86 FR 232 pgs. 69352-69359 - Notice of Funding Opportunity for the Federal-State Partnership for State of Good Repair Program
Type: NOTICEVolume: 86Number: 232Pages: 69352 - 69359
Pages: 69352, 69353, 69354, 69355, 69356, 69357, 69358, 69359FR document: [FR Doc. 2021-26457 Filed 12-6-21; 8:45 am]
Agency: Transportation Department
Sub Agency: Federal Railroad Administration
Official PDF Version: PDF Version
[top]
DEPARTMENT OF TRANSPORTATION
Federal Railroad Administration
Notice of Funding Opportunity for the Federal-State Partnership for State of Good Repair Program
AGENCY:
Federal Railroad Administration (FRA), Department of Transportation (DOT).
ACTION:
Notice of Funding Opportunity (NOFO or notice).
SUMMARY:
This notice details the application requirements and procedures to obtain grant funding for eligible projects under the Federal-State Partnership for State of Good Repair Program (Partnership Program). This notice solicits applications for Partnership Program funds made available by the Consolidated Appropriations Act, 2021. The opportunity described in this notice is made available under Assistance Listings Number 20.326, "Federal-State Partnership for State of Good Repair."
DATES:
Applications for funding under this solicitation are due no later than 5:00 p.m. ET, March 7, 2022. Late or incomplete applications will not be considered for funding. See Section D of this notice for additional information on the application process.
ADDRESSES:
Applications must be submitted via www.Grants.gov. Only applicants who comply with all submission requirements described in this notice and submit applications through www.Grants.gov will be eligible for award. For any supporting application materials that an applicant is unable to submit via www.Grants.gov (such as oversized engineering drawings), an applicant may submit an original and two (2) copies to Mr. Bryan Rodda, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38-203, Washington, DC 20590. However, due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, applicants are advised to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline.
FOR FURTHER INFORMATION CONTACT:
For further information related to this notice, please contact Mr. Bryan Rodda, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38-203, Washington, DC 20590; email: Bryan.Rodda@dot.gov; phone: 202-493-0443.
SUPPLEMENTARY INFORMATION:
Notice to applicants: FRA recommends that applicants read this notice in its entirety prior to preparing application materials. Definitions of key terms used throughout the NOFO are provided in Section A(2) below. These key terms are capitalized throughout the NOFO. There are several administrative and specific eligibility requirements described herein with which applicants must comply. Additionally, applicants should note that the required Project Narrative component of the application package may not exceed 25 pages in length.
Table of Contents
A. Program Description
B. Federal Award Information
C. Eligibility Information
D. Application and Submission Information
E. Application Review Information
F. Federal Award Administration Information
G. Federal Awarding Agency Contacts
H. Other Information
A. Program Description
1. Overview
Our nation's rail network is a critical component of the U.S. transportation system and economy. Prior to the coronavirus disease 2019 (COVID-19) pandemic, rail carried over 32.5 million passengers on Amtrak services and approximately 1.6 billion tons of freight valued at over $600 billion each year. The Partnership Program provides a Federal funding opportunity to improve American passenger rail infrastructure to enhance rail safety, reduce the backlog of deferred maintenance for Amtrak or publicly owned or controlled railroad assets, create new opportunities for underserved communities, and invest in projects that support and spur economic growth.
The purpose of the Partnership Program is to fund projects within the United States to repair, replace, or rehabilitate Qualified Railroad Assets to reduce the state of good repair backlog and improve Intercity Passenger Rail performance. Section E of this NOFO provides additional information on these program priorities.
[top] The Partnership Program is authorized in Sections 11103 and 11302 of the Passenger Rail Reform and Investment Act of 2015 (Title XI of the Fixing America's Surface Transportation (FAST) Act, Public Law 114-94 (2015)); codified at 49 U.S.C. 24911, and this NOFO is funded by the Consolidated Appropriations Act, 2021 (Public Law 116-260) (Appropriations Act). 1 The opportunity described in this notice is made available under Assistance
Footnotes:
1 ?Funds made available under this NOFO are subject to 49 U.S.C. 24911 as it existed on the day of the enactment of the Appropriations Act.
Consistent with Biden-Harris Administration priorities, the Department seeks to fund projects under the Partnership Program that address climate change impacts and environmental justice. Projects should include components that reduce emissions, promote energy efficiency, increase resilience, and recycle or redevelop existing infrastructure. This objective is consistent with Executive Order 14008, Tackling the Climate Crisis at Home and Abroad (86 FR 7619). As part of the Department's implementation of that Executive Order, the Department encourages the submission of applications that would direct resources and benefits towards low-income communities, overburdened communities, or communities underserved by affordable transportation.
The Department also seeks to use the Partnership Program to encourage racial equity by investing in projects that proactively address racial equity and barriers to opportunity. Projects should include components that improve or expand transportation options and mitigate the safety risks and detrimental quality of life effects that rail lines can have on communities, particularly low-income areas, and communities of color. This objective supports the Department's strategic goal related to infrastructure, with the potential for significantly enhancing environmental stewardship and community partnerships, and reflects Executive Order 13985, Advancing Racial Equity and Support for Underserved Communities Through the Federal Government (86 FR 7009). Section E describes the climate change, environmental justice, and racial equity considerations further.
