69 FR 34 pgs. 7941-7942 - Environmental Impact Statements; Notice of Availability

Type: NOTICEVolume: 69Number: 34Pages: 7941 - 7942
Docket number: [ER-FRL-6648-5]
FR document: [FR Doc. 04-3720 Filed 2-19-04; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6648-5]

Environmental Impact Statements; Notice of Availability

Responsible Agency: Office of FederalActivities, General Information (202)564-7167 or http://www.epa.gov/compliance/nepa/.

Weekly receipt of Environmental Impact Statements

Filed February 9, 2004, through February 13, 2004,

Pursuant to 40 CFR 1506.9.

EIS No. 040066, Draft EIS, NPS, CA, Point Reyes National Seashore (PRNS) and the North District of Golden Gate National Recreation Area (GGNRA)Fire Management Plan, Implementation, MarinCounty, CA, Comment Period Ends: April 20, 2004, contact: Roger Wong (415) 464-5243. This document is available on the Internet at: http://www.nps.gov/pore/.

EIS No. 040067, Final Supplement, NOA, Atlantic Sea Scallop Fishery Management Plan(FMP), Amendment 10, Introduction of SpatialManagement of Adult Scallops, Essential FishHabitat (EFH), from the Gulf of Maine and GeorgesBanks to Cape Hatteras, NC, Wait Period Ends: March 22, 2004, contact: Paul Howard (978) 465-0492. This document is available on the Internet at: http://www.nefmc.org.

EIS No. 040068, Final Supplement, COE, FL, Central and Southern Florida Project, TamiamiTrail Feature (US Highway 41), Modified WaterDeliveries to Everglades National Park, DadeCounty, FL, Wait Period Ends: March 22, 2004, contact: Jon Moulding (904) 232-2286. This document is available on the Internet at: http//www.saj.usace.army.mil/dp/tamiami.htm.

EIS No. 040069, Draft EIS, COE, KY, Pike County(Levisa Fork) Section 202 Flood Damage ReductionProject, Design, Construct and Implement FloodDamage Reduction Measures, Appalachian Mountain,Big Sandy River, Pike County, KY, Comment Period Ends: April 5,2004, contact: Pete K. Dodgion (304) 399-5636.

EIS No. 040070, Draft EIS, NPS, AZ, SaguaroNational Park Fire Management Plan, Implementation,Tucson, AZ, Comment Period Ends: April 20, 2004, contact: Sarah Craighead (520) 733-5130.

EIS No. 040071, Final EIS, AFS, PR, CaribbeanNational Forest, Constructing the Rio SabanaPicnic Area Construction, Rio Sabana TrailReconstruction and Highway PR 191 Reconstruction from Km. 21.3 to Km 20.0, Special-Use-Permit, PR,Wait Period Ends: March 22, 2004, contact: Manuel Ortiz(787) 888-5669.

Amended Notices

EIS No. 040025, Draft EIS, USN, MS, Purchase of Land in Hancock County, Mississippi, for a NavalSpecial Operations Forces Training Range, ToImprove Riverine and Jungle Training Available,John C. Stennis Space Center, Hancock County, MS,Comment Period Ends: March 15, 2004, contact: Richard Davis(843) 820-5589.Revision of Federal Register Notice published on 01/30/2004: Change in contact person telephone number.

EIS No. 040059, Draft EIS, AFS, AZ, Arizona Snowbowl Facilities Improvements, Proposal to Provide a Consistent/Reliable Operating Season, Coconino National Forest, Coconino County, AZ,Comment period ends: April 12, 2004, contact: Ken Jacobs (928)774-1147.Revision of Federal Register Notice Published on 2/13/2004: CEQ comment period ending 3/29/2004 has been corrected to 4/12/2004 and the Web site has been corrected to http://www.fs.fed.us/r3/coconino/nepa/index.shtml.

Dated: February 17, 2004.

Ken Mittelholtz,

Environmental Protection Specialist, Office of Federal Activities.

[FR Doc. 04-3720 Filed 2-19-04; 8:45 am]

BILLING CODE 6560-50-P