85 FR 183 pgs. 59299-59300 - North American Electric Reliability Corporation; Notice of Staff Review of Enforcement Programs
Type: NOTICEVolume: 85Number: 183Pages: 59299 - 59300
Pages: 59299, 59300Docket number: [Docket No. RC11–6–010]
FR document: [FR Doc. 2020–20684 Filed 9–18–20; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Docket No. RC11-6-010]
North American Electric Reliability Corporation; Notice of Staff Review of Enforcement Programs
Commission staff coordinated with the staff of the North American Electric Reliability Corporation (NERC) to conduct the annual oversight of the Find, Fix, Track and Report (FFT) program, as outlined in the March 15, 2012 Order, 1 and the Compliance Exception (CE) Program, as proposed by NERC's September 18, 2015 annual Compliance Filing. 2 The Commission supported NERC's plan to coordinate with Commission staff to review the same sample of possible violations, thereby reducing the burden on the Regional Entities of providing evidence for two different samples. Furthermore, NERC and Commission staff agreed to exclude the Florida Reliability Coordinating Council Regional Entity (FRCC) from the survey, reducing the burden on FRCC as it continued toward a planned and approved termination of its responsibilities as a Regional Entity by June 30, 2019.
Footnotes:
1 ? North American Electric Reliability Corp., 138 FERC ¶?61,193, at P 73 (2012) (discussing Commission plans to survey a random sample of FFTs submitted each year to gather information on how the FFT program is working).
2 ? North American Electric Reliability Corp., Docket No. RC11-6-004, at 1 (Nov. 13, 2015) (delegated letter order) (stating "NERC's intention to combine the evaluation of Compliance Exceptions with the annual sampling of FFTs to further streamline oversight of the FFT and compliance exception programs").
Commission staff reviewed a sample of 24 FFT possible violations out of 102 FFT possible violations posted by NERC between October 2018 and September 2019 and a sample of 38 CE instances of noncompliance out of 957 CE instances of noncompliance posted by NERC between October 2018 and September 2019.
[top] Commission staff believes that the FFT and CE programs are meeting expectations, with one minor observation. Specifically, Commission staff identified one CE with an incomplete description of the noncompliance. Sampling for the 2019 program year indicated that the Regional Entities appropriately included all 62 of the sampled possible violations in the FFT and CE programs, and that all 62 of the sampled FFTs and CEs have been adequately remediated. Commission staff's sample analysis indicated a decreasing number of documentation concerns, particularly with regard to the clear identification of root cause in the FFT and/or CE postings. Specifically, the identification of root cause in FFTs and CEs has improved significantly over the past five years, moving from 5 percent missing an
Dated: September 14, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-20684 Filed 9-18-20; 8:45 am]
BILLING CODE 6717-01-P