The Partnership Program is intended to benefit both railroad assets in the Northeast Corridor ("NEC") and public or Amtrak-owned or controlled infrastructure, equipment, and facilities located in other areas of the country. Applicants should note that the Partnership Program has distinct eligibility requirements based on project location. In addition to the generally applicable requirements, applicants proposing NEC Projects should specifically review the NEC-specific requirements provided in Section C(3) (b), and the Qualified Railroad Asset information provided in Section D(2) (a)(vi) while applicants proposing Non-NEC Projects should review the Qualified Railroad Asset information provided in Section D(2) (a)(v).
2. Changes From FY 2020 Partnership Program NOFO
This notice updates the FY 2020 Partnership Program NOFO to reflect the Biden-Harris Administration's priorities for creating good-paying jobs, improving safety, applying transformative technology, and explicitly addressing climate change and racial equity as discussed in Section E(1)(c)(ii).
This notice expands the definition of Capital Project, making expenses incidental to the acquisition or construction (including designing, engineering, location surveying, mapping, environmental studies, and acquiring rights-of-way) of a Capital Project eligible for funding independently or in conjunction with proposed funding for construction or acquisition, as directed by the Appropriations Act.
3. Definitions of Key Terms
Terms defined in this section are capitalized throughout this notice.
a. "Benefit-Cost Analysis" (or "Cost-Benefit Analysis") is a systematic, data-driven, and transparent analysis comparing monetized project benefits and costs, using a no-build baseline and properly discounted present values, including concise documentation of the assumptions and methodology used to produce the analysis, a description of the baseline, data sources used to project outcomes, values of key input parameters, basis of modeling (including spreadsheets, technical memos, etc.), and presentation of the calculations in sufficient detail and transparency to allow the analysis to be reproduced and sensitivity of results evaluated by FRA. Please refer to the Benefit-Cost Analysis (BCA) Guidance for Discretionary Grant Programs prior to preparing a BCA at https://www.transportation.gov/office-policy/transportation-policy/benefit-cost-analysis-guidance. In addition, please also refer to the BCA FAQs on FRA's website for rail-specific examples of how to apply the BCA Guidance for Discretionary Grant Programs to Partnership Program applications.
b. "Capital Project" means a project primarily intended to replace, rehabilitate, or repair major infrastructure assets utilized for providing Intercity Passenger Rail service, including tunnels, bridges, stations, and other assets, as determined by the Secretary of Transportation; a project primarily intended to improve Intercity Passenger Rail performance, including reduced trip times, increased train frequencies, and higher operating speeds, and other improvements, as determined by the Secretary; and a project for expenses incidental to the acquisition or construction (including designing, engineering, location surveying, mapping, environmental studies, and acquiring rights-of-way) of a project, consistent with 49 U.S.C. 24911(a)(2) and the Appropriations Act.
c. "Construction" means the production of fixed works and structures or substantial alterations to such structures or land and associated costs.
d. "Commuter Rail Passenger Transportation" means short-haul rail passenger transportation in metropolitan and suburban areas usually having reduced fare, multiple ride, and commuter tickets and morning and evening peak period operations, consistent with 49 U.S.C. 24102(3).
e. "Final Design (FD)" means design activities following Preliminary Engineering, and at a minimum, includes the preparation of final Construction plans, detailed specifications, and estimates sufficiently detailed to inform project stakeholders (designers, reviewers, contractors, suppliers, etc.) of the actions required to advance the project from design through completion of Construction.
f. "Intercity Rail Passenger Transportation" means rail passenger transportation, except Commuter Rail Passenger Transportation, consistent with 49 U.S.C. 24911(a)(3). In this notice, "Intercity Passenger Rail" is an equivalent term to "Intercity Rail Passenger Transportation."
g. "Major Capital Project" means a Capital Project with an estimated total project cost of $300 million or more.
[top] h. "National Environmental Policy Act (NEPA)" is a Federal law that requires Federal agencies to analyze and document the environmental impacts of a proposed action in consultation with appropriate Federal, state, and local authorities, and with the public. NEPA classes of action include an Environmental Impact Statement (EIS), Environmental Analysis (EA) or Categorical Exclusion (CE). The NEPA class of action depends on the nature of the proposed action, its complexity, and the potential impacts. For purposes of this NOFO, NEPA also includes all related Federal laws and regulations including the Clean Air Act, Section 4(f) of the Department of Transportation Act, Section 7 of the Endangered Species Act, and Section 106 of the National Historic Preservation Act. Additional information regarding FRA's environmental processes and requirements are located at https://www.fra.dot.gov/environment.
i. "NEC Project" means a Capital Project where the Qualified Railroad Assets involved in the project are part of, or in primary use for, the Northeast Corridor ("NEC").
j. "Non-NEC Project" means a Capital Project where the Qualified Railroad Assets involved in the project are not part of, or are not in primary use for, the Northeast Corridor ("NEC").
