 5/17/2019 10/31/2019, 84 FR 58327
31-0060 Persons Required to be Notified 3/23/2018 10/5/2018, 83 FR 50274
31-0080 Issuance or Denial of Permit 3/23/2018 10/5/2018, 83 FR 50274
Title 32-Emission Standards
32-001 Definitions 3/23/2018 10/5/2018, 83 FR 50274
32-005 Highest and Best Practicable Treatment and Control Required 3/23/2018 10/5/2018, 83 FR 50274
32-006 Pollution Prevention 3/23/2018 10/5/2018, 83 FR 50274
32-007 Operating and Maintenance Requirements 3/23/2018 10/5/2018, 83 FR 50274
32-008 Typically-Achievable Control Technology Requirements 3/23/2018 10/5/2018, 83 FR 50274
32-009 Additional Control Requirements for Stationary Sources of Air Contaminants 3/23/2018 10/5/2018, 83 FR 50274
32-010 Visible Air Contaminant Limitations 3/23/2018 10/5/2018, 83 FR 50274
32-015 Particulate Matter Emission Limitations for Sources Other than Fuel Burning Equipment, Refuse Burning Equipment, and Fugitive Emissions 3/23/2018 10/5/2018, 83 FR 50274
32-020 Particulate Matter Weight Standards-Existing Combustion Sources 3/23/2018 10/5/2018, 83 FR 50274
32-030 Particulate Matter Weight Standards-New Combustion Sources 3/23/2018 10/5/2018, 83 FR 50274
32-045 Process Weight Emission Limitations and Determination of Process Weight 3/23/2018 10/5/2018, 83 FR 50274
32-050 Concealment and Masking of Emissions 3/23/2018 10/5/2018, 83 FR 50274
32-060 Air Conveying Systems 3/23/2018 10/5/2018, 83 FR 50274
Gaseous Emission Limitations
32-065 Sulfur Content of Fuels 3/23/2018 10/5/2018, 83 FR 50274
32-070 Sulfur Dioxide Emission Limitations 3/23/2018 10/5/2018, 83 FR 50274
32-090 Other Emissions 3/31/2014 10/5/2018, 83 FR 50274
32-100 Alternative Emission Controls (Bubble) 3/23/2018 10/5/2018, 83 FR 50274
32-8010 Particulate Matter Emissions Standards for Process Equipment 3/23/2018 10/5/2018, 83 FR 50274
Title 33-Prohibited Practices and Control of Special Classes of Industry
33-005 Definitions 3/23/2018 10/5/2018, 83 FR 50274
33-060 Board Products Industries (Hardboard, Particleboard, Plywood, Veneer) 3/23/2018 10/5/2018, 83 FR 50274
33-065 Charcoal Producing Plants 3/23/2018 10/5/2018, 83 FR 50274
33-070 Kraft Pulp Mills 3/23/2018 10/5/2018, 83 FR 50274 Except in (1) the definitions of "non-condensables", "other sources", and "TRS", (3)(a), (4)(b) (5)(b), (6)(a), and (6)(b).
33-500 Particulate Matter Emissions Standards for Process Equipment 3/23/2018 10/5/2018, 83 FR 50274
Title 34-Stationary Source Notification Requirements
34-005 Definitions 3/23/2018 10/5/2018, 83 FR 50274
34-010 Applicability 3/23/2018 10/5/2018, 83 FR 50274
34-015 Request for Information 3/23/2018 10/5/2018, 83 FR 50274
34-016 Records: Maintaining and Reporting 3/23/2018 10/5/2018, 83 FR 50274
34-017 Enforcement; Credible Evidence 3/23/2018 10/5/2018, 83 FR 50274
34-020 Information Exempt from Disclosure 3/23/2018 10/5/2018, 83 FR 50274
Registration
34-025 Registration is General 3/23/2018 10/5/2018, 83 FR 50274
34-030 Source Registration Requirements and Re-Registration and Maintaining Registration 3/23/2018 10/5/2018, 83 FR 50274
Notice of Construction and Approval of Plans
34-034 Requirements for Construction 3/23/2018 10/5/2018, 83 FR 50274
34-035 Types of Construction/Modification Changes 3/23/2018 10/5/2018, 83 FR 50274
34-036 Notice to Construct 3/23/2018 10/5/2018, 83 FR 50274
34-037 Construction Approval 3/23/2018 10/5/2018, 83 FR 50274
34-038 Approval to Operate 3/23/2018 10/5/2018, 83 FR 50274
Title 35-Stationary Source Testing and Monitoring
35-0010 Definitions 3/23/2018 10/5/2018, 83 FR 50274
Sampling, Testing and Measurement
35-0110 Applicability 3/23/2018 10/5/2018, 83 FR 50274
35-0120 Program 3/23/2018 10/5/2018, 83 FR 50274
35-0130 Stack Heights and Dispersion Techniques 3/23/2018 10/5/2018, 83 FR 50274
35-0140 Methods 3/23/2018 10/5/2018, 83 FR 50274
35-0150 LRAPA Testing 3/31/2014 10/5/2018, 83 FR 50274
Title 37-Air Contaminant Discharge Permits
37-0010 Purpose 5/17/2019 10/31/2019, 84 FR 58327
37-0020 Applicability and Jurisdiction 5/17/2019 10/31/2019, 84 FR 58327
37-0025 Types of Permits 5/17/2019 10/31/2019, 84 FR 58327
37-0030 Definitions 5/17/2019 10/31/2019, 84 FR 58327
37-0040 Application Requirements 5/17/2019 10/31/2019, 84 FR 58327
37-0052 Construction ACDP 3/23/2018 10/5/2018, 83 FR 50274
37-0054 Short Term Activity ACDPs 3/23/2018 10/5/2018, 83 FR 50274
37-0056 Basic ACDPs 3/23/2018 10/5/2018, 83 FR 50274
37-0060 General Air Contaminant Discharge Permits 3/23/2018 10/5/2018, 83 FR 50274
37-0062 General ACDP Attachments 3/23/2018 10/5/2018, 83 FR 50274
37-0064 Simple ACDPs 3/23/2018 10/5/2018, 83 FR 50274
37-0066 Standard ACDPs 3/23/2018 10/5/2018, 83 FR 50274
37-0068 Simple and Standard ACDP Attachments 3/23/2018 10/5/2018, 83 FR 50274
37-0070 Permitting a Source with Multiple Activities or Processes at a Single Adjacent or Contiguous Site 3/23/2018 10/5/2018, 83 FR 50274
37-0082 Termination or Revocation of an ACDP 3/23/2018 10/5/2018, 83 FR 50274
37-0084 LRAPA-Initiated Modification 3/23/2018 10/5/2018, 83 FR 50274
37-0090 Sources Subject to ACDPs and Fees 5/17/2019 10/31/2019, 84 FR 58327
37-0094 Temporary Closure 3/23/2018 10/5/2018, 83 FR 50274
37-8010 Table 1-Activities and Sources 3/23/2018 10/5/2018, 83 FR 50274
37-8020 Table 2-Air Contaminant Discharge Permits 5/17/2019 10/31/2019, 84 FR 58327
Title 38-New Source Review
38-0010 Applicability and General Prohibitions, General Requirements and Jurisdiction 3/23/2018 10/5/2018, 83 FR 50274
38-0020 Definitions 3/23/2018 10/5/2018, 83 FR 50274
38-0025 Major Modification 3/23/2018 10/5/2018, 83 FR 50274
38-0030 New Source Review Procedural Requirements 3/23/2018 10/5/2018, 83 FR 50274
38-0034 Exemptions 3/23/2018 10/5/2018, 83 FR 50274
38-0038 Fugitive and Secondary Emissions 3/23/2018 10/5/2018, 83 FR 50274
38-0040 Review of Sources Subject to Major NSR or Type A State NSR for Compliance With Regulations 3/23/2018 10/5/2018, 83 FR 50274
Major New Source Review
38-0045 Requirements for Sources in Sustainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0050 Requirements for Sources in Nonattainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0055 Requirements for Sources in Reattainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0060 Records; Maintaining and Reporting 3/23/2018 10/5/2018, 83 FR 50274
38-0070 Prevention of Significant Deterioration Requirements for Sources in Attainment or Unclassified Areas 3/23/2018 10/5/2018, 83 FR 50274
State New Source Review
