89 FR 152 pgs. 64486-64493 - Holtec Decommissioning International, LLC, and Holtec Palisades, LLC; Palisades Nuclear Plant; Applications for Amendments to Renewed Facility Operating License Involving Proposed No Significant Hazards Considerations and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information
Type: NOTICEVolume: 89Number: 152Pages: 64486 - 64493
Pages: 64486, 64487, 64488, 64489, 64490, 64491, 64492, 64493Docket number: [Docket No. 50-255; NRC-2024-0130]
FR document: [FR Doc. 2024-17359 Filed 8-6-24; 8:45 am]
Agency: Nuclear Regulatory Commission
Official PDF Version: PDF Version
[top]
NUCLEAR REGULATORY COMMISSION
[Docket No. 50-255; NRC-2024-0130]
Holtec Decommissioning International, LLC, and Holtec Palisades, LLC; Palisades Nuclear Plant; Applications for Amendments to Renewed Facility Operating License Involving Proposed No Significant Hazards Considerations and Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information
AGENCY:
Nuclear Regulatory Commission.
ACTION:
License amendment requests; opportunity to comment, request a hearing, and petition for leave to intervene; order.
SUMMARY:
[top] The U.S. Nuclear Regulatory Commission (NRC or the Commission) received and is considering issuance of four amendments to Renewed Facility Operating License (RFOL) No. DPR-20, that were requested by Holtec Decommissioning International, LLC (HDI), on behalf of Holtec Palisades, LLC, to support the potential reauthorization of power operations at the Palisades Nuclear Plant (PNP). For each amendment request, the NRC proposes to determine that they involve
DATES:
Comments must be filed by September 6, 2024. A request for a hearing or petition for leave to intervene must be filed by October 7, 2024. Any potential party as defined in section 2.4 of title 10 of the Code of Federal Regulations (10 CFR) who believes access to SUNSI and/or SGI is necessary to respond to this notice must request document access by August 19, 2024.
ADDRESSES:
You may submit comments by any of the following methods; however, the NRC encourages electronic comment submission through the Federal rulemaking website.
• Federal rulemaking website: Go to https://www.regulations.gov and search for Docket ID NRC-2024-0130. Address questions about Docket IDs in Regulations.gov to Stacy Schumann; telephone: 301-415-0624; email: Stacy.Schumann@nrc.gov. For technical questions, contact the individual listed in the FOR FURTHER INFORMATION CONTACT section of this document.
• Mail comments to: Office of Administration, Mail Stop: TWFN-7-A60M, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, ATTN: Program Management, Announcements and Editing Staff.
For additional direction on obtaining information and submitting comments, see "Obtaining Information and Submitting Comments" in the SUPPLEMENTARY INFORMATION section of this document.
FOR FURTHER INFORMATION CONTACT:
Marlayna Doell, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, telephone: 301-415-3178; email: Marlayna.Doell@nrc.gov.
SUPPLEMENTARY INFORMATION:
I. Obtaining Information and Submitting Comments
A. Obtaining Information
Please refer to Docket ID NRC-2024-0130 when contacting the NRC about the availability of information for this action. You may obtain publicly available information related to this action by any of the following methods:
• Federal Rulemaking Website: Go to https://www.regulations.gov and search for Docket ID NRC-2024-0130.
• NRC's Agencywide Documents Access and Management System (ADAMS): You may obtain publicly available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select "Begin Web-based ADAMS Search." For problems with ADAMS, please contact the NRC's Public Document Room (PDR) reference staff at 1-800-397-4209, at 301-415-4737, or by email to PDR.Resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in this document.
• NRC's PDR: The PDR, where you may examine and order copies of publicly available documents, is open by appointment. To make an appointment to visit the PDR, please send an email to PDR.Resource@nrc.gov or call 1-800-397-4209 or 301-415-4737, between 8 a.m. and 4 p.m. eastern time (ET), Monday through Friday, except Federal holidays.
B. Submitting Comments
The NRC encourages electronic comment submission through the Federal rulemaking website ( https://www.regulations.gov ). Please include Docket ID NRC-2024-0130 in your comment submission.
The NRC cautions you not to include identifying or contact information that you do not want to be publicly disclosed in your comment submission. The NRC will post all comment submissions at https://www.regulations.gov as well as enter the comment submissions into ADAMS. The NRC does not routinely edit comment submissions to remove identifying or contact information.