k. "Northeast Corridor" ("NEC") means the main rail line between Boston, Massachusetts, and the District of Columbia; the branch rail lines connecting to Harrisburg, Pennsylvania, Springfield, Massachusetts, and Spuyten Duyvil, New York; and facilities and services used to operate and maintain these lines, consistent with 49 U.S.C. 24911(a)(4).
l. "Preliminary Engineering (PE)" means engineering design to: (1) Define a project, including identification of all environmental impacts, design of all critical project elements at a level sufficient to assure reliable cost estimates and schedules, (2) complete project management and financial plans, and (3) identify procurement requirements and strategies. The PE development process starts with specific project design alternatives that allow for the assessment of a range of rail improvements, specific alignments, and project designs. PE generally occurs concurrently with NEPA and related analyses, and prior to FD and Construction.
m. A "Qualified Railroad Asset," consistent with 49 U.S.C. 24911(a)(5), means infrastructure, equipment, or a facility that:
i. Is owned or controlled by an eligible applicant;
ii. is contained in the planning document developed under 49 U.S.C. 24904 and for which a cost-allocation policy has been developed under 49 U.S.C. 24905(c), or is contained in an equivalent planning document and for which a similar cost-allocation policy has been developed; and
iii. was not in a State of Good Repair on the date of enactment of the Passenger Rail Reform and Investment Act of 2015 (December 4, 2015).
See Section D(2) (a), Project Narrative, for further details about the Qualified Railroad Asset requirements and application submission instructions related to Qualified Railroad Assets. 2
Footnotes:
2 ?For any project that includes purchasing intercity passenger rail equipment, applicants are encouraged to use a standardized approach to the procurement, such as the specifications developed by the Next Generation Corridor Equipment Pool Committee or a similarly uniform process.
n. "State of Good Repair" means a condition in which physical assets, both individually and as a system, are (A) performing at a level at least equal to that called for in their as-built or as-modified design specification during any period when the life cycle cost of maintaining the assets is lower than the cost of replacing them; and (B) sustained through regular maintenance and replacement programs, consistent with 49 U.S.C. 24102(12).
B. Federal Award Information
1. Available Award Amount
The total funding available for awards under this NOFO is $198,000,000 made available by the Appropriations Act. Should additional Partnership Program funds become available after the release of this NOFO, FRA may elect to award such additional funds to applications received under this NOFO. Any selection and award under this NOFO is subject to the availability of appropriated funds.
2. Award Size
There are no predetermined minimum or maximum dollar thresholds for awards. FRA anticipates making multiple awards with the available funding. Given the limited amount of funding currently available, FRA may not be able to award grants to all eligible applications even if they meet or exceed the stated evaluation criteria (see Section E, Application Review Information). Projects may require more funding than is available. FRA encourages applicants to propose a project that has operational independence or a component of such project and that can be completed and implemented with funding under this NOFO as a part of the total project cost together with other, non-Federal sources. (See Section C(3) (c) for more information.)
Applicants proposing a Major Capital Project may identify and describe project phases or elements that could be candidates for subsequent Partnership Program funding, if such funding becomes available. Applications for a Major Capital Project that would seek future funds beyond funding made available in this notice should indicate anticipated annual Federal funding requests from this program for the expected duration of the project. FRA may issue Letters of Intent to Partnership Program grant recipients proposing Major Capital Projects under 49 U.S.C. 24911(g); such Letters of Intent would serve to announce FRA's intention to obligate an amount from future available budget authority toward a grant recipient's future project phases or elements. A Letter of Intent is not an obligation of the Federal government and is subject to the availability of appropriations for Partnership Program grants and subject to Federal laws in force or enacted after the date of the Letter of Intent.
4. Award Type
FRA will make awards for projects selected under this notice through grant agreements and/or cooperative agreements. Grant agreements are used when FRA does not expect to have substantial Federal involvement in carrying out the funded activity. Cooperative agreements allow for substantial Federal involvement in carrying out the agreed upon investment, including technical assistance, review of interim work products, and increased program oversight. The term "grant" is used throughout this document and is intended to reference funding awarded through a grant agreement, as well as funding awarded through a cooperative agreement. The funding provided under this NOFO will be made available to grantees on a reimbursable basis. Applicants must certify that their expenditures are allowable, allocable, reasonable, and necessary to the approved project before seeking reimbursement from FRA. Additionally, the grantee is expected to expend matching funds at the required percentage concurrent with Federal funds throughout the life of the project. See an example of standard terms and conditions for FRA grant awards at: https://www.fra.dot.gov/eLib/Details/L19057. This template is subject to revision.
5. Concurrent Applications
DOT and FRA may be concurrently soliciting applications for transportation infrastructure projects for several financial assistance programs. Applicants may submit applications requesting funding for a particular project to one or more of these programs. In the application for funding under this NOFO, applicants must indicate the other program(s) to which they submitted or plan to submit an application for funding the entire project or certain project components, as well as highlight new or revised information in the application responsive to this NOFO that differs from the previously submitted application(s).