38-0245 Requirements for Sources in Sustainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0250 Requirements for Sources in Nonattainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0255 Requirements for Sources in Reattainment Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0260 Requirements for Sources in Maintenance Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0270 Requirement for Sources in Attainment and Unclassified Areas 3/23/2018 10/5/2018, 83 FR 50274
Net Air Quality Benefit Emission Offsets
38-0500 Net Air Quality Benefit for Sources Locating Within or Impacting Designated Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0510 Common Offset Requirements 3/23/2018 10/5/2018, 83 FR 50274 Except (3).
38-0530 Requirements for Demonstrating Net Air Quality Benefit for Non-Ozone Areas 3/23/2018 10/5/2018, 83 FR 50274
38-0540 Sources in a Designated Area Impacting Other Designated Areas 3/23/2018 10/5/2018, 83 FR 50274
Title 39-Contingency for PM 10 Sources in Eugene-Springfield Non-Attainment Area
39-001 Purpose 11/13/1991 8/24/1994, 59 FR 43483
39-005 Relation to Other Rules 11/13/1991 8/24/1994, 59 FR 43483
39-010 Applicability 11/13/1991 8/24/1994, 59 FR 43483
39-015 Definitions 11/13/1991 8/24/1994, 59 FR 43483
39-020 Compliance Schedule for Existing Sources 11/13/1991 8/24/1994, 59 FR 43483
39-025 Wood-Waste Boilers 11/13/1991 8/24/1994, 59 FR 43483
39-030 Veneer Dryers 11/13/1991 8/24/1994, 59 FR 43483
39-035 Particle Board Plants and Wood Particle Dryers 11/13/1991 8/24/1994, 59 FR 43483
39-040 Kraft Pulp Mills 11/13/1991 8/24/1994, 59 FR 43483
39-050 Air Conveying Systems 11/13/1991 8/24/1994, 59 FR 43483
39-055 Fugitive Dust 11/13/1991 8/24/1994, 59 FR 43483
39-060 Open Burning 11/13/1991 8/24/1994, 59 FR 43483
Title 40-Air Quality Analysis Requirements
40-0010 Purpose 3/23/2018 10/5/2018, 83 FR 50274
40-0020 Definitions 3/23/2018 10/5/2018, 83 FR 50274
40-0030 Procedural Requirements 3/23/2018 10/5/2018, 83 FR 50274
40-0040 Air Quality Models 3/23/2018 10/5/2018, 83 FR 50274
40-0045 Requirements for Analysis in Maintenance Areas 3/23/2018 10/5/2018, 83 FR 50274
40-0050 Requirements for Analysis in PSD Class II and Class III Areas 3/23/2018 10/5/2018, 83 FR 50274
40-0060 Requirements for Demonstrating Compliance with Standards and Increments in PSD Class I Areas 3/23/2018 10/5/2018, 83 FR 50274
40-0070 Requirements for Demonstrating Compliance with Air Quality Related Values Protection 3/23/2018 10/5/2018, 83 FR 50274
Title 41-Emission Reduction Credits
41-0010 Applicability 3/31/2014 10/5/2018, 83 FR 50274
41-0020 Definitions 3/23/2018 10/5/2018, 83 FR 50274
41-0030 Emission Reduction Credits 3/23/2018 10/5/2018, 83 FR 50274
Title 42-Stationary Source Plant Site Emission Limits
42-0010 Policy 3/23/2018 10/5/2018, 83 FR 50274
42-0020 Applicability 3/23/2018 10/5/2018, 83 FR 50274
42-0030 Definitions 3/23/2018 10/5/2018, 83 FR 50274
Criteria for Establishing Plant Site Emission Limits
42-0035 General Requirements for Establishing All PSELs 3/23/2018 10/5/2018, 83 FR 50274
42-0040 Generic Annual PSEL 3/23/2018 10/5/2018, 83 FR 50274
42-0041 Source Specific Annual PSEL 3/23/2018 10/5/2018, 83 FR 50274
42-0042 Short Term PSEL 3/23/2018 10/5/2018, 83 FR 50274
42-0046 Netting Basis 3/23/2018 10/5/2018, 83 FR 50274
42-0048 Baseline Period and Baseline Emission Rate 3/23/2018 10/5/2018, 83 FR 50274
42-0051 Actual Emissions 3/23/2018 10/5/2018, 83 FR 50274
42-0055 Unassigned Emissions 3/23/2018 10/5/2018, 83 FR 50274
42-0080 Plant Site Emission Limit Compliance 3/23/2018 10/5/2018, 83 FR 50274
42-0090 Combining and Splitting Sources and Changing Primary SIC Code 3/23/2018 10/5/2018, 83 FR 50274
Title 47-Rules for Outdoor Burning
47-001 General Policy 7/13/2018 2/20/2019, 84 FR 5000
47-005 Exemptions from these Rules 7/13/2018 2/20/2019, 84 FR 5000
47-010 Definitions 7/13/2018 2/20/2019, 84 FR 5000 Except the definition of "nuisance".
47-015 Open Burning Requirements 7/13/2018 2/20/2019, 84 FR 5000 Except (1)(d) and (1)(h).
47-020 Letter Permits 7/13/2018 2/20/2019, 84 FR 5000 Except (3), (9)(i), and (10).
Title 48-Rules for Fugitive Emissions
48-001 General Policy 3/23/2018 10/5/2018, 83 FR 50274
48-005 Definitions 3/23/2018 10/5/2018, 83 FR 50274
48-010 General Applicability 3/23/2018 10/5/2018, 83 FR 50274
48-015 General Requirements for Fugitive Emissions 3/23/2018 10/5/2018, 83 FR 50274
Title 50-Ambient Air Standards and PSD Increments
50-001 Definitions 3/23/2018 10/5/2018, 83 FR 50274
Ambient Air Quality Standards
50-005 Purpose and Scope of Ambient Air Quality Standards 3/23/2018 10/5/2018, 83 FR 50274
50-015 Suspended Particulate Matter 3/23/2018 10/5/2018, 83 FR 50274
50-025 Sulfur Dioxide 3/23/2018 10/5/2018, 83 FR 50274
50-030 Carbon Monoxide 3/23/2018 10/5/2018, 83 FR 50274
50-035 Ozone 3/23/2018 10/5/2018, 83 FR 50274
50-040 Nitrogen Dioxide 3/23/2018 10/5/2018, 83 FR 50274
50-045 Lead 3/23/2018 10/5/2018, 83 FR 50274
PSD Increments
50-050 General 3/23/2018 10/5/2018, 83 FR 50274
50-055 Ambient Air PSD Increments 3/23/2018 10/5/2018, 83 FR 50274
50-060 Ambient Air Ceilings 3/31/2014 10/5/2018, 83 FR 50274
50-065 Ambient Air Quality Impact Levels for Maintenance Areas 3/23/2018 10/5/2018, 83 FR 50274
Title 51-Air Pollution Emergencies
51-005 Introduction 3/23/2018 10/5/2018, 83 FR 50274
51-007 Definitions 3/23/2018 10/5/2018, 83 FR 50274
51-010 Episode Stage Criteria for Air Pollution Emergencies 3/23/2018 10/5/2018, 83 FR 50274
51-011 Special Conditions 3/23/2018 10/5/2018, 83 FR 50274
51-015 Source Emission Reduction Plans 3/23/2018 10/5/2018, 83 FR 50274
51-020 Preplanned Abatement Strategies 3/23/2018 10/5/2018, 83 FR 50274
51-025 Implementation 3/23/2018 10/5/2018, 83 FR 50274
Table I Air Pollution Episode, Alert Conditions Emission Reduction Plan 3/23/2018 10/5/2018, 83 FR 50274
Table II Air Pollution Episode, Warning Conditions Emission Reduction Plan 3/23/2018 10/5/2018, 83 FR 50274
Table III Air Pollution Episode, Emergency Conditions Emission Reduction Plan 3/23/2018 10/5/2018, 83 FR 50274
1 ?The EPA approves the requirements in Table 4 of this paragraph (c) only to the extent they apply to (1) pollutants for which NAAQS have been established (criteria pollutants) and precursors to those criteria pollutants as determined by the EPA for the applicable geographic area; and (2) any additional pollutants that are required to be regulated under Part C of Title I of the CAA, but only for the purposes of meeting or avoiding the requirements of Part C of Title I of the CAA.