If you are requesting or aggregating comments from other persons for submission to the NRC, then you should inform those persons not to include identifying or contact information that they do not want to be publicly disclosed in their comment submission. Your request should state that the NRC does not routinely edit comment submissions to remove such information before making the comment submissions available to the public or entering the comment into ADAMS.
II. Background
A. Background
PNP consists of a single pressurized-water reactor located in Covert Township, Michigan, along the shoreline of Lake Michigan. Originally licensed for operation on March 24, 1971, the NRC issued a renewed operating license for PNP on January 17, 2007, with the renewed operating license term expiring on March 24, 2031.
On June 13, 2022, Entergy Operations, Inc., the licensee who operated the facility prior to transfer of control of the PNP license to HDI and Holtec Palisades, LLC, submitted certifications that it had permanently ceased operations of PNP and permanently removed fuel from the reactor vessel in accordance with paragraph 10 CFR 50.82(a)(1). When the NRC docketed the certifications, the PNP RFOL No. DPR-20 no longer authorized operation of the reactor, or emplacement or retention of fuel into the reactor vessel, as provided by 10 CFR 50.82(a)(2).
HDI is seeking to return PNP to power operations and has submitted several requests for NRC approval to support allowing the resumption of power operations through March 24, 2031, the end of the renewed facility operating license term under PNP RFOL No. DPR-20. These requests include four license amendment requests, which are the subject of this notice, a license transfer request, and an exemption request. The hearing opportunity for the license transfer request is being addressed by a separate notice published in today's issue of the Federal Register . Consistent with the Atomic Energy Act of 1954, as amended, and NRC regulations, the NRC is not publishing a notice of opportunity for hearing on the exemption request.
B. License Amendment Requests
The NRC is considering issuance of amendments to RFOL No. DPR-20 that were requested by HDI, on behalf of Holtec Palisades, LLC, to support reauthorization of commercial power operations at PNP. These license amendment requests are the subject of this notice and are listed in tabular form in Section III of this document.
[top] Before any issuance of the proposed license amendments, the NRC will need to make the findings required by the Atomic Energy Act of 1954, as amended (the Act), and the NRC's regulations. Pursuant to Section 189a.(2) of the Act, the NRC is publishing this notice. The Act requires the Commission to publish notice of any amendments issued or proposed to be issued, and grants the Commission the authority to issue and make immediately effective any amendment to an operating license or combined license, as applicable, upon a determination by the Commission that such amendment involves no significant hazards consideration, notwithstanding
The scope of this notice is limited to comments, requests for a hearing, and petitions for leave to intervene related to the four proposed license amendment requests listed in tabular form in Section III of this document. The proposed direct transfer of the PNP license from HDI to Palisades Energy, LLC, is available for comment, as well as the opportunity to request a hearing and petition for leave to intervene, in a separate notice published in today's issue of the Federal Register .
The NRC staff also notes that, although the four amendment requests state that a categorical exclusion applies to the requested amendments, the NRC staff is not relying on a categorical exclusion for these actions but is instead preparing an environmental assessment (EA) to evaluate the environmental impacts from the proposed Federal actions related to reauthorizing power operations at PNP, which include the license amendment requests. The NRC's decision to prepare an EA and additional detail about the environmental review are discussed in the NRC's notice of intent to prepare an EA and conduct scoping, published on June 27, 2024 (89 FR 53659).
III. Notice of Consideration of Issuance of Amendments to Renewed Facility Operating License, Proposed No Significant Hazards Consideration Determination, and Opportunity for a Hearing
The Commission has made a proposed determination that the four amendment requests listed in this notice involve no significant hazards consideration. Under the Commission's regulations in 10 CFR 50.92, this means that operation of the facility in accordance with the proposed amendments would not (1) involve a significant increase in the probability or consequences of an accident previously evaluated, or (2) create the possibility of a new or different kind of accident from any accident previously evaluated, or (3) involve a significant reduction in a margin of safety. The basis for this proposed determination for each amendment request is included in the license amendment requests as referenced in tabular form in Section III of this document.
The Commission is seeking public comments on these proposed determinations. Any comments received within 30 days after the date of publication of this notice will be considered in making any final determinations.