C. Eligibility Information
[top] This section of the notice explains applicant eligibility, cost sharing and matching requirements, project eligibility, and project component
1. Eligible Applicants
The following entities are eligible applicants for all projects permitted under this notice:
(1) A State (including the District of Columbia);
(2) a group of States;
(3) an Interstate Compact;
(4) a public agency or publicly chartered authority established by one or more States;? 3
Footnotes:
3 ?See Section D(2)(a)(iv) for supporting documentation required to demonstrate eligibility under this eligibility category.
(5) a political subdivision of a State;
(6) Amtrak, acting on its own behalf or under a cooperative agreement with one or more states; or
(7) any combination of the entities described in (1) through (6).
Applications must identify a lead applicant. The lead applicant serves as the primary point of contact for the application, and if selected, as the grantee of the Partnership Program grant award.
To submit a joint application, the lead applicant must identify the joint applicant(s) and include a signed statement from an authorized representative of each joint applicant entity that affirms the entity joins the application. See Section D(2) for further instructions about submitting a joint application.
An application submitted by Amtrak and one or more States, whether eligible under (1), (2) or (6) above, must identify the lead applicant and include a signed cooperative agreement between Amtrak and the state(s) consistent with 49 U.S.C. 24911(a)(1)(F). Selection preference will be provided for joint applications, as further discussed in Section E(1) (c). Applications may reference entities that are not eligible applicants ( e.g., private sector firms) in an application as a partner in project funding or implementation, but ineligible entities do not qualify as lead or joint applicants. FRA will provide selection preference only to joint applications submitted by multiple eligible applicants.
2. Cost Sharing or Matching
The Federal share of total costs for Partnership Program projects funded under this notice shall not exceed 80 percent. FRA will provide selection preference to applications where the proposed Federal share of total project costs is 50 percent or less. The estimated total cost of a project must be based on the best available information, including engineering studies, studies of economic feasibility, environmental analyses, and information on the expected use of equipment and/or facilities. Additionally, in preparing estimates of total project costs, applicants may use FRA's cost estimate guidance documentation, "Capital Cost Estimating: Guidance for Project Sponsors," which is available at: https://www.fra.dot.gov/Page/P0926.
The minimum 20 percent non-Federal share may be comprised of public sector ( e.g., State or local) or private sector funding. FRA will not consider any Federal financial assistance? 4 or any non-Federal funds already expended (or otherwise encumbered) toward the matching requirement, unless compliant with 2 CFR part 200. In-kind contributions, including the donation of services, materials, and equipment, may be credited as a project cost, in a uniform manner consistent with 2 CFR 200.306.
Footnotes:
4 ?See Section D(2)(a)(iii) for supporting information required to demonstrate eligibility of Federal funds for use as match.
If Amtrak is an applicant, Amtrak may use its ticket and other non-Federal revenues generated from its operations and other sources to satisfy the non-Federal share requirements. Applicants must identify the source(s) of their matching and other funds and must clearly and distinctly reflect these funds as part of the total project cost.
Before applying, applicants should carefully review the principles for cost sharing or matching in 2 CFR 200.306. See Section D(2)(a)(iii) for required application information on non-Federal match and Section E for further discussion of FRA's consideration of matching funds in the review and selection process. FRA will approve pre-award costs consistent with 2 CFR 200.458, as applicable. See Section D(6). Cost sharing or matching may be used only for authorized Federal award purposes.
3. Other
a. Project Eligibility
The following rail projects within the United States to replace or rehabilitate Qualified Railroad Assets and improve Intercity Passenger Rail performance are eligible for funding under 49 U.S.C. 24911, the Appropriations Act, and this NOFO:
(1) Capital Projects to replace existing assets in-kind;
(2) Capital Projects to replace existing assets with assets that increase capacity or provide a higher level of service;
(3) Capital Projects to ensure that service can be maintained while existing assets are brought to a State of Good Repair; and
(4) Capital Projects to bring existing assets into a State of Good Repair.
Qualified Railroad Assets, as further defined in Section A(2), are owned or controlled by an eligible applicant and may include: Infrastructure, including track, ballast, switches and interlockings, bridges, communication and signal systems, power systems, highway-rail grade crossings, and other railroad infrastructure and support systems used in intercity passenger rail service; stations, including station buildings, support systems, signage, and track and platform areas; equipment, including passenger cars, locomotives, and maintenance-of-way equipment; and facilities, including yards and terminal areas and maintenance shops.
i. Capital Projects, as further defined in Section A(2), may include PE, NEPA, Final Design, Construction, or expenses incidental to the acquisition or Construction of a Capital Project. Corridor or project-specific planning studies are not eligible. Pre-Construction activities are eligible for funding independently or in conjunction with proposed funding for construction.
Forms needed for the electronic application process are at www.Grants.gov.
b. Post-Selection Requirements
See Section F(2) of this notice for post-selection requirements.