(d) EPA approved state source-specific requirements.

page 38035page 38036page 38037


[top] 
Name of source Permit No. State effective date EPA approval date Explanations
Industrial Laundry & Dry Cleaners 26-3025 12/9/1980 8/27/1981, 46 FR 43142 Air Contaminant Discharge Permit.
VANPLY, Inc. & Spalding Pulp & Paper Co Stipulation and Consent Final Order 12/30/1980 8/27/1981, 46 FR 43142 Transfer by VANPLY, INC. of a VOC Offset to Spalding Pulp & Paper Co.
Spaulding Pulp and Paper Co 36-6041 12/11/1980 8/27/1981, 46 FR 43142 Air Contaminant Discharge Permit-Addendum No. 1.
Weyerhaeuser Company-Bly, Oregon 18-0037 2/3/1981 11/6/1981, 46 FR 55101 Air Contaminant Discharge Permit-Conditions 5 and 6.
Intel Corporation 34-2681 9/24/1993 (State effective date of Title V Program) 7/18/1996, 61 FR 37393 Oregon Title-V Operating Permit-Page 11.
Cascade General (Port of Portland) 26-3224 10/4/1995 3/7/1997, 62 FR 10455 Air Contaminant Discharge Permit-Condition 19 of Addendum 2.
White Consolidated Inc 34-2060 8/1/1995 3/7/1997, 62 FR 10455 Air Contaminant Discharge Permit-Conditions 11,12 and 13 in Addendum No. 2.
PCC Structurals, Inc 26-1867 4/4/1997 6/20/1997, 62 FR 33548 Air Contaminant Discharge Permit-Conditions 19, 20 and 21 in Addendum No. 2.
Dura Industries 26-3112 9/14/1995 3/31/1998, 63 FR 15293 Air Contaminant Discharge Permit.
Ostrander Construction Company Fremont Sawmill ACDP No. 19-0002 4/29/1998 9/21/1999, 64 FR 51051 Air Contaminant Discharge Permit.
Ash Grove Cement Company Permit No. 01-0029-TV-01 10/16/2020 10/8/2024, 89 FR 81361 Permit conditions (3), (9) through (11), (14), (16) through (28), (42), (45) through (76), (84) through (97), (99), (100), and (102) only.
Biomass One, L.P Order No. 15-0159 8/9/2021 10/8/2024, 89 FR 81361
Boise Cascade Wood Products, LLC-Elgin Complex Order No. 31-0006 8/12/2021 10/8/2024, 89 FR 81361
Boise Cascade Wood Products, LLC-Elgin Complex Permit No. 31-0006-TV-01 12/5/2016 10/8/2024, 89 FR 81361 Permit condition (56), (59) through (75), (77), and (78) only.
Boise Cascade Wood Products, LLC-Medford Order No. 15-0004 8/9/2021 10/8/2024, 89 FR 81361
Boise Cascade Wood Products, LLC-Medford Permit No. 15-0004-TV-01 2/20/2020 10/8/2024, 89 FR 81361 Permit conditions (71), (72), and (74) through (88) only.
Cascade Pacific Pulp, LLC-Halsey Pulp Mill Order No. 22-3501-A2 8/25/2023 10/8/2024, 89 FR 81361
Cascades Tissue Group: A Division of Cascades Holding US Inc Order No. 05-1849 8/18/2021 10/8/2024, 89 FR 81361
Cascades Tissue Group: A Division of Cascades Holding US Inc Permit No. 05-1849-TV-01 04/6/2018 10/8/2024, 89 FR 81361 Permit conditions (24), (25), (27), and (29) through (43) only.
Collins Products, L.L.C Permit No. 18-0013-TV-01 1/26/2015 10/8/2024, 89 FR 81361 Permit conditions (3), (14) through (16), (19) through (24), (34 through (42), (63) through (75), and (77) only.
Columbia Forest Products, Inc Permit No. 18-0014-TV-01 9/26/2017 10/8/2024, 89 FR 81361 Permit conditions (3), (8) through (20), (22), (23), (34) through (52), (58) through (66), (67-introductory paragraph), (67.a), (67.b.iii) through (67.b.v), and (68) through (70).
EVRAZ Inc Order No. 26-1865 8/9/2021 10/8/2024, 89 FR 81361
Gas Transmission Northwest LLC-Compressor Station 12 Order No. 09-0084 8/9/2021 10/8/2024, 89 FR 81361
Gas Transmission Northwest LLC-Compressor Station 12 Permit No. 09-0084-TV-01 8/10/2017 10/8/2024, 89 FR 81361 Permit conditions (32) through (34) and (37) through (50) only.
Gas Transmission Northwest LLC-Compressor Station 13 Order No. 03-2729-A1 6/1/2022 10/8/2024, 89 FR 81361 OAH CASE NO. 2021-ABC-04835; DEQ CASE NO. AQ/RH-HQ-2021-140.
Gas Transmission Northwest LLC-Compressor Station 13 Permit No. 18-0096-TV-01 7/11/2018 10/8/2024, 89 FR 81361 Permit conditions (24) through (26), (32) through (35), and (37) through (44) only.
Georgia-Pacific-Toledo LLC Order No. 21-0005, Amendment No. 21-005-A1 12/5/2022 10/8/2024, 89 FR 81361
Georgia Pacific-Wauna Mill Order No. 04-0004, Amendment No. 04-004-A1 12/5/2022 10/8/2024, 89 FR 81361
Gilchrist Forest Products Permit No. 18-0005-TV-01 7/25/2023 10/8/2024, 89 FR 81361 Permit conditions (4), (5), (9), (10), (12) though (19), (41) through (43), (45) through (59), and (61) only.
International Paper-Springfield Order No. 208850 8/9/2021 10/8/2024, 89 FR 81361
