75 FR 53 pgs. 13275-13276 - Environmental Impacts Statements; Notice of Availability

Type: NOTICEVolume: 75Number: 53Pages: 13275 - 13276
Docket number: [ER-FRL-8989-2]
FR document: [FR Doc. 2010-6081 Filed 3-18-10; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8989-2]

Environmental Impacts Statements; Notice of Availability

Responsible Agency: Office of FederalActivities, General Information, (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements

Filed 03/08/2010 through 03/12/2010

Pursuant to 40 CFR 1506.9

Notice

In accordance with Section 309(a) of the Clean Air Act, EPA is required to make its comments on EISs issued by other Federal agencies public. Historically, EPA has met this mandate by publishing weekly notices of availability of EPA comments, which includes a brief summary of EPA's comment letters, in the Federal Register. Since February 2008, EPA has been including its comment letters on EISs on its Web site at: http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire EIS comment letters on the Web site satisfies the Section 309(a) requirement to make EPA's comments on EISs available to the public. Accordingly, after March 31, 2010, EPA will discontinue the publication of this notice of availability of EPA comments in the Federal Register.

EIS No. 20100074, Draft EIS, FHWA, MO, First Tier-Future I-70 Kansas City Metro Project, Proposing toImprove I-70 Corridor from East of the Missouri and Kansas StateLine to East of I-470 Interchange, Downtown Central BusinessFreeway Loop, Kansas City, Jackson County, MO, Comment PeriodEnds: 05/07/2010, Contact: Peggy Casey 573-636-7104.

EIS No. 20100075, Final EIS, USA, LA, Joint Readiness Training Center and Fort Polk Land AcquisitionProgram, Purchase and Lease Lands for Training and ManagementActivities, in the Parishes of Vernon, Sabine, Natchitoches, LA, Wait Period Ends: 04/19/2010, Contact: Kristin Evenstad,703-692-6427.

EIS No. 20100076, Final EIS, FRBSF, WA, Federal Reserve Bank of San Francisco, Proposes to sell theProperty at 1015 Second Avenue that is Eligible for Listing onthe National Register of Historic Places, located in Seattle, WA, Wait Period Ends: 04/19/2010, Contact: Robert Kellar415-974-2655.

EIS No. 20100077, Final EIS, USFWS, NV, Southeastern Lincoln County Habitat Conservation Plan,Application Package for Three Incidental Take Permits, Authorizethe Take of Desert Tortoise (Gopherus agassizii) andSouthwestern Williow Flycatcher (Empidonax traillii extimus),Implementation, Lincoln County, NV, Wait Period Ends: 05/03/2010, Contact: John Robles 916-414-6731.

EIS No. 20100078, Draft EIS, USACE, FL, Central and Southern Florida Project, Comprehensive EvergladesRestoration Plan, Biscayne Bay Coastal Wetlands Phase IProject, To Restore the Natural Hydrology and Ecosystem in anArea Degraded by Drainage Systems and Land Development,Miami-Dade County, FL, Comment Period Ends: 05/03/2010, Contact: Brad Tarr 904-232-3582.

EIS No. 20100079, Revised Draft EIS, FRA, SC, Bay Area to Central Valley High-Speed Train (HST) Project,Additional Information and Analysis Needed for Compliance withthe Court Judgement, Provide a Reliable High-Speed ElectrifiedTrain System to Link Bay Area Cities to the Central Valley,Sacramento, and South California, Comment Period Ends: 05/03/2010, Contact: Dan Leavitt 916-324-1541.

EIS No. 20100080, Final EIS, USFS, CA, Sugar Pine Adaptive Management Project, Proposal to Create aNetwork of Strategically Placed Landscape Area Treatments(SPLATs) and Defensible Fuels Profiles near Key TransportationCorridors to Reduce the Intensity and Spread of Wildfires acrossthe landscape and near Communities, Madera and MariposaCounties, CA, Wait Period Ends: 04/19/2010, Contact: Mark Lemon559-877-2218 Ext 3110.