4. Unique Entity Identifier and System for Award Management (SAM)
[top] To apply for funding through Grants.gov , applicants must be properly registered in SAM before submitting an application, provide a valid unique entity identifier in its application, and continue to maintain an active SAM registration all as described in detail below. Complete instructions on how to register and submit an application can be found at www.Grants.gov. Registering with Grants.gov is a one-time process; however, it can take up to several weeks for first-time registrants to receive confirmation and a user password. FRA recommends that applicants start the registration process as early as possible to prevent delays that may preclude submitting an application package by the application deadline. Applications will not be accepted after the due date. Delayed registration is not an acceptable justification for a late application.
FRA may not make a grant award to an applicant until the applicant has complied with all applicable Data Universal Numbering System (DUNS) and SAM requirements and if an applicant has not fully complied with the requirements by the time the Federal awarding agency is ready to make a Federal award, the Federal awarding agency may determine that the applicant is not qualified to receive a Federal award and use that determination as a basis for making a Federal award to another applicant. (Please note that if a Dun & Bradstreet DUNS number must be obtained or renewed, this may take a significant amount of time to complete). Late applications, including those that are the result of a failure to register or comply with Grants.gov applicant requirements in a timely manner, will not be considered. If an applicant has not fully complied with the requirements by the submission deadline, the application will not be considered. To submit an application through Grants.gov , applicants must:
a. Obtain a DUNS Number
A DUNS number is required for Grants.gov registration. The Office of Management and Budget requires that all businesses and nonprofit applicants for Federal funds include a DUNS number in their applications for a new award or renewal of an existing award. A DUNS number is a unique nine-digit sequence recognized as the universal standard for the government in identifying and keeping track of entities receiving Federal funds. The identifier is used for tracking purposes and to validate address and point of contact information for Federal assistance applicants, grantees, and subrecipients. The DUNS number will be used throughout the grant life cycle. Obtaining a DUNS number is a free, one-time activity. Applicants may obtain a DUNS number by calling 1-866-705-5711 or by applying online at http://www.dnb.com/us.
b. Register With the SAM at www.SAM.gov
All applicants for Federal financial assistance must maintain current registrations in the SAM database. An applicant must be registered in SAM to successfully register in Grants.gov . The SAM database is the repository for standard information about Federal financial assistance applicants, grantees, and subrecipients. Organizations that have previously submitted applications via Grants.gov are already registered with SAM, as it is a requirement for Grants.gov registration. Please note, however, that applicants must update or renew their SAM registration at least once per year to maintain an active status. Therefore, it is critical to check registration status well in advance of the application deadline. If an applicant is selected for an award, the applicant must maintain an active SAM registration with current information throughout the period of the award, including information on a grantee's immediate and highest level owner and subsidiaries, as well as on all predecessors that have been awarded a Federal contract or grant within the last three years, if applicable. Information about SAM registration procedures is available at www.sam.gov.
c. Create a Grants.gov Username and Password
Applicants must complete an Authorized Organization Representative (AOR) profile on www.Grants.gov and create a username and password. Applicants must use the organization's DUNS number to complete this step. Additional information about the registration process is available at: https://www.grants.gov/web/grants/applicants/organization-registration.html.
d. Acquire Authorization for Your AOR From the E-Business Point of Contact (E-Biz POC)
The E-Biz POC at the applicant's organization must respond to the registration email from Grants.gov and login at www.Grants.gov to authorize the applicant as the AOR. Please note there can be more than one AOR for an organization.
e. Submit an Application Addressing All Requirements Outlined in This NOFO
If an applicant experiences difficulty at any point during this process, please call the Grants.gov Customer Center Hotline at 1-800-518-4726, 24 hours a day, 7 days a week (closed on Federal holidays). For information and instructions on each of these processes, please see instructions at: http://www.grants.gov/web/grants/applicants/apply-for-grants.html.
5. Submission Dates and Times
Applicants must submit complete applications to www.Grants.gov no later than 5:00 p.m. ET, March 7, 2022. Applicants will receive a system-generated acknowledgement of receipt. FRA reviews www.Grants.gov information on dates/times of applications submitted to determine timeliness of submissions. Late applications will be neither reviewed nor considered. Delayed registration is not an acceptable reason for late submission. To apply for funding under this announcement, all applicants are expected to be registered as an organization with Grants.gov . Applicants are strongly encouraged to apply early to ensure all materials are received before this deadline.
To ensure a fair competition of limited discretionary funds, no late submissions will be reviewed for any reason, including: (1) Failure to complete the Grants.gov registration process before the deadline; (2) failure to follow Grants.gov instructions on how to register and apply as posted on its website; (3) failure to follow all the instructions in this NOFO; and (4) technical issues experienced with the applicant's computer or information technology environment.
6. Intergovernmental Review
Intergovernmental Review is required for this program. Applicants must contact their State Single Point of Contact to comply with their state's process under Executive Order 12372.
7. Funding Restrictions
Consistent with 2 CFR 200.458, as applicable, FRA will only approve pre-award costs if such costs are incurred pursuant to the negotiation and in anticipation of the grant agreement and if such costs are necessary for efficient and timely performance of the scope of work. Under 2 CFR 200.458, grant recipients must seek written approval from FRA for pre-award activities to be eligible for reimbursement under the grant. Activities initiated prior to the execution of a grant or without FRA's written approval may be ineligible for reimbursement or matching contribution. Cost sharing or matching may be used only for authorized Federal award purposes.
