76 FR 63 pgs. 18212-18213 - FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of Availability of Draft Environmental Assessment

Type: NOTICEVolume: 76Number: 63Pages: 18212 - 18213
Docket number: [Project No. 2615-037]
FR document: [FR Doc. 2011-7687 Filed 3-31-11; 8:45 am]
Agency: Energy Department
Sub Agency: Federal Energy Regulatory Commission
Official PDF Version:  PDF Version

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 2615-037]

FPL Energy Maine Hydro LLC; Madison Paper Industries; Merimil Limited Partnership; Notice of Availability of Draft Environmental Assessment

In accordance with the National Environmental Policy Act of 1969 and the Federal Energy Regulatory Commission's regulations, 18 CFR Part 380 (Order No. 486, 52 FR 47897), the Office of Energy Projects has reviewed the application for a new license for the 4.18-megawatt Brassua Hydroelectric Project, located on the Moose River, in Somerset County, Maine, and has prepared a draft Environmental Assessment (EA). In the EA, Commission staff analyze the potential environmental effects of relicensing the project and conclude that issuing a new license for the project, with appropriate environmental measures, would not constitute a major federal action that would significantly affect the quality of the human environment.

A copy of the EA is on file with the Commission and is available for public inspection. The EA may also be viewed on the Commission's Web site at http://www.ferc.gov using the "eLibrary" link. Enter the docket number excluding the last three digits in the docket number field to access documents. For assistance, contact FERC Online Support at FERCOnlineSupport@ferc.gov or toll-free at 1-866-208-3676, or for TTY, (202) 502-8659.

You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and issuances related to this or other pending projects. For assistance, contact FERC Online Support.

Any comments on the EA should be filed within 45 days from the date of this notice. Comments may be filed electronically via the Internet. See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can submit brief comments up to 6,000 characters, without prior registration, using the eComment system at http://www.ferc.gov/docs-filing/eComment.asp. You must include your name and contact information at the end of your comments.

For assistance, please contact FERC Online Support. Although the Commission strongly encourages electronic filing, documents may also be paper-filed. To paper-file, mail an original and seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory Commission, 888 First Street, Washington, DC 20426. Please affix "Brassua Hydroelectric Project No. 2615-037" to all comments. For further information, contact Steve Kartalia at (202) 502-6131.

Dated: March 25, 2011.

Kimberly D. Bose,

Secretary.

[FR Doc. 2011-7687 Filed 3-31-11; 8:45 am]

BILLING CODE 6717-01-P