International Paper-Springfield Permit No. 208850 10/4/2016 10/8/2024, 89 FR 81361 Permit conditions (186) through (189), (192), and (198) only.
JELD-WEN Permit No. 18-0006-TV-01 12/01/2021 10/8/2024, 89 FR 81361 Permit conditions (55) through (77) and (80) through (87) only.
JELD-WEN Permit No. 18-0006-TV-01, Addendum No. 1 8/11/2022 10/8/2024, 89 FR 81361 Permit conditions 53 and 53b only.
Kingsford Manufacturing Company Permit No. 204402, addendum No. 2 11/15/2021 10/8/2024, 89 FR 81361 Permit conditions (71) through (73) and (75) through (91) only.
Klamath Energy LLC-Klamath Cogeneration Permit No. 18-0003-TV-01 6/12/2017 10/8/2024, 89 FR 81361 Permit conditions (10) through (16), (18), (24) through (28), (32) through (37), (39) through (49), (51), (52), and (54), and (56) only.
Klamath Energy LLC-Klamath Cogeneration Permit No. 18-0003-TV-01, Addendum No. 1 12/8/2020 10/8/2024, 89 FR 81361 Permit conditions (3.a), (3.b), (61.l), and (66.b.xii).
Northwest Pipeline LLC-Baker Compressor Station Order No. 01-0038, amendment 01-0038-A1 2/1/2022 10/8/2024, 89 FR 81361
Northwest Pipeline LLC-Baker Compressor Station Permit No. 01-0038-TV-01 1/12/2017 10/8/2024, 89 FR 81361 Permit conditions (27) through (30) and (32) through (43) only.
Northwest Pipeline LLC-Oregon City Compressor Station Order No. 03-2729, amendment 03-2729-A1 2/1/2022 10/8/2024, 89 FR 81361
Northwest Pipeline LLC-Oregon City Compressor Station Permit No. 03-2729-TV-01 2/19/2013 10/8/2024, 89 FR 81361 Permit conditions (7), (19), (25) through (27), (38), (41), (45), and (50) through (65).
Ochoco Lumber Company Permit No. 12-0032-ST-01 6/25/2019 10/8/2024, 89 FR 81361 Permit conditions (1.1) through (1.3), (1.6), ( 2.1) through (2.5), (4.1) though (4.4), and (5.1) through (6.2).
Owens-Brockway Glass Container Inc Order No. 26-1876 8/9/2021 10/8/2024, 89 FR 81361
Owens-Brockway Glass Container Inc Permit No. 26-1876-TV-01 12/10/2019 10/8/2024, 89 FR 81361 Permit conditions (33) through (48) only.
Pacific Wood Laminates, Inc Permit No. 08-0003-TV-01 12/30/2019 10/8/2024, 89 FR 81361 Permit conditions (3), (9), (10), (12) through (19), (26) through (41), (56) through (71), and (73) only.
PGE Beaver Plant/Port Westward I Plant Order No. 05-2606 8/10/2021 10/8/2024, 89 FR 81361
PGE Beaver Plant/Port Westward I Plant Permit No. 05-2520 01/21/2009 10/8/2024, 89 FR 81361 Permit conditions (62) through (66), (68) through (78), (79.a), (80) through (83), (85), (87), (88.a), (89.d), (89.f), and (89.i) only.
Roseburg Forest Products-Dillard Order No. 10-0025 8/9/2021 10/8/2024, 89 FR 81361
Roseburg Forest Products-Medford MDF Permit No. 15-0073-TV-01 08/18/2022 10/8/2024, 89 FR 81361 Permit conditions (44) through (46), (48) through (61), (63), and (64) only.
Roseburg Forest Products-Riddle Plywood Permit No. 10-0078-TV-01 07/31/2019 10/8/2024, 89 FR 81361 Permit conditions (65), (66), (68) through (81) only.
Swanson Group Mfg. LLC Permit No. 10-0045-TV-01 06/12/2017 10/8/2024, 89 FR 81361 Permit conditions (4), (10) through (24), (25-introductory paragraph), (25.a) through (25.c), (27) through (40), (50) through (64), and (66) only.
Timber Products Co. Limited Partnership Permit No. 15-0025-TV-01 6/23/2022 10/8/2024, 89 FR 81361 Permit conditions (70) through (72) and (74) through (90) only.
Willamette Falls Paper Company Order No. 03-2145 8/9/2021 10/8/2024, 89 FR 81361
Willamette Falls Paper Company Permit No. 03-2145-TV-01 2/24/2016 10/8/2024, 89 FR 81361 Permit conditions (40) through (55) only.
Woodgrain Millwork LLC-Particleboard Permit No. 31-0002-TV-01 5/24/2021 10/8/2024, 89 FR 81361 Permit conditions (3), (12) through (21), (22-introductory paragraph), (22.a), (22.e), (22.f), (23), (25) through (28), (30) through (35), (37), (39) through (41), (43), (44), (46), (48), (49), (51) through (72), (80) through (94), and (96) only.
1 ?The EPA does not have the authority to remove these source-specific requirements in the absence of a demonstration that their removal would not interfere with attainment or maintenance of the NAAQS, violate any prevention of significant deterioration increment or result in visibility impairment. The Oregon Department of Environmental Quality may request removal by submitting such a demonstration to the EPA as a SIP revision.


(e) EPA approved nonregulatory provisions and quasi-regulatory measures.

