83 FR 229 pgs. 61152-61153 - Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: Badger Mountain Hydro, LLC
Type: NOTICEVolume: 83Number: 229Pages: 61152 - 61153
Pages: 61152, 61153Docket number: [Project No. 14892-000]
FR document: [FR Doc. 2018-25923 Filed 11-27-18; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 14892-000]
Notice of Preliminary Permit Application Accepted for Filing and Soliciting Comments, Motions To Intervene, and Competing Applications: Badger Mountain Hydro, LLC
On October 2, 2018, Badger Mountain Hydro, LLC filed an application for a preliminary permit, pursuant to section 4(f) of the Federal Power Act, proposing to study the feasibility of the Badger Mountain Pumped Storage Project (project) to be located near East Wenatchee in Douglas County, Washington. The sole purpose of a preliminary permit, if issued, is to grant the permit holder priority to file a license application during the permit term. A preliminary permit does not authorize the permit holder to perform any land-disturbing activities or otherwise enter upon lands or waters owned by others without the owners' express permission.
[top] The proposed project will be a closed-loop pumped storage project with initial fill and make up water coming from local water rights holders, tentatively
The estimated average annual generation of the project would be 473,040 megawatt-hours.
Applicant Contact: Matthew Shapiro, CEO, Gridflex Energy, LLC, 1210 W. Franklin St. #2, Boise, ID 837021, phone (208) 246-9925.
FERC Contact: Peter McBride, (202) 502-8132, peter.mcbride@ferc.gov.
Deadline for filing comments, motions to intervene, competing applications (without notices of intent), or notices of intent to file competing applications: 60 days from the issuance of this notice. Competing applications and notices of intent must meet the requirements of 18 CFR 4.36.
The Commission strongly encourages electronic filing. Please file comments, motions to intervene, notices of intent, and competing applications using the Commission's eFiling system at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information at the end of your comments. For assistance, please contact FERC Online Support at FERCOnlineSupport@ferc.gov, (866) 208-3676 (toll free), or (202) 502-8659 (TTY). In lieu of electronic filing, please send a paper copy to: Secretary, Federal Energy Regulatory Commission, 888 First Street NE, Washington, DC 20426. The first page of any filing should include docket number P-14892-000.
More information about this project, including a copy of the application, can be viewed or printed on the eLibrary link of Commission's website at http://www.ferc.gov/docs-filing/elibrary.asp. Enter the docket number (P-14892) in the docket number field to access the document. For assistance, contact FERC Online Support.
Dated: November 21, 2018.
Nathaniel J. Davis, Sr.,
Deputy Secretary.
[FR Doc. 2018-25923 Filed 11-27-18; 8:45 am]
BILLING CODE 6717-01-P