74 FR 171 pg. 45846 - Environmental Impacts Statements; Notice of Availability

Type: NOTICEVolume: 74Number: 171Page: 45846
Docket number: [ER-FRL-8596-9]
FR document: [FR Doc. E9-21387 Filed 9-3-09; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8596-9]

Environmental Impacts Statements; Notice of Availability

Responsible Agency: Office of FederalActivities, General Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statementsfiled 08/24/2009 through 08/28/2009.Pursuant to 40 CFR 1506.9.

EIS No. 20090301, Final Supplement, NRS, WV, Lost River Subwatershed of the Potomac River Watershed Project,Construction of Site 16 on Lower Cove Run and Deletion of Site23 on Cullers Run in the Lost River Watershed, Change in Purposefor Site 16 and Updates Information Relative to Site 23, U.S. ArmyCOE Section 404 Permit, Hardy County, WV, Wait Period Ends:10/05/2009, Contact: Kevin Wickey 304-284-7540.

EIS No. 20090302, Draft EIS, FHW, UT, Tooele County Midvalley Highway Project, To Address TrafficCongestion on UT-36 and at the I-80/Lake Point interchangethrough the Year 2030, Funding, Tooele County, UT, CommentPeriod Ends: 10/19/2009, Contact: Edward Woolford 801-963- 0182.

EIS No. 20090303, Draft EIS, AFS, OR, Upper Beaver Creek Vegetation Management Project, Proposes toImplement Multiple Resource Management Actions, Pauline RangerDistrict, Ochoco National Forest, Crook County, OR, CommentPeriod Ends: 10/19/2009, Contact: Slater Turner 541-477-6900

EIS No. 20090304, Final EIS, AFS, CA, Inyo National Forest Motorized Travel Management Project,Implementation, Inyo, Mineral, Mono and Esmeralda Counties, CA,Wait Period Ends: 10/05/2009, Contact: Susan Joyce 760-873-2516.

EIS No. 20090305, Final EIS, NOA, CA, ADOPTION-PROGRAMMATIC-South Bay Salt Pond RestorationProject, Restored Tidal Marsh, Managed Ponds, Flood ControlMeasures and Public Access Features, Don Edward San FranciscoBay National Wildlife Refuge, Alameda, Santa Clara and San MateoCounties, CA, Wait Period Ends: 10/05/2009, Contact: PatriciaA. Montanio 301-713-2325.

The U.S. Department of Commerce, National Oceanic and Atmospheric Administration's hasadopted the U.S. Department of Interior's, Fish and Wildlife Service's FEIS #20070539 filed12/17/2007. Fish and Wildlife Service was not a Cooperating Agency on the above FEIS.Under Section 1506.3(b) of the CEQ Regulations, the FEIS must be recirculated for a 30-day Wait Period.

EIS No. 20090306, Final EIS, NOA, CA, ADOPTION-PROGRAMMATIC-San Francisco Estuary InvasiveSpartina Project, Spartina Control Program, Preservation andRestoration of Ecological Integrity for the Estuary's IntertidalHabitats, Alameda, Contra Costa, Marin, Napa, San Francisco,Santa Mateo Counties, CA, Wait Period Ends: 10/05/2009, Contact: Patricia A. Montanio 301-713-2325.

The U.S. Department of Commerce, National Oceanic and Atmospheric Administration's has adopted the U.S. Department of Interior's, Fish and Wildlife Service's FEIS #200400013 filed 01/12/2004. Fish and Wildlife Service was not a Cooperating Agency on the above FEIS. Under Section 1506.3(b) of the CEQ Regulations, the FEIS must be recirculated for a 30-day Wait Period.

EIS No. 20090307, Draft EIS, UCG, 00, PROGRAMMATIC-Ballast Water Discharge Standard Project, ToImplement a Ballast Water Discharge Standard to Prevent orReduce the Number of Non-indigenous Species introduced into theUnited States Waters, Comment Period Ends: 10/19/2009, Contact: Gregory B. Kirkbride 202-372-1479.

EIS No. 20090308, Draft Supplement, USN, FL, Renewal of Authorization to Use Pinecastle Range, NewInformation that was not Available in the 2002 FEIS, ContinuedUse of the Range for a 20 Year Period, Special Use PermitIssuance, Ocala National Forest, Marion and Lake Counties, FL,Comment Period Ends: 10/19/2009, Contact: Tom Currin904-542-6301.

EIS No. 20090309, Final EIS, FHW, MO, Interstate 70 East Corridor Improvements, Kansas City to St.Louis, Evaluates if a Truck-Only Lane Strategy is Viable,Kansas City to St. Louis, MO, Wait Period Ends: 10/05/2009, Contact: David Beckhouse 720-963-3306.

Amended Notices

EIS No. 20090223, Draft EIS, AFS, NV, Jarbridge Ranger District Rangeland Management Project, ProposedReauthorizing Grazing on 21 Existing Grazing Allotments,Humboldt Toiyabe National Forest, Elko County, NV, CommentPeriod Ends: 09/08/2009, Contact: Vern Keller 775-355-5356Revision to FR Notice Published 07/10/2009: Extending CommentPeriod from 08/24/2009 to 09/08/2009.

EIS No. 20090265, Draft EIS, AFS, ID, Clearwater National Forest Travel Planning Project, Proposes toManage Motorized and Mechanized Travel within the1,827.380-Acre, Clearwater National Forest, Idaho, Clearwater,Latah and Shoshone Counties, ID, Comment Period Ends:10/02/2009, Contact: Doug Gober 208-476-4541.Revision to FR Notice Published 08/07/2009: Extending CommentPeriod from 09/21/2009 to 10/02/2009

EIS No. 20090285, Draft EIS, NPS, CA, Warner Valley Comprehensive Site Plan, Addressing Natural andCultural Resource Conflicts, Parking and CirculationImprovements in Warner Valley, Implementation, Lassen VolcanicNational Park, Plumas County, CA, Comment Period Ends:11/20/2009, Contact: Louise Johnson 530-595-4444 ext. 5170. Revision to FR Notice Published 08/21/2009: Correction toComment Period from 11/21/2009 to 11/20/2009.

Dated: September 1, 2009.

Robert W. Hargrove,

Director, NEPA Compliance Division,Office of Federal Activities.

[FR Doc. E9-21387 Filed 9-3-09; 8:45 am]

BILLING CODE 6560-50-P