81 FR 174 pgs. 62106-62107 - Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Proposed Lower Elkhorn Basin Levee Setback Project, Yolo County, CA
Type: NOTICEVolume: 81Number: 174Pages: 62106 - 62107
Pages: 62106, 62107FR document: [FR Doc. 2016-21578 Filed 9-7-16; 8:45 am]
Agency: Defense Department
Sub Agency: Engineers Corps; Army Department
Official PDF Version: PDF Version
[top]
DEPARTMENT OF DEFENSE
Department of the Army; Corps of Engineers
Notice of Intent To Prepare a Joint Environmental Impact Statement/Environmental Impact Report for the Proposed Lower Elkhorn Basin Levee Setback Project, Yolo County, CA
AGENCY:
Department of the Army, U.S. Army Corps of Engineers, DoD.
ACTION:
Notice of intent.
SUMMARY:
The U.S. Army Corps of Engineers (USACE), Sacramento District, as the lead agency under the National Environmental Policy Act (NEPA), and the California Department of Water Resources (DWR), as the lead agency under the California Environmental Quality Act (CEQA), will prepare a joint Environmental Impact Statement/Environmental Impact Report (EIS/EIR) for the Lower Elkhorn Setback Levee Project. DWR is the project proponent and may be referred to as the Applicant or Requester.
The EIS/EIR will analyze DWR's proposed action to implement a flood risk management project in the Lower Elkhorn Basin in Yolo County, California. Because the proposed action would alter Federal levees, permission from USACE is required under Section 14 of the Rivers and Harbors Act (Section 408) (33 U.S.C. 408). The proposed action would also affect waters of the United States and require a permit from USACE under Section 404 of the Clean Water Act (33 U.S.C. 1344).
DATES:
Submit written comments by October 7, 2016.
ADDRESSES:
Written comments and suggestions concerning the scope and content of the environmental information may be submitted to Mr. Tyler Stalker, email at spk-pao@usace.army.mil; or surface mail at U.S. Army Corps of Engineers, Sacramento District, Attn: Public Affairs Office (CESPK-PAO), 1325 J Street, Sacramento, CA 95814-2922. Requests to be placed on the electronic or surface mail notification lists should also be sent to this address.
FOR FURTHER INFORMATION CONTACT:
Ms. Tanis Toland at (916) 557-6717, or by email at tanis.j.toland@usace.army.mil.
SUPPLEMENTARY INFORMATION:
[top] 1. Proposed Action. The proposed Lower Elkhorn Basin Levee Setback Project would include levee setbacks to widen portions of the Yolo and Sacramento Bypasses to increase conveyance capacity and reduce flood risk. The project would be part of a series of proposed flood risk
2. Alternatives. A number of project alternatives, including the no action alternative and the Requester's/Applicant's preferred alternative will be evaluated in the EIS/EIR in accordance with NEPA (33 CFR part 230 (USACE NEPA Regulations) and 33 CFR part 325, Appendix B (NEPA Implementation Procedures for USACE Regulatory Projects).
3. Scoping Process.
a. A public scoping meeting will be held on Thursday, September 15, 2016, from 4:00 p.m. to 7:00 p.m., West Sacramento Civic Center, 1110 West Capitol Avenue, West Sacramento, CA 95691 to present information to the public and to receive comments from the public on the project and the scope of the environmental analysis. Affected Federal, State, regional, and local agencies; Native American Tribes; other interested private organizations; and the general public are invited to participate.
b. The EIS/EIR will analyze the environmental effects of construction, operations, and maintenance of the project. Potentially significant issues to be analyzed in depth include loss of waters of the United States (including wetlands), cultural resources, biological resources, special status species, air quality, hydrology and water quality, land use, Prime and Unique Farmlands, noise, traffic, aesthetics, utilities and service systems, and socioeconomic effects.
c. USACE will consult with the State Historic Preservation Officer and with Native American Tribes to comply with the National Historic Preservation Act, and with the U.S. Fish and Wildlife Service and National Marine Fisheries Service to comply with the Endangered Species Act. USACE will also coordinate with the U.S. Fish and Wildlife Service to comply with the Fish and Wildlife Coordination Act.
d. A 45-day NEPA public review period will be provided for all interested parties, individuals, and agencies to review and comment on the draft EIS/EIR. All interested parties are encouraged to respond to this notice and provide a current address if they wish to be notified of the draft EIS/EIR circulation.
4. Availability. The draft EIS/EIR is scheduled to be available for public review and comment in November 2017.
Dated: August 28, 2016.
David G. Ray,
Colonel, U.S. Army, District Commander.
[FR Doc. 2016-21578 Filed 9-7-16; 8:45 am]
BILLING CODE 3720-58-P