Normally, the Commission will not issue the amendments until the expiration of 60 days after the date of publication of this notice. The Commission may issue any of these license amendments before expiration of the 60-day period provided that its final determination is that the amendment involves no significant hazards consideration. In addition, the Commission may issue any of these amendments prior to the expiration of the 30-day comment period if circumstances change during the 30-day comment period such that failure to act in a timely way would result, for example, in prevention of resumption of operation of the facility. If the Commission takes action on any of these amendments prior to the expiration of either the comment period or the notice period, it will publish a notice of issuance in the Federal Register . If the Commission makes a final no significant hazards consideration determination for any of these amendments, any hearing will take place after issuance. The Commission expects that the need to take this action on any amendment before 60 days have elapsed will occur very infrequently.
A. Opportunity To Request a Hearing and Petition for Leave To Intervene
Within 60 days after the date of publication of this notice, any person (petitioner) whose interest may be affected by any of these actions may file a request for a hearing and petition for leave to intervene (petition) with respect to that action. Petitions shall be filed in accordance with the Commission's "Agency Rules of Practice and Procedure" in 10 CFR part 2. Interested persons should consult 10 CFR 2.309. If a petition is filed, the presiding officer will rule on the petition and, if appropriate, a notice of a hearing will be issued.
Petitions must be filed no later than 60 days from the date of publication of this notice in accordance with the filing instructions in the "Electronic Submissions (E-Filing)" section of this document. Petitions and motions for leave to file new or amended contentions that are filed after the deadline will not be entertained absent a determination by the presiding officer that the filing demonstrates good cause by satisfying the three factors in 10 CFR 2.309(c)(1)(i) through (iii).
If a hearing is requested and the Commission has not made a final determination on the issue of no significant hazards consideration, the Commission will make a final determination on the issue of no significant hazards consideration, which will serve to establish when the hearing is held. If the final determination is that the amendment request involves no significant hazards consideration, the Commission may issue the amendment and make it immediately effective, notwithstanding the request for a hearing. Any hearing would take place after issuance of the amendment. If the final determination is that the amendment request involves a significant hazards consideration, then any hearing held would take place before the issuance of the amendment unless the Commission finds an imminent danger to the health or safety of the public, in which case it will issue an appropriate order or rule under 10 CFR part 2.
A State, local governmental body, federally recognized Indian Tribe, or designated agency thereof, may submit a petition to the Commission to participate as a party under 10 CFR 2.309(h) no later than 60 days from the date of publication of this notice. Alternatively, a State, local governmental body, federally recognized Indian Tribe, or agency thereof may participate as a non-party under 10 CFR 2.315(c).
For information about filing a petition and about participation by a person not a party under 10 CFR 2.315, see ADAMS Accession No. ML20340A053 ( https://adamswebsearch2.nrc.gov/webSearch2/main.jsp?AccessionNumber=ML20340A053 ) and on the NRC's public website at https://www.nrc.gov/about-nrc/regulatory/adjudicatory/hearing.html#participate.
B. Electronic Submissions (E-Filing)
All documents filed in NRC adjudicatory proceedings, including documents filed by an interested State, local governmental body, federally recognized Indian Tribe, or designated agency thereof that requests to participate under 10 CFR 2.315(c), must be filed in accordance with 10 CFR 2.302. The E-Filing process requires participants to submit and serve all adjudicatory documents over the internet, or in some cases, to mail copies on electronic storage media, unless an exemption permitting an alternative filing method, as further discussed, is granted. Detailed guidance on electronic submissions in adjudicatory proceedings is located in the "Electronic Information Exchange System Adjudicatory User's Guide" (ADAMS Accession No. ML23150A083) and on the NRC's public website at https://www.nrc.gov/site-help/e-submittals.html .
[top] To comply with the procedural requirements of E-Filing, at least 10
Information about applying for a digital ID certificate is available on the NRC's public website at https://www.nrc.gov/site-help/e-submittals/getting-started.html . After a digital ID certificate is obtained and a docket created, the participant must submit adjudicatory documents in Portable Document Format. Guidance on submissions is available on the NRC's public website at https://www.nrc.gov/site-help/electronic-sub-ref-mat.html . A filing is considered complete at the time the document is submitted through the NRC's E-Filing system. To be timely, an electronic filing must be submitted to the E-Filing system no later than 11:59 p.m. ET on the due date. Upon receipt of a transmission, the E-Filing system time-stamps the document and sends the submitter an email confirming receipt of the document. The E-Filing system also distributes an email that provides access to the document to the NRC's Office of the General Counsel and any others who have advised the Office of the Secretary that they wish to participate in the proceeding, so that the filer need not serve the document on those participants separately. Therefore, applicants and other participants (or their counsel or representative) must apply for and receive a digital ID certificate before adjudicatory documents are filed to obtain access to the documents via the E-Filing system.