State citation Title/subject State effective date EPA approval date Explanations
ORS Chapter 468 General Administration, Enforcement, Pollution Control Facilities Tax Credit 11/4/1993 7/19/1995, 60 FR 37013
ORS Chapter 468A Air Pollution Control, Regional Air Quality Control Authorities, Motor Vehicle Pollution Control, Field Burning and Propane 11/4/1993 7/19/1995, 60 FR 37013 Except 468A.075 and 468A.330.
ORS Chapter 468A.330 Small Business Stationary Source Technical and Environmental Compliance Assistance Program 11/4/1993 9/5/1995, 60 FR 46025
ORS Chapter 477.013 Smoke Management Plan; rules 3/1/2019 5/25/2021, 86 FR 27976

page 38038


[top] 
State citation Title/subject State effective date EPA approval date Explanations
Oregon Administrative Rules
Division 11-Rules of General Applicability and Organization
011-0005 Definitions 1/6/2014 10/23/2015, 80 FR 64346
011-0009 Incorporation of Attorney General's Uniform and Model Rules 3/20/2008 4/25/2013, 78 FR 24347
011-0010 Notice of Rulemaking 3/20/2008 4/25/2013, 78 FR 24347
011-0024 Rulemaking Process 1/6/2014 10/23/2015, 80 FR 64346
011-0029 Policy on Disclosure of the Relationship Between Proposed Rules and Federal Requirements 1/6/2014 10/23/2015, 80 FR 64346
011-0046 Petition to Promulgate, Amend, or Repeal Rule: Content of Petition, Filing or Petition 1/6/2014 10/23/2015, 80 FR 64346
011-0053 Periodic Rule Review 1/6/2014 10/23/2015, 80 FR 64346
011-0061 Declaratory Ruling: Institution of Proceedings, Consideration of Petition and Disposition of Petition 1/6/2014 10/23/2015, 80 FR 64346
011-0310 Purpose 1/6/2014 10/23/2015, 80 FR 64346
011-0330 Requests for Review or to Obtain Copies of Public Records 1/6/2014 10/23/2015, 80 FR 64346
011-0340 Costs for Record Review and Copying 1/6/2014 10/23/2015, 80 FR 64346
011-0360 Collecting Fees 1/6/2014 10/23/2015, 80 FR 64346
011-0370 Certification of Copies of Records 1/6/2014 10/23/2015, 80 FR 64346
011-0380 Fee Waivers and Reductions 1/6/2014 10/23/2015, 80 FR 64346
011-0390 Exempt Records 1/6/2014 10/23/2015, 80 FR 64346
011-0500 Contested Case Proceedings Generally 1/6/2014 10/23/2015, 80 FR 64346
011-0510 Agency Representation by Environmental Law Specialist 1/6/2014 10/23/2015, 80 FR 64346
011-0515 Authorized Representative of a Participant other than a Natural Person in a Contested Case Hearing 1/6/2014 10/23/2015, 80 FR 64346
011-0520 Liability for the Acts of a Person's Employees 1/6/2014 10/23/2015, 80 FR 64346
011-0525 Service and Filing of Documents 1/6/2014 10/23/2015, 80 FR 64346
011-0530 Requests for Hearing 1/6/2014 10/23/2015, 80 FR 64346
011-0535 Final Orders by Default 1/6/2014 10/23/2015, 80 FR 64346
011-0540 Consolidation or Bifurcation of Contested Case Hearings 1/6/2014 10/23/2015, 80 FR 64346
011-0545 Burden and Standard of Proof in Contested Case Hearings; DEQ Interpretation of Rules and Statutory Terms 1/6/2014 10/23/2015, 80 FR 64346
011-0550 Discovery 1/6/2014 10/23/2015, 80 FR 64346
011-0555 Subpoenas 1/6/2014 10/23/2015, 80 FR 64346
011-0565 Immediate Review 1/6/2014 10/23/2015, 80 FR 64346
011-0570 Permissible Scope of Hearing 1/6/2014 10/23/2015, 80 FR 64346
011-0573 Proposed Orders in Contested Cases 1/6/2014 10/23/2015, 80 FR 64346
011-0575 Review of Proposed Orders in Contested Cases 1/6/2014 10/23/2015, 80 FR 64346
011-0580 Petitions for Reconsideration or Rehearing 1/6/2014 10/23/2015, 80 FR 64346
011-0585 Petitions for a Stay of the Effect of a Final Order 1/6/2014 10/23/2015, 80 FR 64346
Division 12-Enforcement Procedure and Civil Penalties ? 1
012-0026 Policy 1/6/2014 10/23/2015, 80 FR 64346
012-0027 Rule Effective Date 3/29/2006 4/25/2013, 78 FR 24347
012-0028 Scope of Applicability 1/6/2014 10/23/2015, 80 FR 64346
012-0030 Definitions 11/16/2018 10/31/2019, 84 FR 58324
012-0038 Warning Letters, Pre-Enforcement Notices and Notices of Permit Violation 1/6/2014 10/23/2015, 80 FR 64346
012-0041 Formal Enforcement Actions 1/6/2014 10/23/2015, 80 FR 64346
012-0042 Determination of Base Penalty 5/13/2005 4/25/2013, 78 FR 24347
012-0045 Civil Penalty Determination Procedure 1/6/2014 10/23/2015, 80 FR 64346
012-0053 Classification of Violations that Apply to all Programs 11/16/2018 10/31/2019, 84 FR 58324
012-0054 Air Quality Classification of Violations 11/16/2018 10/31/2019, 84 FR 58324
012-0073 Environmental Cleanup Classification of Violation 3/29/2006 4/25/2013, 78 FR 24347
012-0082 Contingency Planning Classification of Violations 3/29/2006 4/25/2013, 78 FR 24347
012-0130 Determination of Violation Magnitude 1/6/2014 10/23/2015, 80 FR 64346
012-0135 Selected Magnitude Categories 11/16/2018 10/31/2019, 84 FR 58324
012-0140 Determination of Base Penalty 11/16/2018 10/31/2019, 84 FR 58324
012-0145 Determination of Aggravating or Mitigating Factors 1/6/2014 10/23/2015, 80 FR 64346
012-0150 Determination of Economic Benefit 1/6/2014 10/23/2015, 80 FR 64346
012-0155 Additional or Alternate Civil Penalties 1/6/2014 10/23/2015, 80 FR 64346
012-0160 DEQ Discretion Regarding Penalty Assessment 1/6/2014 10/23/2015, 80 FR 64346
012-0162 Inability to Pay the Penalty 1/6/2014 10/23/2015, 80 FR 64346
012-0165 Stipulated Penalties 1/6/2014 10/23/2015, 80 FR 64346
012-0170 Compromise or Settlement of Civil Penalty by DEQ 1/6/2014 10/23/2015, 80 FR 64346
Division 200-General Air Pollution Procedures and Definitions
Conflicts of Interest
200-0100 Purpose 4/16/2015 10/11/2017, 82 FR 47122
200-0110 Public Interest Representation 4/16/2015 10/11/2017, 82 FR 47122
200-0120 Disclosure of Potential Conflicts of Interest 4/16/2015 10/11/2017, 82 FR 47122
Division 209-Public Participation
209-0070 Hearing Procedures 4/16/2015 10/11/2017, 82 FR 47122
Division 262-Heat Smart Program for Residential Wood Stoves and Other Solid Fuel Heating Devices
262-0050 Residential Woodheating-Civil Penalties 10/14/1999 1/22/2003, 68 FR 2891
1 ?The EPA approves the provisions in Table 2 of this paragraph (e) only to the extent the provisions relate to enforcement of the requirements contained in the Oregon SIP.


