85 FR 203 pg. 66682 - Projects Approved for Minor Modifications

Type: NOTICEVolume: 85Number: 203Page: 66682
FR document: [FR Doc. 2020–23172 Filed 10–19–20; 8:45 am]
Agency: Susquehanna River Basin Commission
Official PDF Version:  PDF Version
Page: 66682

[top] page 66682

SUSQUEHANNA RIVER BASIN COMMISSION

Projects Approved for Minor Modifications

AGENCY:

Susquehanna River Basin Commission.

ACTION:

Notice.

SUMMARY:

This notice lists the minor modifications approved for a previously approved project by the Susquehanna River Basin Commission during the period set forth in DATES .

DATES:

September 1-30, 2020.

ADDRESSES:

Susquehanna River Basin Commission, 4423 North Front Street, Harrisburg, PA 17110-1788.

FOR FURTHER INFORMATION CONTACT:

Jason E. Oyler, General Counsel, telephone: (717) 238-0423, ext. 1312; fax: (717) 238-2436; email: joyler@srbc.net. Regular mail inquiries may be sent to the above address.

SUPPLEMENTARY INFORMATION:

This notice lists previously approved projects, receiving approval of minor modifications, described below, pursuant to 18 CFR 806.18 or to Commission Resolution Nos. 2013-11 and 2015-06 for the time period specified above:

Minor Modification Issued Under 18 CFR 806.18

1. Tulpehocken Spring Water, Inc., Docket No. 20200315, Sugarloaf and Benton Townships, Columbia County, Pa.; approval authorizing the additional water use purpose of bulk supply for hydrostatic testing; Approval Date: September 1, 2020.

Authority:

Pub. L. 91-575, 84 Stat. 1509 et seq., 18 CFR parts 806, 807, and 808.

Dated: October 15, 2020.

Jason E. Oyler,

General Counsel and Secretary to the Commission.

[FR Doc. 2020-23172 Filed 10-19-20; 8:45 am]

BILLING CODE 7040-01-P