A person filing electronically using the NRC's adjudicatory E-Filing system may seek assistance by contacting the NRC's Electronic Filing Help Desk through the "Contact Us" link located on the NRC's public website at https://www.nrc.gov/site-help/e-submittals.html, by email to MSHD.Resource@nrc.gov, or by a toll-free call at 1-866-672-7640. The NRC Electronic Filing Help Desk is available between 9 a.m. and 6 p.m., ET, Monday through Friday, except Federal holidays.
Participants who believe that they have good cause for not submitting documents electronically must file an exemption request, in accordance with 10 CFR 2.302(g), with their initial paper filing stating why there is good cause for not filing electronically and requesting authorization to continue to submit documents in paper format. Such filings must be submitted in accordance with 10 CFR 2.302(b)-(d). Participants filing adjudicatory documents in this manner are responsible for serving their documents on all other participants. Participants granted an exemption under 10 CFR 2.302(g)(2) must still meet the electronic formatting requirement in 10 CFR 2.302(g)(1), unless the participant also seeks and is granted an exemption from 10 CFR 2.302(g)(1).
Documents submitted in adjudicatory proceedings will appear in the NRC's electronic hearing docket, which is publicly available at https://adams.nrc.gov/ehd, unless excluded pursuant to an order of the presiding officer. If you do not have an NRC-issued digital ID certificate as previously described, click "cancel" when the link requests certificates and you will be automatically directed to the NRC's electronic hearing docket where you will be able to access any publicly available documents in a particular hearing docket. Participants are requested not to include personal privacy information such as social security numbers, home addresses, or personal phone numbers in their filings unless an NRC regulation or other law requires submission of such information. With respect to copyrighted works, except for limited excerpts that serve the purpose of the adjudicatory filings and would constitute a Fair Use application, participants should not include copyrighted materials in their submission.
The following table provides the topic and dates of each application, ADAMS accession number(s), and location in the application of HDI's proposed NSHC determination for each of the license amendment requests that support resumption of commercial power operation at PNP. For further details with respect to these license amendment applications, see the applications for amendment, publicly available portions of which are available for public inspection in ADAMS. For additional direction on accessing information related to these documents, see the "Obtaining Information and Submitting Comments" section of this document.
[top]
Request to Revise Operating License and Technical Specifications to Support Resumption of Power Operations | |
Application Date | December 14, 2023. |
Supplement Date | July 9, 2024. |
ADAMS Accession Nos | ML23348A148 and ML24191A422. |
Location in Application of NSHC | Pages 91-94 of the Enclosure. |
Brief Description of Amendment | The proposed amendments would revise the renewed facility operating license, including the permanently defueled technical specifications and the environmental protection plan, to support the resumption of power operations at PNP. |
Proposed Determination | NSHC. |
Name of Attorney for Licensee, Mailing Address | Jason Day, General Counsel, Holtec Decommissioning International, LLC, 1 Holtec Boulevard, Camden, NJ 08104. |
NRC Project Manager, Telephone Number | Marlayna Doell, 301-415-3178. |
Request to Revise the Administrative Technical Specifications to Support Resumption of Power Operations | |
Application Date | February 9, 2024. |
Supplement Date | July 31, 2024. |
ADAMS Accession Nos | ML24040A089 and ML24213A082. |
Location in Application of NSHC | Pages 19-21 of the Enclosure. |
Brief Description of Amendment | The proposed amendment would revise selected sections of the permanently defueled technical specifications to support the resumption of power operations at PNP. |
Proposed Determination | NSHC. |
Name of Attorney for Licensee, Mailing Address | Jason Day, General Counsel, Holtec Decommissioning International, LLC, 1 Holtec Boulevard, Camden, NJ 08104. |
NRC Project Manager, Telephone Number | Marlayna Doell, 301-415-3178. |
Request to Revise the Palisades Emergency Plan to Support Resumption of Power Operations | |
Application Date | May 1, 2024. |
Supplement Date | July 24, 2024. |
ADAMS Accession No | ML24122C666 and ML24206A187. |
Location in Application of NSHC | Pages 28-29 of the Enclosure. |
Brief Description of Amendment | The proposed amendment would revise the PNP Site Emergency Plan and emergency classification scheme to support the resumption of power operations at PNP. |
Proposed Determination | NSHC. |