FRA is prohibited under 49 U.S.C. 22905(f)? 5 from providing Partnership Program grants for Commuter Rail Passenger Transportation. FRA's interpretation of this provision is informed by the language in 49 U.S.C. 24911, and specifically the definitions of capital project in 49 U.S.C. 24911(a)(2)(A) and (B). FRA's primary intent in funding Partnership Program projects is to make reasonable investments in Capital Projects for Intercity Rail Passenger Transportation. Such projects may be located on shared corridors where Commuter Rail Passenger Transportation and/or freight rail also benefit from the project.
Footnotes:
5 ?Under 49 U.S.C. 24911(i), Partnership grants are subject to the conditions in 49 U.S.C. 22905.
[top]
8. Other Submission Requirements
For any supporting application materials that an applicant cannot submit via Grants.gov , such as oversized engineering drawings, an applicant may submit an original and two (2) copies to Mr. Bryan Rodda, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38-203, Washington, DC 20590. However, due to delays caused by enhanced screening of mail delivered via the U.S. Postal Service, FRA advises applicants to use other means of conveyance (such as courier service) to assure timely receipt of materials before the application deadline. Additionally, if documents can be obtained online, explaining to FRA how to access files on a referenced website may also be sufficient.
Note:
Please use generally accepted formats such as .pdf, .doc, .docx, .xls, .xlsx and .ppt, when uploading attachments. While applicants may embed picture files, such as .jpg, .gif, and .bmp in document files, applicants should not submit attachments in these formats. Additionally, the following formats will not be accepted: .com, .bat, .exe, .vbs, .cfg, .dat, .db, .dbf, .dll, .ini, .log, .ora, .sys, and .zip.
D. Application Review Information
1. Criteria
a. Eligibility, Completeness, and Applicant Risk Review
FRA will first screen each application for applicant and project eligibility (eligibility requirements are outlined in Section C of this notice), completeness (application documentation and submission requirements are outlined in Section D of this notice), applicant risk and the 20 percent minimum non-Federal match in determining whether the application is eligible.
FRA will then consider applicant risk, including the applicant's past performance in developing and delivering similar projects and previous financial contributions, and if applicable, previous competitive grant technical evaluation ratings that the proposed project received under previous competitive grant programs administered by DOT.
b. Evaluation Criteria
FRA will evaluate all eligible and complete applications using the evaluation criteria outlined in this section to determine technical merit and project benefits.
i. Technical Merit: FRA will take into account-
(A) The degree to which the tasks and subtasks outlined in the SOW are appropriate to achieve the expected outcomes of the proposed project;
(B) The technical qualifications and demonstrated experience of key personnel proposed to lead and perform the technical efforts, and the qualifications of the primary and supporting organizations to fully and successfully execute the proposed project within the proposed timeframe and budget;
(C) The degree to which the proposed project's business plan considers potential private sector participation in the financing, construction, or operation of the proposed project;
(D) Whether the applicant has, or will have, the legal, financial, and technical capacity to carry out the project; satisfactory continuing control over the use of the equipment or facilities; and the capability and willingness to maintain the equipment or facilities;
(E) The applicant's past performance in developing and delivering similar projects, and previous financial contributions;
(F) Whether the project has completed necessary prerequisites and demonstrates strong project readiness; and
(G) Whether the project is consistent with planning guidance and documents set forth by the Secretary of Transportation or required by law.
ii. Project Benefits: FRA will take into account the benefit-cost analysis of the proposed project, including anticipated private and public benefits relative to the costs of the proposed project including-
(A) Effects on system and service performance;
(B) Effects on safety, competitiveness, reliability, trip or transit time, and resilience;
(C) Efficiencies from improved integration with other modes; and
(D) Ability to meet existing or anticipated demand.
c. Selection Criteria
In addition to the eligibility and completeness review and the evaluation criteria outlined in this section, FRA will apply the following selection criteria:
i. FRA will give preference to applications where:
(A) Amtrak is not the sole applicant;
(B) Applications were submitted jointly by multiple eligible applicants; and
(C) The proposed Federal share of total project costs is 50 percent or less.
ii. After applying the above preferences, FRA will take in account the following key DOT objectives:
(A) Safety. DOT will assess the project's ability to foster a safe transportation system for the movement of goods and people, consistent with the Department's strategic goal to reduce transportation-related fatalities and serious injuries across the transportation system. Such considerations will include, but are not limited to, the extent to which the project improves safety at highway-rail grade crossings, reduces incidences of rail-related trespassing, and upgrades infrastructure to achieve a higher level of safety.
(B) Equitable economic strength and improving core assets. DOT will assess the project's ability to contribute to economic progress stemming from infrastructure investment and associated creation of good jobs with fair wages, labor protections, and the opportunity to join a union. Such considerations will include, but are not limited to, the extent to which the project invests in vital infrastructure assets and provides opportunities for families to achieve economic security through rail industry employment.