EIS No. 20100081, Draft EIS, USFS, AZ, Coconino National Forest Travel Management Project, Proposes toDesignate a System of Road and Motorized Travel, Implementation,Coconino and Yavapai County, AZ, Comment Period Ends: 05/17/2010, Contact: Jim Beard 928-527-3474.

EIS No. 20100082, Draft EIS, USFS, ID, Clear Prong Project, To Implement Silvicultural Activities,Including Thinning of Sub-Merchantable Trees, Prescribed Firesand Aspen Enhancement on 2,190 Acres, Bois National Forest,Cascade Ranger District, Valley County, ID, Comment Period Ends: 05/03/2010, Contact: Keith Dimmett 208-382-7400.

EIS No. 20100083, Draft EIS, BLM, NV, Amargosa Farm Road Solar Energy Project, Construction andOperation of Two Concentrated Solar Power Plant Facilities,Right-of-Way Application on Public Lands, Nye County, NV, CommentPeriod Ends: 05/03/2010, Contact: Gregory Helseth 702-515-5173.

EIS No. 20100084, Final EIS, USCG, AL, Bienville Offshore Energy Terminal (BOET) Deepwater Port LicenseApplication Amendment (Docket # USCG-2006-24644), Proposes toConstruct and Operate a Liquefied Natural Gas Receiving andRegasification Facility, Outer Continental Shelf of the Gulf ofMexico, South of Fort Morgan, AL, Wait Period Ends: 04/30/2010, Contact: Lt. Hannah Kawamoto 202-372-1438.

EIS No. 20100085, Draft EIS, BLM, CA, Blythe Solar Power Project (09-AFC-6), Application for Right-ofWay Grant to Construct and Operate, and Decommission a SolarThermal Facility on Public Lands, Riverside County, CA, CommentPeriod Ends: 06/16/2010, Contact: Sandra McGinnis 916-978-4427.

EIS No. 20100086, Final EIS, NOAA, 00, Amendment 3 to the 2006 Consolidated Atlantic Highly MigratorySpecies (HMS), Fishery Management Plan, To Implement ManagementMeasures that Prevent Overfishing and Rebuild Overfished Stocks,Implementation, Wait Period Ends: 04/19/2010, Contact: MargoSchulze-Haugen 301-713-2347.

Amended Notices

EIS No. 20100037, Second Draft Supplement, USFS, 00, Sierra Nevada Forest Plan Amendment, Proposes to Provide anObjective Comparison of all of the Alternatives for 2004 FinalEIS, Amending Land and Resource Management Plans, Modoc,Lasser, Plumas, Tahoe, Eldorado, Stanislaus, Sequoia, Sierra,Inyo and Humboldt-Toiyabe National Forests, and the Lake TahoeBasin Management Unit, Several Counties, CA and NV, CommentPeriod Ends: 05/05/2010, Contact: Randy Moore 707-562-8737,Revision to FR Notice Published 02/19/2010: Extending CommentPeriod from 04/05/2010 to 05/05/2010.

EIS No. 20100066, Final EIS, FHWA, FL, WITHDRAWN-Interstate 395 (I-395) Development and EnvironmentStudy Project, From I-95 to West Channel Bridges of theMacArthur Causeway at Biscayne Bay, City of Miami, Miami-DadeCounty, FL, Wait Period Ends: 04/12/2010, Contact: Linda K.Anderson 850-942-9650 Ext. 3053, Revision to FR NoticePublished 03/12/2010: EIS is withdrawn due toNon-Distribution of the document.

Dated: March 16, 2010.

Robert W. Hargrove,

Director, NEPA Compliance Division,Office of Federal Activities.

[FR Doc. 2010-6081 Filed 3-18-10; 8:45 am]

BILLING CODE 6560-50-P