84 FR 107 pgs. 25797-25798 - New York State Electric & Gas Corporation; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Type: NOTICEVolume: 84Number: 107Pages: 25797 - 25798
Pages: 25797, 25798Docket number: [Project No. 2934-029]
FR document: [FR Doc. 2019-11595 Filed 6-3-19; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 2934-029]
New York State Electric & Gas Corporation; Notice of Application Accepted for Filing and Soliciting Motions To Intervene and Protests
Take notice that the following hydroelectric application has been filed with the Commission and is available for public inspection.
a. Type of Application: New Major License.
b. Project No.: 2934-029.
c. Date filed: April 1, 2019.
d. Applicant: New York State Electric & Gas Corporation (NYSEG).
e. Name of Project: Upper Mechanicville Hydroelectric Project.
f. Location: The existing project is located on the Hudson River, in Saratoga and Rensselaer Counties, New York. The project does not occupy any federal lands.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791(a)-825(r).
h. Applicant Contact: Hugh J. Ives, Manager, NYSEG Hydro Operations, 89 East Avenue, Rochester, NY 14649; (585) 724-8209; hugh.ives@avangrid.com.
i. FERC Contact: Jody Callihan, (202) 502-8278 or jody.callihan@ferc.gov.
j. Deadline for filing motions to intervene and protests: 60 days from the issuance date of this notice.
The Commission strongly encourages electronic filing. Please file motions to intervene and protests using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-2934-029.
The Commission's Rules of Practice require all intervenors filing documents with the Commission to serve a copy of that document on each person on the official service list for the project. Further, if an intervenor files comments or documents with the Commission relating to the merits of an issue that may affect the responsibilities of a particular resource agency, they must also serve a copy of the document on that resource agency.
k. This application has been accepted for filing, but is not ready for environmental analysis at this time.
l. The existing Upper Mechanicville Hydroelectric Project consists of: (1) A 700-foot-long concrete gravity dam with a crest elevation of 66.6 feet National Geodetic Vertical Datum of 1929 (NGVD29); (2) 3 spillway bays each extending 222 feet across the length of the dam and separated by a 7.5-foot to 10.5-foot-wide concrete pier, with each spillway bay containing 12 pneumatic Obermeyer crest gates that are 6 feet high; (3) a 1.8-mile-long impoundment with a 380-acre surface area and gross storage capacity of 10,735 acre-feet at a normal pool elevation of 72.6 feet NGVD29; (4) an intake channel with two reinforced guide walls and three 35-foot-diameter cofferdam walls constructed of sheet piling; (5) a 20-foot-wide and 7.5-foot-high intake bypass sluice gate; (6) a 105.5-foot-long by 122-foot-wide powerhouse containing two 12,780 horsepower Kaplan turbines and two Siemens-Allis generators each having a rated capacity of 8,265 kilowatts; (7) a tailrace approximately 1,200 feet long and 120 feet wide with a bi-level bottom designed to minimize cross-currents; (8) one 1.10-mile-long, 34.5-kilovolt transmission line; and (9) appurtenant facilities.
[top] During the non-navigation season (typically from December 1 through April 30), NYSEG operates the project in a run-of-river (ROR) mode and maintains the impoundment at an elevation of 72.6 feet NGVD29. During the navigation season (typically May 1 through November 30), NYSEG
m. A copy of the application is available for review at the Commission in the Public Reference Room or may be viewed on the Commission's website at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access the document. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659. A copy is also available for inspection and reproduction at the Mechanicville District Public Library located at 190 North Main Street, Mechanicville, NY 12118 and the A.E. Diver Memorial Library located at 136 Main Street, Schaghticoke, NY 12154.
Register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via email of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.
n. Anyone may submit a protest or a motion to intervene in accordance with the requirements of Rules of Practice and Procedure, 18 CFR 385.210, .211, and .214. In determining the appropriate action to take, the Commission will consider all protests or other comments filed, but only those who file a motion to intervene in accordance with the Commission's Rules may become a party to the proceeding. Any protests or motions to intervene must be received on or before the specified comment date for the particular application.
All filings must: (1) Bear in all capital letters the title "PROTEST" or "MOTION TO INTERVENE;" (2) set forth in the heading the name of the applicant and the project number of the application to which the filing responds; (3) furnish the name, address, and telephone number of the person protesting or intervening; and (4) otherwise comply with the requirements of 18 CFR 385.2001 through 385.2005. Agencies may obtain copies of the application directly from the applicant. A copy of any protest or motion to intervene must be served upon each representative of the applicant specified in the particular application.
o. Procedural Schedule:
The application will be processed according to the following Hydro Licensing Schedule. Revisions to the schedule may be made as appropriate.
Milestone | Target date |
---|---|
Filing of motions to intervene and protests | July 2019. |
Issuance of Ready for Environmental Analysis notice | October 2019. |
Filing of recommendations, preliminary terms and conditions, and preliminary fishway prescriptions | December 2019. |
Reply comments due | February 2020. |
Commission Issues EA | April 2020. |
Comments on EA | May 2020. |
Modified terms and conditions due | July 2020. |
Dated: May 28, 2019.
Kimberly D. Bose,
Secretary.
[FR Doc. 2019-11595 Filed 6-3-19; 8:45 am]
BILLING CODE 6717-01-P