(C) Ensuring investments meet racial equity and economic inclusion goals. DOT will assess the project's ability to encourage racial equity by investing in projects that proactively address racial equity and barriers to opportunities. Such considerations will include, but are not limited to, the extent to which the project improves or expands transportation options, mitigates the safety risks and detrimental quality of life effects that rail lines can have on communities, and expands workforce development and training opportunities to foster a more diverse rail industry.
(D) Resilience and addressing climate change. DOT will assess the project's ability to reduce the harmful effects of climate change and anticipate necessary improvements for preparedness. Such considerations will include, but are not limited to, the extent to which the project reduces emissions, promotes energy efficiency, increases resilience, and recycles or redevelops existing infrastructure.
(E) Transformation of our nation's transportation infrastructure. DOT will assess the project's ability to expand and improve the nation's rail network, which needs to balance new infrastructure for increased capacity with proper maintenance of aging assets. Such considerations will include, but are not limited to, the extent to which the project adds capacity to congested corridors, builds new connections or attracts new users to passenger rail, and ensures assets will be improved to a state of good repair.
[top] iii. For NEC Projects, FRA will consider the appropriate sequence and phasing of projects as contained in the
iv. In determining the allocation of program funds, FRA may also consider geographic diversity, diversity in the size of the systems receiving funding, and the applicant's receipt of other competitive awards.
2. Review and Selection Process
FRA will conduct a four-part application review process, as follows:
a. Screen applications for completeness, eligibility, and applicant risk and consider applicable past performance and previous financial contributions and technical evaluation ratings;
b. Evaluate eligible applications (completed by technical panels applying the evaluation criteria);
c. Review, apply selection criteria and recommend initial selection of projects for the FRA Administrator's review (completed by a non-career Senior Review Team, which includes senior leadership from the Office of the Secretary and FRA); and
d. Select recommended awards for the Secretary's review and approval (completed by the FRA Administrator.)
3. Reporting Matters Related to Integrity and Performance
Before making a Federal award with a total amount of Federal share greater than the simplified acquisition threshold of $250,000 (see 2 CFR 200.88 Simplified Acquisition Threshold), FRA will review and consider any information about the applicant that is in the designated integrity and performance system accessible through SAM (currently the Federal Awardee Performance and Integrity Information System (FAPIIS)). See 41 U.S.C. 2313.
An applicant, at its option, may review information in the designated integrity and performance systems accessible through SAM and comment on any information about itself that a Federal awarding agency previously entered and is currently in the designated integrity and performance system accessible through SAM.
FRA will consider any comments by the applicant, in addition to the other information, in making a judgment about the applicant's integrity, business ethics, and record of performance under Federal awards when completing the review of risk posed by applicants as described in 2 CFR 200.205.
E. Federal Award Administration Information
1. Federal Award Notice
FRA will announce applications selected for funding in a press release and on FRA's website after the application review period. This announcement is FRA's notification to successful and unsuccessful applicants alike. FRA will contact applicants with successful applications after announcement with information and instructions about the award process. This notification is not an authorization to begin proposed project activities. FRA requires satisfaction of applicable requirements by the applicant and a formal agreement signed by both the grantee and the FRA, including an approved scope, schedule, and budget, before obligating the grant. See an example of standard terms and conditions for FRA grant awards at https://railroads.fra.dot.gov/elibrary/award-administration-and-grant-conditions. This template is subject to revision.
2. Administrative and National Policy Requirements
In connection with any program or activity conducted with or benefiting from funds awarded under this notice, grantees of funds must comply with all applicable requirements of Federal law, including, without limitation, the Constitution of the United States; the conditions of performance, nondiscrimination requirements, and other assurances made applicable to the award of funds in accordance with regulations of DOT; and applicable Federal financial assistance and contracting principles promulgated by the Office of Management and Budget. In complying with these requirements, grantees, in particular, must ensure that no concession agreements are denied or other contracting decisions made on the basis of speech or other activities protected by the First Amendment. If DOT determines that a grantee has failed to comply with applicable Federal requirements, DOT may terminate the award of funds and disallow previously incurred costs, requiring the grantee to reimburse any expended award funds.
Examples of administrative and national policy requirements include: 2 CFR part 200; procurement standards at 2 CFR part 200 Subpart D-Procurement Standards; 2 CFR 1207.317 and 2 CFR 200.401; compliance with Federal civil rights laws and regulations; disadvantaged business enterprises requirements; debarment and suspension requirements; drug-free workplace requirements; FRA's and OMB's Assurances and Certifications; Americans with Disabilities Act; safety requirements; NEPA; environmental justice requirements; and compliance with 49 U.S.C. 24905(c)(2) for the duration of NEC Projects. Unless otherwise stated in statutory or legislative authority, or appropriations language, all financial assistance awards follow the Uniform Administrative Requirements, Cost Principles and Audit Requirements for Federal Awards at 2 CFR part 200 and 2 CFR part 1201.