Name of Attorney for Licensee, Mailing Address | Jason Day, General Counsel, Holtec Decommissioning International, LLC, 1 Holtec Boulevard, Camden, NJ 08104. |
NRC Project Manager, Telephone Number | Justin Poole, 301-415-2048. |
Request to Update the Main Steam Line Break Analysis Methodology for Palisades | |
Application Date | May 24, 2024. |
ADAMS Accession No | ML24145A145. |
Location in Application of NSHC | Pages 6-8 of the Enclosure. |
Brief Description of Amendment | The proposed amendment would allow the use of the Framatome Inc. Topical Report EMF-2310, Revision 1, Supplement 2P-A, Revision 0, "SRP Chapter 15 Non-LOCA Methodology for Pressurized Water Reactors," for application of the Biasi Critical Heat Flux correlation in the Post-Scram Main Steam Line Break (MSLB) Analysis at PNP, which supports the resumption of power operations at PNP. |
Proposed Determination | NSHC. |
Name of Attorney for Licensee, Mailing Address | Jason Day, General Counsel, Holtec Decommissioning International, LLC, 1 Holtec Boulevard, Camden, NJ 08104. |
NRC Project Manager, Telephone Number | Justin Poole, 301-415-2048. |
Order Imposing Procedures for Access to Sensitive Unclassified Non-Safeguards Information and Safeguards Information for Contention Preparation
A. This Order contains instructions regarding how potential parties to this proceeding may request access to documents containing SUNSI and SGI. Requirements for access to SGI are primarily set forth in 10 CFR parts 2 and 73. Nothing in this Order is intended to conflict with the SGI regulations.
B. Within 10 days after publication of this notice of opportunity for hearing, any potential party who believes access to SUNSI and/or SGI is necessary to respond to this notice may request such access. A "potential party" is any person who intends to participate as a party by demonstrating standing and filing an admissible contention under 10 CFR 2.309. Requests for access to SUNSI and/or SGI submitted later than 10 days after publication will not be considered absent a showing of good cause for the late filing, addressing why the request could not have been filed earlier.
C. The requestor shall submit a letter requesting permission to access SUNSI, SGI, or both to the Office of the Secretary, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001, Attention: Rulemakings and Adjudications Staff, and provide a copy to the Deputy General Counsel for Licensing, Hearings, and Enforcement, Office of the General Counsel, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001. The expedited delivery or courier mail address for both offices is: U.S. Nuclear Regulatory Commission, 11555 Rockville Pike, Rockville, Maryland 20852. The email addresses for the Office of the Secretary and the Office of the General Counsel are Hearing.Docket@nrc.gov and RidsOgcMailCenter.Resource@nrc.gov, respectively. 1 The request must include the following information:
Footnotes:
1 ?While a request for hearing or petition to intervene in this proceeding must comply with the filing requirements of the NRC's "E-Filing Rule," the initial request to access SUNSI and/or SGI under these procedures should be submitted as described in this paragraph.
(1) A description of the licensing action with a citation to this Federal Register notice.
(2) The name and address of the potential party and a description of the potential party's particularized interest that could be harmed by the action identified in C.(1).
(3) If the request is for SUNSI, the identity of the individual or entity requesting access to SUNSI and the requestor's basis for the need for the information in order to meaningfully participate in this adjudicatory proceeding. In particular, the request must explain why publicly available versions of the information requested would not be sufficient to provide the basis and specificity for a proffered contention.
(4) If the request is for SGI, the identity of each individual who would have access to SGI if the request is granted, including the identity of any expert, consultant, or assistant who will aid the requestor in evaluating the SGI. In addition, the request must contain the following information:
(a) A statement that explains each individual's "need to know" the SGI, as required by 10 CFR 73.2 and 10 CFR 73.22(b)(1). Consistent with the definition of "need to know" as stated in 10 CFR 73.2, the statement must explain:
(i) Specifically, why the requestor believes that the information is necessary to enable the requestor to proffer and/or adjudicate a specific contention in this proceeding;? 2 and
Footnotes:
2 ?Broad SGI requests under these procedures are unlikely to meet the standard for need to know; furthermore, NRC staff redaction of information from requested documents before their release may be appropriate to comport with this requirement. These procedures do not authorize unrestricted disclosure or less scrutiny of a requestor's need to know than ordinarily would be applied in connection with an already-admitted contention or non-adjudicatory access to SGI.
