71 FR 208 pg. 63007 - Environmental Impacts Statements; Notice of Availability
Type: NOTICEVolume: 71Number: 208Page: 63007
Docket number: [ER-FRL-6680-5]
FR document: [FR Doc. E6-18018 Filed 10-26-06; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6680-5]
Environmental Impacts Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/ .
Weekly receipt of Environmental Impact Statements
Filed 10/16/2006 Through 10/20/2006
Pursuant to 40 CFR 1506.9.
EIS No. 20060435, Final EIS, COE, AZ , Rio Salado Oeste Project, Ecosystem Restoration along the Salt River, City of Phoenix, Maricopa County, AZ, Wait Period Ends: 11/27/2006, Contact: Scott K. Estergard 602-640-2003.
EIS No. 20060436, Draft Supplement, FHW, IN , US-31 Kokomo Corridor Project, Updated Information on Alternative J, Transportation Improvement between IN-26 and U.S. 35 Northern Junction, City of Kokomo and Center Township, Howard and Tipton Counties, IN, Comment Period Ends: 12/11/2006, Contact: Larry Heil 317-226-7480.
EIS No. 20060437, Draft EIS, NRS, WV , Dunloup Creek Watershed Plan, Voluntary Floodplain Buyout, Implementation, West Virginia Third Congressional District, Fayette and Raleigh Counties, WV, Comment Period Ends: 12/11/2006, Contact: Ronald Hilliard 304-284-7540.
EIS No. 20060438, Draft EIS, VAD/DON, CA , Fort Rosecrans National Cemetery Annex, Construction and Operation, Located at Marine Corps Air Station (MCAS) Miramar, Point Loma, San Diego County, CA, Comment Period Ends: 12/11/2006, Contact: Hiphil Clemente 619-532-3781.
EIS No. 20060439, Final Supplement, AFS, CA , Rock Creek Recreational Trails Project, Updated Information on Habitat Status and Population Trend for the Pacific Deer Herd, Implementation, Eldorado National Forest, Eldorado County, CA, Wait Period Ends: 11/27/2006, Contact: Laura Hierholzer 530-642-5187.
EIS No. 20060440, Draft EIS, GSA, VA , Federal Bureau of Investigation (FBI) Central Records Complex, Site Selection and Construction, Winchester, Frederick County, VA, Comment Period Ends: 12/11/2006, Contact: Katrina Scarpato 215-446-4651.
EIS No. 20060441, Final EIS, CGD, MA , Northeast Gateway Deepwater Port License Application to Import Liquefied Natural Gas (LNG) (USCG-2005-22219), Massachusetts Bay, City of Gloucester, MA, Wait Period Ends: 11/27/2006, Contact: Roddy Bachman 202-372-1451.
EIS No. 20060442, Final EIS, BLM, ID , Coeur d'Alene Resource Management Plan, Implementation, Benewah, Bonner, Boundary, Kootenai and Shoshone Counties, ID, Wait Period Ends: 11/27/2006, Contact: Scott Pavey 208-769-5059.
Amended Notices
EIS No. 20060348, Draft EIS, NPS, MN , Disposition of Bureau of Mines Property, Twin Cities Research Center Main Campus, Implementation, Hennepin County, MN, Comment Period Ends: 11/24/2006, Contact: Kim M. Berns 651-290-3030-x244. Revision of FR Notice Published 08/18/2006: Extend Comment Period from 10/16/2006 to 11/24/2006.
EIS No. 20060360, Draft EIS, AFS, WA , Gifford-Pinchot National Forest and Columbia River Gorge National Scenic Area (Washington Portion) Site-Specific Invasive Plant Treatment Project, Implementation, Skamania, Cowlitz, Lewis, Clark, Klickitat Counties, WA, Comment Period Ends: 11/22/2006, Contact: Carol A. Chandler 541-360-5100. Revision of FR Notice Published 09/01/2006: Extending Comment Period from 10/16/2006 to 11/22/2006.
EIS No. 20060376, Draft EIS, FHW, AK , Knik Arm Crossing Project, To Provide Improved Access between the Municipality of Anchorage and Matanuska-Susitna Borough, AK, Comment Period Ends: 11/17/2006, Contact: Ms. Edrie Vinson 907-586-7464. Revision of FR Notice Published 09/15/2006: Extend Comment from 10/30/2006 to 11/17/2006.
Dated: October 24, 2006.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. E6-18018 Filed 10-26-06; 8:45 am]
BILLING CODE 6560-50-P