Assistance under this NOFO is subject to the grant conditions in 49 U.S.C. 22905 including the Buy America requirements, protective arrangements that are equivalent to the protective arrangements established under section 504 of the Railroad Revitalization and Regulatory Reform Act of 1976 (45 U.S.C. 836) with respect to employees affected by actions taken in connection with the project to be financed in whole or in part by grants under this chapter, the provision deeming operators rail carriers and employers for certain purposes, and grantee agreements with railroad right-of-way owners for projects using railroad rights-of-way (see D.2.b.xi). More information about FRA's Buy America requirements is available at: https://railroads.dot.gov/legislation-regulations/buy-america/buy-america.
Grantees must comply with applicable appropriations act requirements and all relevant requirements of 2 CFR part 200. Rights to intangible property under grants awarded under this NOFO are governed in accordance with 2 CFR 200.315. See an example of standard terms and conditions for FRA grant awards at https://railroads.fra.dot.gov/elibrary/award-administration-and-grant-conditions. This template is subject to revision.
3. Reporting
a. Progress Reporting on Grant Activity
[top] Each applicant selected for a grant will be required to comply with all standard FRA reporting requirements, including quarterly progress reports, quarterly Federal financial reports, and interim and final performance reports, as well as all applicable auditing, monitoring and close out requirements. Reports may be submitted electronically. Pursuant to 2 CFR 170.210, non-Federal entities applying under this NOFO must have the necessary processes and systems in place to comply with the reporting requirements should they receive Federal funding.
b. Additional Reporting
Applicants selected for funding are required to comply with all reporting requirements in the standard terms and conditions for FRA grant awards including 2 CFR 180.335 and 2 CFR 180.350.
If the Federal share of any Federal award under this NOFO may include more than $500,000 over the period of performance, applicants are informed of the post award reporting requirements reflected in 2 CFR part 200, Appendix XII-Award Term and Condition for Recipient Integrity and Performance Matters.
c. Performance Reporting
Each applicant selected for funding must collect information and report on the project's performance using measures mutually agreed upon by FRA and the grantee to assess progress in achieving strategic goals and objectives. Examples of some rail performance measures are listed in the table below. The applicable measure(s) will depend upon the type of project. Applicants requesting funding for rolling stock must integrate at least one equipment/rolling stock performance measure, consistent with the grantee's application materials and program goals.
Performance measure | Rail measures | Unit measured | Temporal | Primary strategic goal | Secondary strategic goal | Description |
---|---|---|---|---|---|---|
Slow Order Miles | Miles | Annual | State of Good Repair | Safety | The number of miles per year within the project area that have temporary speed restrictions ("slow orders") imposed due to track condition. This is an indicator of the overall condition of track. This measure can be used for projects to rehabilitate sections of a rail line since the rehabilitation should eliminate, or at least reduce the slow orders upon project completion. | |
Rail Track Grade Separation | Count | Annual | Economic Competitiveness | Safety | The number of annual automobile crossings that are eliminated at an at-grade crossing as a result of a new grade separation. | |
Passenger Counts | Count | Annual | Economic Competitiveness | State of Good Repair | Count of the annual passenger boardings and alightings at stations within the project area. | |
Travel Time | Time/Trip | Annual | Economic Competitiveness | Quality of Life | Point-to-point travel times between pre-determined station stops within the project area. This measure demonstrates how track improvements and other upgrades improve operations on a rail line. It also helps make sure the railroad is maintaining the line after project completion. | |
Track Miles | Miles | One Time | State of Good Repair | Economic Competitiveness | The number of track miles that exist within the project area. This measure can be beneficial for projects building sidings or sections of additional main line track on a railroad. |
d. Federal Awarding Agency Contacts
For further information related to this notice, please contact Mr. Bryan Rodda, Office of Policy and Planning, Federal Railroad Administration, 1200 New Jersey Avenue SE, Room W38-203, Washington, DC 20590; email: Bryan.Rodda@dot.gov ; phone: 202-493-0443
e. Other Information
All information submitted as part of or in support of any application shall use publicly available data or data that can be made public and methodologies that are accepted by industry practice and standards, to the extent possible. If the application includes information the applicant considers to be a trade secret or confidential commercial or financial information, the applicant should do the following: (1) Note on the front cover that the submission "Contains Confidential Business Information (CBI)"; (2) mark each affected page "CBI"; and (3) highlight or otherwise denote the CBI portions.
The DOT regulations implementing the Freedom of Information Act (FOIA) are found at 49 CFR part 7 Subpart C-Availability of Reasonably Described Records under the Freedom of Information Act which sets forth rules for FRA to make requested materials, information, and records publicly available under FOIA. Unless prohibited by law and to the extent permitted under the FOIA, contents of application and proposals submitted by successful applicants may be released in response to FOIA requests. In addition, following the completion of the selection process and announcement of awards, FRA may publish a list of all applications received along with the names of the applicant organizations and funding amounts requested. Except for information withheld under the previous paragraph, FRA may also make application narratives publicly available or share application information within DOT or with other Federal agencies if FRA determines that sharing is relevant to the respective program's objectives.
Issued in Washington, DC.
Amitabha Bose,
Deputy Administrator.
[FR Doc. 2021-26457 Filed 12-6-21; 8:45 am]
BILLING CODE 4910-06-P