82 FR 243 pgs. 60383-60384 - Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act
Type: NOTICEVolume: 82Number: 243Pages: 60383 - 60384
Pages: 60383, 60384Docket number: [Certification Notice—251]
FR document: [FR Doc. 2017-27397 Filed 12-19-17; 8:45 am]
Agency: Energy Department
Official PDF Version: PDF Version
[top]
DEPARTMENT OF ENERGY
[Certification Notice-251]
Notice of Filing of Self-Certification of Coal Capability Under the Powerplant and Industrial Fuel Use Act
AGENCY:
Office of Electricity Delivery and Energy Reliability, DOE.
ACTION:
Notice of filing.
SUMMARY:
On October 26, 2017, APV Renaissance Opco, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations. The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register .
ADDRESSES:
Copies of coal capability self-certification filings are available for public inspection, upon request, in the Office of Electricity Delivery and Energy Reliability, Mail Code OE-20, Room 8G-024, Forrestal Building, 1000 Independence Avenue SW, Washington, DC 20585.
FOR FURTHER INFORMATION CONTACT:
Christopher Lawrence at (202) 586-5260.
SUPPLEMENTARY INFORMATION:
[top] On October 26, 2017, APV Renaissance Opco, LLC, as owner and operator of a new baseload electric generating powerplant, submitted a coal capability self-certification to the Department of Energy (DOE) pursuant to section 201(d) of the Powerplant and Industrial Fuel Use Act of 1978 (FUA), as amended, and DOE regulations in 10 CFR 501.60, 61. The FUA and regulations thereunder require DOE to publish a notice of filing of self-certification in the Federal Register . 42 U.S.C. 8311(d) and 10 CFR 501.61(c). Title II of FUA, as amended (42 U.S.C. 8301 et seq. ), provides that no
The following owner of a proposed new baseload electric generating powerplant has filed a self-certification of coal-capability with DOE pursuant to FUA section 201(d) and in accordance with DOE regulations in 10 CFR 501.60, 61:
Owner: APV Renaissance Opco, LLC
Capacity: 1000 megawatts (MW)
Plant Location: Renaissance Energy Center, Greene County, PA 15063
In-Service Date: Expected in June 2021
Issued in Washington, DC, on December 12, 2017.
Christopher Lawrence,
Electricity Policy Analyst, Office of Electricity Delivery and Energy Reliability.
[FR Doc. 2017-27397 Filed 12-19-17; 8:45 am]
BILLING CODE 6450-01-P