85 FR 72 pgs. 20679-20680 - Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Type: NOTICEVolume: 85Number: 72Pages: 20679 - 20680
Pages: 20679, 20680Docket number: Project No. 9690-115; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC
FR document: [FR Doc. 2020-07811 Filed 4-13-20; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
Project No. 9690-115; Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, Eagle Creek Land Resources, LLC
Notice of Application Tendered for Filing With the Commission and Establishing Procedural Schedule for Licensing and Deadline for Submission of Final Amendments
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 9690-115.
c. Date Filed: March 31, 2020.
d. Applicant: Eagle Creek Hydro Power, LLC, Eagle Creek Water Resources, LLC, and Eagle Creek Land Resources, LLC (collectively referred to as Eagle Creek).
e. Name of Project: Rio Hydroelectric Project (Rio Project).
f. Location: The existing project is located on the Mongaup River in Sullivan and Orange Counties, New York. The project does not occupy federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Mr. Robert Gates, Senior Vice President-Regulatory, Eagle Creek Renewable Energy, LLC., 116 N State Street, P.O. Box 167, Neshkoro, WI 54960-0167; (973) 998-8400 or bob.gates@eaglecreekre.com .
i. FERC Contact: Nicholas Ettema at (312) 596-4447 or email at nicholas.ettema@ferc.gov.
j. This application is not ready for environmental analysis at this time.
[top] k. Project Description: The Rio Project consists of: (1) A reservoir with a gross storage capacity of 14,536 acre-feet and a surface area of 444 acres; (2) a 264-foot-long, gravity-type concrete spillway with a maximum height of 101 feet at a crest elevation of 810 feet National Geodetic Vertical Datum of 1929
l. A copy of the application is available for review on the Commission's website at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. At this time, the Commission has suspended access to the Commission's Public Reference Room due to the Proclamation on Declaring a National Emergency Concerning the Novel Coronavirus Disease (COVID-19) Outbreak, issued by the President on March 13, 2020. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY).
m. You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Procedural Schedule: The application will be processed according to the following preliminary schedule. Revisions to the schedule may be made as appropriate.
Milestone | Target date |
---|---|
Notice of Acceptance/Notice of Ready for Environmental Analysis | July 2020. |
Filing of recommendations, preliminary terms and conditions, and fishway prescriptions | November 2020. |
Commission issues Environmental Assessment (EA) | May 2021. |
Comments on EA | June 2021. |
Modified terms and conditions | August 2021. |
o. Final amendments to the application must be filed with the Commission no later than 30 days from the issuance date of the notice of ready for environmental analysis.
Dated: April 8, 2020.
Kimberly D. Bose,
Secretary.
[FR Doc. 2020-07811 Filed 4-13-20; 8:45 am]
BILLING CODE 6717-01-P