[top] (ii) The technical competence (demonstrable knowledge, skill, training or education) of the requestor to effectively utilize the requested SGI to provide the basis and specificity for a proffered contention. The technical competence of a potential party or its counsel may be shown by reliance on a
(b) A completed Form SF-85, "Questionnaire for Non-Sensitive Positions," for each individual who would have access to SGI. The completed Form SF-85 will be used by the Office of Administration to conduct the background check required for access to SGI, as required by 10 CFR part 2, subpart C, and 10 CFR 73.22(b)(2), to determine the requestor's trustworthiness and reliability. For security reasons, Form SF-85 can only be submitted electronically through the National Background Investigation Services e-App system, a secure website that is owned and operated by the Defense Counterintelligence and Security Agency (DCSA). To obtain online access to the form, the requestor should contact the NRC's Office of Administration at 301-415-3710. 3
Footnotes:
3 ?The requestor will be asked to provide the requestor's full name, social security number, date and place of birth, telephone number, and email address. After providing this information, the requestor usually should be able to obtain access to the online form within one business day.
(c) A completed Form FD-258 (fingerprint card), signed in original ink, and submitted in accordance with 10 CFR 73.57(d). Copies of Form FD-258 will be provided in the background check request package supplied by the Office of Administration for each individual for whom a background check is being requested. The fingerprint card will be used to satisfy the requirements of 10 CFR part 2, subpart C, 10 CFR 73.22(b)(1), and Section 149 of the Atomic Energy Act of 1954, as amended, which mandates that all persons with access to SGI must be fingerprinted for a Federal Bureau of Investigation identification and criminal history records check.
(d) A check or money order payable in the amount of $310.00? 4 to the U.S. Nuclear Regulatory Commission for each individual for whom the request for access has been submitted, and
Footnotes:
4 ?This fee is subject to change pursuant to the DCSA's adjustable billing rates.
(e) If the requestor or any individual(s) who will have access to SGI believes they belong to one or more of the categories of individuals in 10 CFR 73.59 that are exempt from the criminal history records check and background check requirements, the requestor should also provide a statement identifying which exemption the requestor is invoking and explaining the requestor's basis for believing that the exemption applies. While processing the request, the Office of Administration, Personnel Security Branch, will make a final determination whether the claimed exemption applies. Alternatively, the requestor may contact the Office of Administration for an evaluation of their exemption status prior to submitting their request. Persons who are exempt from the background check are not required to complete the SF-85 or Form FD-258; however, all other requirements for access to SGI, including the need to know, are still applicable.
Note:
Copies of documents and materials required by paragraphs C.(4)(b), (c), and (d) of this Order must be sent to the following address: U.S. Nuclear Regulatory Commission, Office of Administration, ATTN: Personnel Security Branch, Mail Stop: TWFN-07D04M, 11555 Rockville Pike, Rockville, MD 20852.
These documents and materials should not be included with the request letter to the Office of the Secretary, but the request letter should state that the forms and fees have been submitted as required.
D. To avoid delays in processing requests for access to SGI, the requestor should review all submitted materials for completeness and accuracy (including legibility) before submitting them to the NRC. The NRC will return incomplete packages to the sender without processing.
E. Based on an evaluation of the information submitted under paragraphs C.(3) or C.(4), as applicable, the NRC staff will determine within 10 days of receipt of the request whether:
(1) There is a reasonable basis to believe the petitioner is likely to establish standing to participate in this NRC proceeding; and
(2) The requestor has established a legitimate need for access to SUNSI and/or a need to know the SGI requested.
F. For requests for access to SUNSI, if the NRC staff determines that the requestor has satisfied both E.(1) and E.(2), the NRC staff will notify the requestor in writing that access to SUNSI has been granted. The written notification will contain instructions on how the requestor may obtain copies of the requested documents, and any other conditions that may apply to access to those documents. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order? 5 setting forth terms and conditions to prevent the unauthorized or inadvertent disclosure of SUNSI by each individual who will be granted access to SUNSI.
Footnotes:
5 ?Any motion for Protective Order or draft Non-Disclosure Affidavit or Agreement for SUNSI must be filed with the presiding officer, or the Chief Administrative Judge if the presiding officer has not yet been designated, within 30 days of the deadline for the receipt of the written access request.
