69 FR 199 pg. 61248 - Environmental Impact Statements; Notice of Availability

Type: NOTICEVolume: 69Number: 199Page: 61248
Docket number: [ER-FRL-6656-6]
FR document: [FR Doc. 04-23152 Filed 10-14-04; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version:  PDF Version

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-6656-6]

Environmental Impact Statements; Notice of Availability

Responsible Agency: Office of FederalActivities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/

Weekly receipt of Environmental Impact StatementsFiled October 4, 2004 Through October 8, 2004Pursuant to 40 CFR 1506.9.

EIS No. 040477, Final EIS, AFS, ID, North Sheep Allotments-Sheep and Goat Allotment Management Plans, To Authorize Continued Sheep Grazing for Fisher Creek, Smiley Creek, North Fork-Boulder and Baker Creek Sheep and Goat GrazingAllotments, Sawtooth National Forest, KetchumRanger District, Sawtooth National RecreationArea, Blaine and Custer Counties, ID, Wait PeriodEnds: November 15, 2004, Contact: Carol Brown (208) 727-5000.

EIS No. 040478, Draft EIS, FAA, PA, Philadelphia International Airport Project, Proposed Runway 17-35 Extension Project, Funding, NPDES Permit and U.S. Army COE Section 404 Permit,Philadelphia, PA, Comment Period Ends: November 29,2004, Contact: Susan McDonald (717) 730-2833.

EIS No. 040479, Revised Draft EIS, JUS, AZ, Programmatic EIS-Office of Border PatrolOperational Activities within the Border Areas of the Tucson and Yuma Sectors, Expansion of Operations of Technology-Based Systems,Completion and Maintenance of ApprovedInfrastructure, Cochise, Pima, Santa Cruz, andYuma Counties, AZ, Comment Period Ends:November 29, 2004, Contact: Mark Doles (817) 886-6499.

EIS No. 040480, Final EIS, USA, UT, ActivitiesAssociated with Future Programs at U.S. Army DugwayProving Ground, Implementation, Tooele and JaubCounties, UT, Wait Period Ends: November 15, 2004,Contact: Nicholas J. Cavallaro (410) 278-1084.

EIS No. 040481, Draft Supplement, AFS, AK, Emerald Bay Timber Sale, Implementation,Additional Information on the Potential Effects of the Project Alternatives, Ketchikan-MistyFiords Ranger District, Tongass National Forest,AK, Comment Period Ends: November 29, 2004,Contact: John Natvig (605) 720-7710.

EIS No. 040482, Draft EIS, FHW, PA, U.S. 219 Improvements Project, Meyersdale to Somerset, SR 6219, Section 020, Funding, U.S. COE Section 404Permit, Somerset County, PA, Comment Period Ends:November 30, 2004, Contact: James A. Cheatham(717) 221-3461.

EIS No. 040483, Final EIS, FHW, MO, MO-17Transportation Improvement Project, South of Route O to South of Howell County Line BridgeReplacement with Approaches, Funding, U.S. COESection 404 Permit, Shannon, Texas, and HowellCounties, MO, Wait Period Ends: November 15, 2004,Contact: Don Neumann (573) 636-7104.

EIS No. 040484, Draft EIS, NIH, TX, GalvestonNational Laboratory for Biodefense and EmergingInfectious Diseases Research Facility at the University of Texas Medical Branch, Construction,Partial Funding, Grant, Galveston, TX, Comment PeriodEnds: December 17, 2004, Contact: Valerie Nottingham(301) 496-7775.

EIS No. 040485, Draft EIS, AFS, CO, Vail Valley Forest Health Project, Proposal Landscape-ScaleVegetation Management and Fuels Reduction, White River NationalForest, Holy Cross Ranger District, Eagle County, C0,Comment Period Ends: November 29, 2004,Contact: Peech Keller (970) 468-5400.

Dated: October 12, 2004.

Ken Mittelholtz,

Environmental Protection Specialist, Office of Federal Activities.

[FR Doc. 04-23152 Filed 10-14-04; 8:45 am]

BILLING CODE 6560-50-P