page 38039


[top] 
LRAPA citation Title/subject State effective date EPA approval date Explanations
Title 13-General Duties and Powers of Board and Director
13-005 Authority of the Agency 3/31/2014 10/5/2018, 83 FR 50274
13-010 Duties and Powers of the Board of Directors 3/31/2014 10/5/2018, 83 FR 50274
13-020 Duties and Function of the Director 3/31/2014 10/5/2018, 83 FR 50274
13-025 Conflict of Interest 3/31/2014 10/5/2018, 83 FR 50274
13-030 Advisory Committee 3/31/2014 10/5/2018, 83 FR 50274
13-035 Public Records and Confidential Information 3/31/2014 10/5/2018, 83 FR 50274
Title 14-Rules of Practice and Procedure
14-110 Definitions 3/23/2018 10/5/2018, 83 FR 50274
Rulemaking
14-115 Rulemaking Notice 3/23/2018 10/5/2018, 83 FR 50274
14-120 Rulemaking Hearings and Process 3/23/2018 10/5/2018, 83 FR 50274
14-125 Temporary Rules 3/23/2018 10/5/2018, 83 FR 50274
14-130 Petition to Promulgate, Amend or Repeal Rule-Content of Petition, Filing of Petition 3/23/2018 10/5/2018, 83 FR 50274
14-135 Declaratory Rulings 3/23/2018 10/5/2018, 83 FR 50274
Contested Cases
14-140 Contested Case Proceedings Generally 3/23/2018 10/5/2018, 83 FR 50274
14-145 Agency Representation by Environmental Law Specialist 3/23/2018 10/5/2018, 83 FR 50274
14-147 Authorized Representative of Respondent other than a Natural Person in a Contested Case Hearing 3/23/2018 10/5/2018, 83 FR 50274
14-150 Liability for the Acts of a Person's Employees 3/23/2018 10/5/2018, 83 FR 50274
14-155 Consolidation or Bifurcation of Contested Case Hearings 3/23/2018 10/5/2018, 83 FR 50274
14-160 Final Orders 3/23/2018 10/5/2018, 83 FR 50274
14-165 Default Orders 3/23/2018 10/5/2018, 83 FR 50274
14-170 Appeal to the Board 3/23/2018 10/5/2018, 83 FR 50274
14-175 Power of the Director 3/23/2018 10/5/2018, 83 FR 50274
14-185 Request for Stay Pending Judicial Review 3/23/2018 10/5/2018, 83 FR 50274
14-190 Request for Stay-Motion to Intervene 3/23/2018 10/5/2018, 83 FR 50274
14-200 Request for Stay-Agency Determination 3/23/2018 10/5/2018, 83 FR 50274
14-205 Request for Stay-Time Frames 3/23/2018 10/5/2018, 83 FR 50274
Title 15-Enforcement Procedures and Civil Penalties? 1
15-001 Policy 9/14/2018 2/20/2019, 84 FR 5000
15-003 Scope of Applicability 6/13/1995 8/3/2001, 66 FR 40616
15-005 Definitions 5/17/2019 10/31/2019, 84 FR 58327
15-010 Consolidation of Proceedings 6/13/1995 8/3/2001, 66 FR 40616
15-015 Notice of Violation 9/14/2018 2/20/2019, 84 FR 5000
15-018 Notice of Permit Violations (NPV) and Exceptions 5/17/2019 10/31/2019, 84 FR 58327
15-020 Enforcement Actions 5/17/2019 10/31/2019, 84 FR 58327
15-025 Civil Penalty Schedule Matrices 5/17/2019 10/31/2019, 84 FR 58327
15-030 Civil Penalty Determination Procedure (Mitigating and Aggravating Factors) 5/17/2019 10/31/2019, 84 FR 58327
15-035 Written Notice of Civil Penalty Assessment-When Penalty Payable 9/14/2018 2/20/2019, 84 FR 5000
15-040 Compromise or Settlement of Civil Penalty by Director 9/14/2018 2/20/2019, 84 FR 5000
15-045 Stipulated Penalties 5/17/2019 10/31/2019, 84 FR 58327
15-050 Additional Civil Penalties 6/13/1995 8/3/2001, 66 FR 40616
15-055 Air Quality Classification of Violation 5/17/2019 10/31/2019, 84 FR 58327
15-057 Determination of Violation Magnitude 9/14/2018 2/20/2019, 84 FR 5000
15-060 Selected Magnitude Categories 5/17/2019 10/31/2019, 84 FR 58327
15-065 Appeals 9/14/2018 2/20/2019, 84 FR 5000
Title 31-Public Participation
31-0070 Hearing Procedures 3/23/2018 10/5/2018, 83 FR 50274
1 ?The EPA approves the provisions in Table 3 of this paragraph (e) only to the extent the provisions relate to enforcement of the requirements contained in the Oregon SIP.


page 38040


[top] 
Agency and ordinance Title or subject Date EPA approval date Explanations
Codified Ordinances of Jackson County 1810.09 Abatement; Legal Proceedings 12/20/1989 (county passed) 6/19/2006, 71 FR 35163
Codified Ordinances of Jackson County 1810.99 Penalty 10/29/2003 (county passed) 6/19/2006, 71 FR 35163
Code of the City of Medford, Oregon: 7.226 Abatement; Legal Proceedings 11/20/1989 (county effective) 6/19/2006, 71 FR 35163
Code of the City of Medford, Oregon: 7.300 Penalty 4/6/2000 (county effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.100 Abatement-Notice 1966 (city effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.110 Abatement-By owner 1966 (city effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.120 Abatement-By city 1966 (city effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.130 Abatement-Assessment of costs 1966 (city effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.140 Summary abatement 1966 (city effective) 6/19/2006, 71 FR 35163
City of Central Point Municipal Code: 8.04.150 Penalty 1995 (city effective) 6/19/2006, 71 FR 35163
City of Ashland Municipal Code: 10.30.050 Definitions 1993 (city effective) 6/19/2006, 71 FR 35163
City of Ashland Municipal Code: 9.24.060 Penalty 1998 (city effective) 6/19/2006, 71 FR 35163


