86 FR 6 pgs. 1954-1955 - Northern Natural Gas Company; Notice of Availability of the Environmental Assessment for the Proposed South Sioux City to Sioux Falls A-Line Replacement Project
Type: NOTICEVolume: 86Number: 6Pages: 1954 - 1955
Pages: 1954, 1955Docket number: [Docket No. CP20–487–000]
FR document: [FR Doc. 2021–00258 Filed 1–8–21; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. CP20-487-000]
Northern Natural Gas Company; Notice of Availability of the Environmental Assessment for the Proposed South Sioux City to Sioux Falls A-Line Replacement Project
The staff of the Federal Energy Regulatory Commission (FERC or Commission) has prepared an environmental assessment (EA) for the South Sioux City to Sioux Falls A-line Replacement Project, proposed by Northern Natural Gas Company (Northern) in the above-referenced docket. Northern requests authorization to abandon a portion of its existing pipeline in-place and to construct, operate, and maintain new natural gas facilities in Dakota and Dixon Counties, Nebraska, and Lincoln and Union Counties, South Dakota.
The EA assesses the potential environmental effects of the construction and operation of the South Sioux City to Sioux Falls A-line Replacement Project in accordance with the requirements of the National Environmental Policy Act (NEPA). The FERC staff concludes that approval of the proposed project, with appropriate mitigating measures, would not constitute a major federal action significantly affecting the quality of the human environment.
The U.S. Army Corps of Engineers participated as a cooperating agency in the preparation of the EA. Cooperating agencies have jurisdiction by law or special expertise with respect to resources potentially affected by the proposal and participate in the NEPA analysis.
The proposed Project includes the following:
• Construction of 82.2 miles of 12-inch-diameter pipeline in Nebraska and South Dakota (A-line);
• construction of 3.2 miles of 12-inch-diameter pipeline in South Dakota (SDM97701 Tie-Over);
• construction of 1.9 miles of 3-inch-diameter pipeline in Nebraska (Ponca Branch Line);
• abandonment in-place of 79.2 miles of 14- and 16-inch-diameter pipeline in Nebraska and South Dakota (A-line);
• abandonment in-place of 0.2 mile of 2-inch-diameter pipeline in Nebraska (Ponca Branch Line);
• abandonment in-place of 0.1 mile of 2-inch-diameter pipeline in Nebraska (Jackson Branch Line); and
• construction and modification of aboveground facilities, including valves, regulators, metering facilities, pig launchers and receivers, 1 an odorizer, and town border station sites.
Footnotes:
1 ?A pipeline "pig" is a device used to clean or inspect the pipeline. A pig launcher/receiver is an aboveground facility where pigs are inserted or retrieved from the pipeline.
The Commission mailed a copy of the Notice of Availability to federal, state, and local government representatives and agencies; elected officials; environmental and public interest groups; Native American tribes; potentially affected landowners and other interested individuals and groups; and newspapers and libraries in the project area. The EA is only available in electronic format. It may be viewed and downloaded from the FERC's website ( www.ferc.gov ), on the natural gas environmental documents page ( https://www.ferc.gov/industries-data/natural-gas/environment/environmental-documents ). In addition, the EA may be accessed by using the eLibrary link on the FERC's website. Click on the eLibrary link ( https://elibrary.ferc.gov/eLibrary/search ), select "General Search" and enter the docket number in the "Docket Number" field ( i.e. CP20-487). Be sure you have selected an appropriate date range. For assistance, please contact FERC Online Support at FercOnlineSupport@ferc.gov or toll free at (866) 208-3676, or for TTY, contact (202) 502-8659.
The EA is not a decision document. It presents Commission staff's independent analysis of the environmental issues for the Commission to consider when addressing the merits of all issues in this proceeding. Any person wishing to comment on the EA may do so. Your comments should focus on the EA's disclosure and discussion of potential environmental effects, reasonable alternatives, and measures to avoid or lessen environmental impacts. The more specific your comments, the more useful they will be. To ensure that the Commission has the opportunity to consider your comments prior to making its decision on this project, it is important that we receive your comments in Washington, DC on or before 5:00 p.m. Eastern Time on February 4, 2021.
For your convenience, there are three methods you can use to file your comments with the Commission. The Commission encourages electronic filing of comments and has staff available to assist you at (866) 208-3676 or FercOnlineSupport@ferc.gov. Please carefully follow these instructions so that your comments are properly recorded.
(1) You can file your comments electronically using the eComment feature on the Commission's website ( www.ferc.gov ) under the link to FERC Online. This is an easy method for submitting brief, text-only comments on a project;
(2) You can also file your comments electronically using the eFiling feature on the Commission's website ( www.ferc.gov ) under the link to FERC Online. With eFiling, you can provide comments in a variety of formats by attaching them as a file with your submission. New eFiling users must first create an account by clicking on "eRegister." You must select the type of filing you are making. If you are filing a comment on a particular project, please select "Comment on a Filing"; or
(3) You can file a paper copy of your comments by mailing them to the Commission. Be sure to reference the project docket number (CP20-487-000) on your letter. Submissions sent via the U.S. Postal Service must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Room 1A, Washington, DC 20426. Submissions sent via any other carrier must be addressed to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 12225 Wilkins Avenue, Rockville, Maryland 20852.
[top] Filing environmental comments will not give you intervenor status, but you do not need intervenor status to have your comments considered. Only
Additional information about the project is available from the Commission's Office of External Affairs, at (866) 208-FERC, or on the FERC website ( www.ferc.gov ) using the eLibrary link. The eLibrary link also provides access to the texts of all formal documents issued by the Commission, such as orders, notices, and rulemakings.
In addition, the Commission offers a free service called eSubscription which allows you to keep track of all formal issuances and submittals in specific dockets. This can reduce the amount of time you spend researching proceedings by automatically providing you with notification of these filings, document summaries, and direct links to the documents. Go to https://www.ferc.gov/ferc-online/overview to register for eSubscription.
Dated: January 5, 2021.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2021-00258 Filed 1-8-21; 8:45 am]
BILLING CODE 6717-01-P