68 FR 182 pgs. 54900-54901 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 68Number: 182Pages: 54900 - 54901
Docket number: (ER-FRL-6643-9)
FR document: [FR Doc. 03-24001 Filed 9-18-03; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
(ER-FRL-6643-9)
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202)564-7167 or http://www.epa.gov/compliance/nepa.
Weekly receipt of Environmental Impact Statements
Filed September 08, 2003 Through September 12, 2003Pursuant to 40 CFR 1506.9.
EIS No. 030416, Final EIS, APH, Importation of Solid Wood Packing Material, To Exclude,Eradicate and/or Control Invasive AlienAgricultural Pest, Implementation, United States, Wait Period Ends: October 20, 2003, Contact: David A. Bergsten (301) 734-6103.
EIS No. 030417, Draft EIS, AFS, NM, Surface Management of Gas Leasing and Development in the Carson National Forest, Implementation, JicarillaRanger District, Rio Arriba County, NM, Comment Period Ends: November 3, 2003, Contact: Tom Dwyer (505) 758-6272. This document is available on the Internet at: http://www.fs.fed.us/r3/carson.
EIS No. 030418, Draft EIS, AFS, MI, BaltimoreVegetative Management Project, Implementation,Ottawa National Forest, Ontonagon Ranger District,Ontonagon County, MI, Comment Period Ends: November 3, 2003, Contact: Bruce Prud'homme (906) 884-2085.
EIS No. 030419, Draft EIS, AFS, NM, Magdelena Ridge Observatory Project, Construct and Operate an Observatory in the Magdelena Mountains, CibolaNational Forest, Magdelena Ranger District,Socorro County, NM, Comment Period Ends: November 3, 2003, Contact: Laura Hudnell (505) 854-2281.
EIS No. 030420, Draft EIS, HHS, MD, IntegratedResearch Facility (IRF) at Fort DetrickConstruction and Operation, Adjacent to ExistingU.S. Army Medical Research Institute of Infectious Diseases Facilities, City of Frederick,Frederick County, MD, Comment Period Ends: November 3, 2003, Contact: Ron Wilson (301) 496-5037.
EIS No. 030421, Final EIS, DOE, CA, SacramentoArea Voltage Support Project, System Reliability and Voltage Support Improvements, Sierra NevadaRegion, Alameda, Contra Costa, Placer,Sacramento, San Joaquin and Sutter Counties, CA, Wait Period Ends: October 20, 2003, Contact: Loreen McMahon (916) 353-4460. This document is available on the Internet at: http://www.wapa.gov.
EIS No. 030422, Draft EIS, BPA, WA, BP CherryPoint Cogeneration Project, To Build a 720-megawatt Gas-Fired Combined CycleCogeneration Facility, Energy Facility SiteEvaluation Council (EFSEC), Whatcom County, WA, Comment Period Ends: November 3, 2003, Contact: Thomas C. McKinney (503) 230-4749.
EIS No. 030423, Draft EIS, NOA, WA, CA, OR, Pacific Coast Groundfish Fishery Management Plan (FMP) Amendment 16-2, Rebuilding Plans for:Darkblotched Rockfish, Pacific Ocean Perch, Canary Rockfish, and Lingcod, Maximum SustainableYield (MSY) Magnuson-Stevens Fishery Conservation and Management Act, WA, OR, CA and Boundary of U.S. EEZ, Comment Period Ends: November 3, 2003, Contact: D.Robert Lohn (206) 526-6150.
EIS No. 030424, Final EIS, BIA, CA, Jamul IndianVillage (Tribe) 101 Acre Fee-to-Trust Transfer and Casino Project, Implementation, San DiegoCounty, CA, Wait Period Ends: November 3, 2003, Contact: William Allan (916) 978-6043.
EIS No. 030425, Final EIS, EPA, AK, Pogo GoldMine Project, Underground Mine Construction andOperation, NPDES and U.S. Army COE Section 404Permits Issuance, Goodpaster River Valley, DeltaJunction, AK, Wait Period Ends: October 20, 2003, Contact: Hanh Gold (206) 553-0171.
Amended Notices
EIS No. 030367, Draft EIS, IBR, CA, FreeportRegional Water Project, To Construct and Operate a Water Supply Project to Meet Regional WaterSupply Needs, Sacramento County Water Agency(SCWA) and the East Bay Municipal UtilityDistrict (EBMUD), Alameda, Contra Costa, SanJoaquin, Sacramento Counties, CA, Comment Period Ends: October 7, 2003, Contact: Rod Schroeder (916) 989-7274.Revision of FR Notice Published on 8/15/2003: CEQ Comment PeriodEnding 9/29/2003 has been Extended to 10/7/2003.
EIS No. 030394, Draft Supplement, NOA, MA, ME, RI, NH, CT, Northeast Multispecies FisheryManagement Plan, Amendment 13, New Information concerning Management Alternatives and ImpactAnalysis, Adoption, Approval and Implementation,New England Management Council, ME, HH, VT, MA,RI, CT, NY, NJ, DE, MD, VA and NC, Comment Period Ends :October 15, 2003, Contact: Paul Howard (978) 465-0492.Revision of FR Notice Published on 8/29/2003:Title Correction.
EIS No. 030411, Final EIS, FHW, WY, WyomingForest Highway 4 U.S. 212 (KP 39.5 to KP 69.4) the Beartooth Highway, A Portion Proposed for Reconstruction begins 7.1 miles east of the Junction of WY-296 (Chief Joseph Highway) andProceeds East for 18.6 miles to the Wyoming/MontanaState Line, Park County, WY, Wait Period Ends: October 14, 2003, Contact: Jennifer Corwin (303) 716-2097.Revision of FR Notice Published on 9/12/2003:Correction to Telephone Number.
Dated: September 16, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-24001 Filed 9-18-03; 8:45 am]
BILLING CODE 6560-50-P