page 38041page 38042page 38043page 38044page 38045


[top] 
Name of SIP provision Applicable geographic or nonattainment area State submittal date EPA approval date Explanations
Volume 2-The Federal Clean Air Act Implementation Plan
Section 1-Introduction
Introduction Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Section 2-General Administration
General Administration Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Agency Organization Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Legal Authority Statewide 7/29/1992 7/19/1995, 60 FR 37013
Resources Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Intergovernmental cooperation Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Miscellaneous Provisions Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Small Business Assistance Program Statewide 11/16/1992 9/05/1995, 60 FR 46025
Section 3-Statewide Regulatory Provisions
Statewide Regulatory Provisions Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006 Refer to section (c) and (d) for approved regulations incorporated by reference.
Oregon Administrative Rules and Source-Specific RACT determinations Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006 Refer to section (c) for approved regulations incorporated by reference and section (d) for Source-Specific RACT determinations.
Lane Regional Air Protection Agency Regulations Lane County 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006 Refer to section (c) for approved regulations incorporated by reference.
Smoke Management Plan Administrative Rule Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006 Refer to section (c) for approved regulations incorporated by reference (OAR chapter 629 43-043).
Section 4-Control Strategies for Nonattainment Areas
Introduction Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Attainment and Maintenance Planning-Carbon Monoxide (CO)
Carbon Monoxide Attainment Plan Salem 6/20/1979; 6/29/1979 6/24/1980, 45 FR 42265
Carbon Monoxide Attainment Plan Eugene-Springfield 6/20/1979; 6/29/1979 6/24/1980, 45 FR 42265
Carbon Monoxide Attainment Plan Portland-Vancouver 7/20/1982 10/07/1982, 47 FR 44261
Carbon Monoxide Attainment Plan Medford-Ashland 10/09/1985 2/13/1987, 52 FR 4620
Carbon Monoxide Attainment Plan Grants Pass 11/24/1986 1/15/1988, 53 FR 1020
Carbon Monoxide Maintenance Plan Eugene-Springfield 12/28/1989 12/06/1993, 58 FR 64161
Carbon Monoxide Attainment Plan Grants Pass, Medford, Portland and Klamath Falls 11/15/1993 6/28/1994, 59 FR 33202 CO contingency plan revision to satisfy 172(c)(9).
Carbon Monoxide MaintenancePlan Portland 8/30/1996 9/02/1997, 62 FR 46208
Carbon Monoxide Maintenance Plan Grants Pass 11/10/1999 8/31/2000, 65 FR 52932
Carbon Monoxide Maintenance Plan Klamath Falls 11/20/2000 9/20/2001, 66 FR 48349
Carbon Monoxide Maintenance Plan Medford 5/31/2001 7/24/2002, 67 FR 48388
Carbon Monoxide 2nd 10-year Maintenance Plan Portland 12/27/2004 1/24/2006, 71 FR 3768
Carbon Monoxide Limited Maintenance Plan Salem-Keizer 8/09/2007 12/30/2008, 73 FR 79655
Carbon Monoxide 2nd 10-year Maintenance Plan Update Portland 1/14/2014 5/22/2014, 79 FR 29359 TCM substitution.
Carbon Monoxide 2nd 10-year Limited Maintenance Plan Grants Pass 4/22/2015 7/28/2015, 80 FR 44864
Carbon Monoxide 2nd 10-year Limited Maintenance Plan Medford 12/11/2015 7/20/2016, 81 FR 47029
Attainment and Maintenance Planning-Ozone
Ozone Attainment Plan Salem 10/16/1980 4/12/1982, 47 FR 15587
Ozone Attainment Plan Portland-Vancouver 7/20/1982 10/07/1982, 47 FR 44261
Ozone Maintenance Plan Medford-Ashland 2/28/1985 6/04/1986, 51 FR 20285
Ozone Maintenance Plan Portland-Vancouver 8/30/1996 5/19/1997, 62 FR 27204
Ozone Maintenance Plan Portland-Vancouver & Salem-Keizer 8/09/2005; 5/22/2007 12/19/2011, 76 FR 78571 Portland-Vancouver AQMA (Oregon portion) & Salem Keizer Area 8-hour Ozone (110(a)(1)) Maintenance Plan.
Attainment and Maintenance Planning-Total Suspended Particulate (TSP)
TSP Attainment Plan Portland-Vancouver 3/24/1981 4/12/1982, 47 FR 15587
TSP Attainment Plan Eugene-Springfield 2/23/1981 4/12/1982, 47 FR 15587
TSP Attainment Plan Medford-Ashland 4/25/1983 8/15/1984, 49 FR 32574
Attainment and Maintenance Planning-Particulate Matter (PM 10 )
PM 10 Attainment Plan Grants Pass 11/15/1991 12/17/1993, 58 FR 65934
PM 10 Attainment Plan Eugene-Springfield 11/15/1991 8/24/1994, 59 FR 43483
PM 10 Attainment Plan LaGrande 11/15/1991 3/15/1995, 60 FR 8563
PM 10 Attainment Plan Klamath Falls 11/15/1991; 9/20/1995 4/14/1997, 62 FR 18047
PM 10 Attainment Plan Oakridge 12/09/1996 3/15/1999, 64 FR 12751
PM 10 Attainment Plan Lakeview 6/01/1995 9/21/1999, 64 FR 51051
PM 10 Maintenance Plan Klamath Falls 11/04/2002 10/21/2003,68 FR 60036
PM 10 Maintenance Plan Grants Pass 11/04/2002 10/27/2003, 68 FR 61111
PM 10 Attainment Plan and Maintenance Plan Medford-Ashland 3/10/2005 6/19/2006, 71 FR 35163
PM 10 Maintenance Plan La Grande 10/25/2005 6/19/2006, 71 FR 35161
PM 10 Maintenance Plan Lakeview 10/25/2005 6/19/2006, 71 FR 35159
PM 10 Limited Maintenance Plan Eugene-Springfield 1/13/2012 4/11/2013, 78 FR 21547
PM 10 2nd 10-year Limited Maintenance Plan Grants Pass 4/22/2015 7/30/2015, 80 FR 45431
Oakridge PM 10 Maintenance Plan Oakridge 1/13/2022 8/22/2022, 87 FR 51265
Attainment and Maintenance Planning-Particulate Matter (PM 2.5 )
PM 2.5 Attainment Plan Klamath Falls 12/12/2012 6/06/2016, 81 FR 36176
2012 PM 2.5 Attainment Plan Oakridge-Westfir 12/12/2012 10/21/2016, 81 FR 72714 Attainment date extension see final rule published 7/18/2016.
Updated PM 2.5 Attainment Plan Oakridge-Westfir 1/20/2017 2/08/2018, 83 FR 5537
Oakridge PM 2.5 Maintenance Plan Oakridge-Westfir 1/13/2022 8/22/2022, 87 FR 51262
Section 5-Control Strategies for Attainment and Nonattainment Areas
Control Strategies for Attainment and Nonattainment Areas Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Statewide Control Strategies for Lead Statewide 1/24/1983 5/18/1983, 48 FR 22298
Motor Vehicle Inspection and Maintenance Statewide 11/5/1999; 9/15/2000; 1/27/2000; 1/10/2003; 4/22/2004 11/27/2004, 69 FR 67819
Test Procedures and Standards Statewide 4/19/2004 11/22/2004, 69 FR 67819
Visibility Protection Plan Statewide 1/22/2003 3/15/2005, 70 FR 12587
Prevention of Significant Deterioration Statewide 7/11/1986 7/30/1991, 56 FR 36006