G. For requests for access to SGI, if the NRC staff determines that the requestor has satisfied both E.(1) and E.(2), the Office of Administration will then determine, based upon completion of the background check, whether the proposed recipient is trustworthy and reliable, as required for access to SGI by 10 CFR 73.22(b). If the Office of Administration determines that the individual or individuals are trustworthy and reliable, the NRC will promptly notify the requestor in writing. The notification will provide the names of approved individuals as well as the conditions under which the SGI will be provided. These conditions may include, but are not limited to, the signing of a Non-Disclosure Agreement or Affidavit, or Protective Order? 6 by each individual who will be granted access to SGI.
Footnotes:
6 ?Any motion for Protective Order or draft Non- Disclosure Agreement or Affidavit for SGI must be filed with the presiding officer, or the Chief Administrative Judge if the presiding officer has not yet been designated, within 180 days of the deadline for the receipt of the written access request.
H. Release and Storage of SGI. Prior to providing SGI to the requestor, the NRC staff will conduct (as necessary) an inspection to confirm that the recipient's information protection system is sufficient to satisfy the requirements of 10 CFR 73.22. Alternatively, recipients may opt to view SGI at an approved SGI storage location rather than establish their own SGI protection program to meet SGI protection requirements.
I. Filing of Contentions. Any contentions in these proceedings that are based upon the information received as a result of the request made for SUNSI and/or SGI must be filed by the requestor no later than 25 days after receipt of (or access to) that information. However, if more than 25 days remain between the petitioner's receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of opportunity for hearing), the petitioner may file its SUNSI and/or SGI contentions by that later deadline.
J. Review of Denials of Access.
[top] (1) If the request for access to SUNSI and/or SGI is denied by the NRC staff either after a determination on standing and requisite need, or after a determination on trustworthiness and reliability, the NRC staff shall immediately notify the requestor in writing, briefly stating the reason or reasons for the denial.
(2) Before the Office of Administration makes a final adverse determination regarding the trustworthiness and reliability of the proposed recipient(s) for access to SGI, the Office of Administration, in accordance with 10 CFR 2.336(f)(1)(iii), must provide the proposed recipient(s) any records that were considered in the trustworthiness and reliability determination, including those required to be provided under 10 CFR 73.57(e)(1), so that the proposed recipient(s) have an opportunity to correct or explain the record.
(3) The requestor may challenge the NRC staff's adverse determination regarding access to SUNSI or with respect to standing or need to know for SGI by filing a challenge within 5 days of receipt of that determination with: (a) the presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if this individual is unavailable, another administrative judge or an Administrative Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer.
(4) The requestor may challenge the Office of Administration's final adverse determination with respect to trustworthiness and reliability for access to SGI by filing a request for review in accordance with 10 CFR 2.336(f)(1)(iv).
(5) Further appeals of decisions under this paragraph must be made pursuant to 10 CFR 2.311.
K. Review of Grants of Access. A party other than the requestor may challenge an NRC staff determination granting access to SUNSI whose release would harm that party's interest independent of the proceeding. Such a challenge must be filed within 5 days of the notification by the NRC staff of its grant of access and must be filed with: (a) the presiding officer designated in this proceeding; (b) if no presiding officer has been appointed, the Chief Administrative Judge, or if this individual is unavailable, another administrative judge or an Administrative Law Judge with jurisdiction pursuant to 10 CFR 2.318(a); or (c) if another officer has been designated to rule on information access issues, with that officer.
If challenges to the NRC staff determinations are filed, these procedures give way to the normal process for litigating disputes concerning access to information. The availability of interlocutory review by the Commission of orders ruling on such NRC staff determinations (whether granting or denying access) is governed by 10 CFR 2.311. 7
Footnotes:
7 ?Requestors should note that the filing requirements of the NRC's E-Filing Rule (72 FR 49139; August 28, 2007, as amended at 77 FR 46562, August 3, 2012) apply to appeals of NRC staff determinations (because they must be served on a presiding officer or the Commission, as applicable), but not to the initial SUNSI and/or SGI request submitted to the NRC staff under these procedures.
L. The Commission expects that the NRC staff and presiding officers (and any other reviewing officers) will consider and resolve requests for access to SUNSI and/or SGI, and motions for protective orders, in a timely fashion in order to minimize any unnecessary delays in identifying those petitioners who have standing and who have propounded contentions meeting the specificity and basis requirements in 10 CFR part 2. The attachment to this Order summarizes the general target schedule for processing and resolving requests under these procedures.