Oregon Regional Haze Plan-Section 308 Statewide 12/9/2010 7/05/2011, 76 FR 38997 Meets CAA requirements section 169A and 40 CFR 51.308(e) regarding BART and the requirements of 40 CFR 51.308(d)(2) and (d)(4)(v) regarding the calculation of baseline and natural conditions of OR Wilderness areas and the statewide inventory of emissionsof pollutants that are reasonably anticipated to cause or contriubte to visibulity impairment in any mandatory Class I Federal Area.
Oregon Regional Haze SIP revision Statewide 12/9/2010; 2/01/2011 8/22/2012, 77 FR 50611 Meeting CAA requirements section 169A, and 40 CFR 51.308(d)(1) and (3).
Regional Haze Progress Report Statewide 7/18/2017 5/17/2018, 83 FR 22853
Oregon Regional Haze State Implementation Plan Revision for the Second Planning Period (2018-2028) Statewide 4/29/2022 and 11/22/2023 10/8/2024, 89 FR 81361
Section 6-Ambient Air Quality Monitoring Program
Ambient Air Quality Monitoring Program Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Air Monitoring Network Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Data Handling and Analysis Procedures Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Episode Monitoring Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Section 7-Emergency Plan
Emergency Action Plan Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Section 8-Public Involvement
Public Involvement Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
Section 9-Plan Revisions and Reporting
Plan Revisions and Reporting Statewide 5/31/1986; 7/11/1986 7/30/1991, 56 FR 36006
110(a)(2) Infrastructure and Interstate Transport
Interstate Transport for the 1997 8-hour ozone NAAQS Statewide 6/23/2010; 12/23/2010 6/09/2011, 76 FR 33650 This action addresses CAA secition 110(a)(2)(D)(i)(I).
Interstate Transport for the 1997 PM2.5 NAAQS Statewide 6/23/2010; 12/23/2010 6/09/2011, 76 FR 33650 This action addresses CAA secition 110(a)(2)(D)(i)(I).
Interstate Transport for the 1997 8-hour ozone NAAQS Statewide 12/20/2010 7/05/2011, 76 FR 38997 This action addresses CAA section 110(a)(2)(D)(i)(II) as it applies to visiblity.
Interstate Transport for the 1997 PM2.5 NAAQS Statewide 12/20/2010 7/05/2011, 76 FR 38997 This action addresses CAA section 110(a)(2)(D)(i)(II) as it applies to visibility.
Interstate Transport for the 1997 8-hour ozone NAAQS Statewide 6/23/2010; 12/22/2010 12/27/2011, 76 FR 80747 This action addresses CAA section 110(a)(2)(D)(i) and section 110(a)(2)(D)(i)(II).
Interstate Transport for the 1997 24-hour PM2.5 NAAQS Statewide 6/23/2010; 12/22/2010 12/27/2011, 76 FR 80747 This action addresses CAA section 110(a)(2)(D)(i) and section 110(a)(2)(D)(i)(II).
Interstate Transport for the 2006 24-hour PM2.5 NAAQS Statewide 6/23/2010; 12/22/2010 12/27/2011, 76 FR 80747 This action addresses CAA section 110(a)(2)(D)(i)(II).
Infrastructure for the 1997 8-hour ozone NAAQS Statewide 9/25/2008 5/21/2012, 77 FR 29904 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 2008 lead NAAQS Statewide 12/27/2013 6/24/2014, 79 FR 35693 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 1997 24-hour PM2.5 NAAQS Statewide 9/25/2008 8/01/2014, 78 FR 46514 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 2006 24-hour PM2.5 NAAQS Statewide 8/17/2011 8/01/2014, 78 FR 46514 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 2008 ozone NAAQS Statewide 12/19/2011 8/01/2014, 78 FR 46514 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Interstate Transport for the 2006 24-hour PM2.5 NAAQS Statewide 12/23/2010 8/01/2014, 78 FR 46514 This action addresses CAA section 110(a)(2)(D)(i)(II) as it applies to visibility.
Interstate Transport for the 2008 ozone NAAQS Statewide 12/23/2010 8/01/2014, 78 FR 46514 This action addresses CAA section 110(a)(2)(D)(i)(II) as it applies to PSD and visibility.
Interstate Transport for the 2006 24-hour PM2.5 NAAQS Statewide 6/23/2010 1/16/2015, 80 FR 2313 This action addresses CAA section 110(a)(2)(D)(i)(I).
Interstate Transport for the 2008 ozone NAAQS Statewide 6/28/2010 12/21/2015, 80 FR79266 This action meets the requirements of CAA section 110(a)(2)(D)(i)(I).
Interstate Transport for the 2008 lead NAAQS Statewide 10/20/2015 5/16/2016, 81 FR 30181 This action meets the requirements of CAA section 110(a)(2)(D)(i)(I).
Interstate Transport for the 2010 nitrogen dioxide NAAQS Statewide 10/20/2015 5/16/2016, 81 FR 30181 This action meets the requirements of CAA section 110(a)(2)(D)(i)(I).
Infrastructure for the 2010 nitrogen dioxide NAAQS Statewide 12/27/2013 5/24/2018, 83 FR 24034 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 2010 sulfur dioxide NAAQS Statewide 12/27/2013 5/24/2018, 83 FR 24034 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Infrastructure for the 2012 PM2.5 NAAQS Statewide 10/20/2015 5/24/2018, 83 FR 24034 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Interstate Transport for the 2012 PM2.5 NAAQS Statewide 10/20/2015 9/18/2018, 83 FR 47073 This action meets the requirements of CAA section 110(a)(2)(D)(i)(I).
2015 Ozone NAAQS Interstate Transport Statewide 9/25/2018 5/17/2019, 84 FR 22376 This action addresses CAA 110(a)(2)(D)(i)(I).
Infrastructure for the 2015 Ozone NAAQS Statewide 10/21/2018 6/6/2019, 84 FR 26347 This action addresses the following CAA section 110(a)(2) elements: (A), (B), (C), (D)(i)(II), (D)(ii), (E), (F), (G), (H), (J), (K), (L), and (M).
Interstate Transport for the 2010 sulfur dioxide NAAQS Statewide 10/20/2015 7/17/2020, 85 FR 43463 This action addresses CAA 110(a)(2)(D)(i)(I).
EPA Approved Oregon State Directives
Oregon Department of Forestry Directive 1-4-1-601 Operational Guidance for the Oregon Smoke Management Program 9/27/2019 5/25/2021, 86 FR 27976
ODEQ-LRAPA Stringency Directive, Attachment B DEQ analysis and recommendations regarding which of the proposed rules that the EQC should require LRAPA to implement directly 4/22/2015 10/11/2017, 82 FR 47122
EPA Approved Manuals
ODEQ Source Sampling Manual Statewide 12/11/2018 10/31/2019, 84 FR 58324 Volumes I (November 2018 edition) and Volume II (April 2015 edition) only for purposes of the emission limits and requirements approved into the Oregon SIP.
ODEQ Continuous Emissions Monitoring Manual Statewide 4/22/2015 10/11/2017, 82 FR 47122 For purposes of the limits approved into the SIP.


[FR Doc. 2025-14971 Filed 8-6-25; 8:45 am]

BILLING CODE 6560-50-P