It is so ordered .
Dated: August 1, 2024.
For the Nuclear Regulatory Commission.
Carrie Safford,
Secretary of the Commission.
[top]
Day | Event/activity |
---|---|
0 | Publication of Federal Register notice of opportunity for hearing, including order with instructions for access requests. |
10 | Deadline for submitting requests for access to Sensitive Unclassified Non-Safeguards Information (SUNSI) and/or Safeguards Information (SGI). SUNSI requests should include information: (i) supporting the standing of a potential party identified by name and address and (ii) describing the requestor's need for the information in order for the potential party to participate meaningfully in an adjudicatory proceeding. SGI requests should include information: (i) supporting the standing of a potential party identified by name and address; (ii) describing why the information is necessary to enable the requestor to proffer and/or adjudicate a specific contention in the adjudicatory proceeding; (iii) demonstrating technical competence of the requestor to use the SGI to provide the basis and specificity for a proffered contention; and (iv) including the application and fee for the fingerprint/background check. |
60 | Deadline for submitting petition for intervention containing: (i) demonstration of standing and (ii) all contentions whose formulation does not require access to SUNSI and/or SGI (+25 Answers to petition for intervention; +7 requestor/petitioner reply). |
20 | U.S. Nuclear Regulatory Commission (NRC) staff informs the requestor of the staff's determination whether the request for access provides a reasonable basis to believe standing can be established and shows (1) need for SUNSI and/or (2) need to know SGI. (For SUNSI, NRC staff also informs any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information.) If NRC staff makes the finding of need for SUNSI and likelihood of standing, NRC staff begins document processing (preparation of redactions or review of redacted documents). If NRC staff makes the finding of need to know for SGI and likelihood of standing, NRC staff begins background check (including fingerprinting for a criminal history records check), information processing (preparation of redactions or review of redacted documents), and readiness inspections. |
25 | If NRC staff finds no "need" for SUNSI and/or no "need to know" for SGI, or no likelihood of standing, the deadline for requestor/petitioner to file a motion seeking a ruling to reverse the NRC staff's denial of access; NRC staff files copy of access determination with the presiding officer (or Chief Administrative Judge or other designated officer, as appropriate). If NRC staff finds "need" for SUNSI, the deadline for any party to the proceeding whose interest independent of the proceeding would be harmed by the release of the information to file a motion seeking a ruling to reverse the NRC staff's grant of access. |
30 | Deadline for NRC staff reply to motions to reverse NRC staff determination(s). |
40 | (Receipt +30) If NRC staff finds standing and need for SUNSI, deadline for NRC staff to complete information processing and file motion for Protective Order and draft Non-Disclosure Agreement or Affidavit. Deadline for applicant/licensee to file Non-Disclosure Agreement or Affidavit for SUNSI. |
190 | (Receipt +180) If NRC staff finds standing, need to know for SGI, and trustworthiness and reliability, deadline for NRC staff to file motion for Protective Order and draft Non-Disclosure Agreement or Affidavit (or to make a determination that the proposed recipient of SGI is not trustworthy or reliable). Note: Before the Office of Administration makes a final adverse determination regarding access to SGI, the proposed recipient must be provided an opportunity to correct or explain information. |
205 | Deadline for petitioner to seek reversal of a final adverse NRC staff trustworthiness or reliability determination under 10 CFR 2.336(f)(1)(iv). |
A | If access granted: issuance of presiding officer or other designated officer decision on motion for protective order for access to sensitive information (including schedule for providing access and submission of contentions) or decision reversing a final adverse determination by the NRC staff. |
A + 3 | Deadline for filing executed Non-Disclosure Agreements or Affidavits. Access provided to SUNSI and/or SGI consistent with decision issuing the protective order. |
A + 28 | Deadline for submission of contentions whose development depends upon access to SUNSI and/or SGI. However, if more than 25 days remain between the petitioner's receipt of (or access to) the information and the deadline for filing all other contentions (as established in the notice of opportunity for hearing), the petitioner may file its SUNSI and/or SGI contentions by that later deadline. |
A + 53 | (Contention receipt +25) Answers to contentions whose development depends upon access to SUNSI and/or SGI. |
A + 60 | (Answer receipt +7) Petitioner/Intervenor reply to answers. |
>A + 60 | Decision on contention admission. |
[FR Doc. 2024-17359 Filed 8-6-24; 8:45 am]