68 FR 90 pg. 25023 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 68Number: 90Page: 25023
Docket number: [ER-FRL-6639-9]
FR document: [FR Doc. 03-11632 Filed 5-8-03; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6639-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202)564-7167 or http://www.epa.gov/compliance/nepa/ .
Weekly receipt of Environmental Impact Statements
Filed April 28, 2003 through May 2, 2003
Pursuant to 40 CFR 1506.9.
EIS No. 030193, Draft EIS, AFS, CA, Spalding LandExchange Project, Proposed Land Exchange betweenSpalding Community Service District (SCSD) andLassen National Forest (LNF), Special Use Permit,Lassen County, CA, Comment Period Ends: June 23, 2003,Contact: Lois Charlton (530) 257-2151.
EIS No. 030194, Draft EIS, AFS, SD, Sioux RangerDistrict Oil and Gas Leasing Project, Implementation,Sioux Ranger District, Custer National Forest,Harding County, SD, Comment Period Ends: July 8, 2003, Contact: Laurie Waters-Clark (605) 707-4432.The U.S. Department of Agriculture, Forest Service and the U.S. Department of the Interior, Bureau of Land Management are Joint Lead Agencies on the above project.This document is available on the Internet at: http://(www.fs.fed.us/r1/custer/ .
EIS No. 030195, Final Supplement, COE, TX, DallasFloodway Extension, Flood Damage Reduction andEnvironmental Restoration, Implementation,Trinity River Basin, Dallas County, TX, Wait Period Ends: June 9, 2003, Contact: Gene T. Rice, Jr. (817)886-1374.
EIS No. 030196, Draft EIS, AFS, MN, Chippewa andSuperior National Forests Land and ResourceManagement Plans Revision, Implementation,Beltrami, Cass, Itasca, Cook, Lake and St. LouisCounties, MN, Comment Period Ends: August 6, 2003, Contact: Duane Lula (218) 626-4300.This document is available on the Internet at: http://www.fs.fed.us/r9/chippewa/plan/planning.htm.
EIS No. 030197, Final EIS, FHW, MI, US-31Petoskey Area Improvement Study, CongestionReduction on US-31 in the City of Petoskey andResport and Bear Creek Townships, Funding and USArmy COE Section 404 Permit Issuance, EmmetCounty, MI, Wait Period Ends: June 9, 2003, Contact: JamesA. Kirschensteiner (517) 702-1835.
EIS No. 030198, Draft EIS, AFS, NV, JarbidgeCanyon Project, To Implement a Road ManagementPlan and Construct a Water Projects along the Charleston-Jarbidge Road, and Reconstruct the South Canyon Road, Humbolt-Toiyabe NationalForest, Jarbidge Ranger District, ELko County, NV. Comment Period Ends: June 23, 2003, Contact: Jim Winfrey (778) 778-0229.
EIS No. 030199, Final EIS, COE, TX, Three OaksMine Project, Construction and Operation of a Surface Lignite Mine, U.S. Army COE Section 404Permit Issuance, Lee and Bastrop Counties, TX, Wait Period Ends: June 23, 2003, Contact: Jennifer Walker (817) 886-1733.
EIS No. 030200, Draft EIS, DOD, Programmatic EIS -Chemical and Biological Defense Program, ToProtect our Soldiers, Sailors, Marines and Airmen on the Battlefield, United States and otherCountries, Comment Period Ends: June 23, 2003, Contact: Jolane Souris (301) 619-2004.
EIS No. 030201, Final EIS, USN, CA, AdvancedAmphibious Assault Vehicle (AAAV) Development,Replacement and Establishment, Implementation,Del Mar Basin Area of Marine Base Corps (MCB)Camp Pendelton, San Diego County, CA, Wait Period Ends: June 9, 2003, Contact: Lisa Seneca (619) 532-4744.
EIS No. 030202, Final EIS, DOE, AZ, ID, NV, OR, WY, CA, MT, NM, UT, Fish and WildlifeImplementation Plan, To Implement and Fund a Policy Directions for Fish and WildlifeMitigation and Recovery, Pacific Northwest, AZ,CA, ID, MT, NV, NM, OR, UT, WY and BritishColumbia, Wait Period Ends: June 9, 2003, Contact: Charles Alton (503) 230-5878.
EIS No. 030203, Final EIS, AFS, AK, CholmondeleyTimber Sales, Implementation, Harvesting Timber,Tongass Forest Plan, Tongass National Forest,Craig Ranger District, West of Ketchikan andSouth of Prince of Wales Island, AK, Wait Period Ends: June 9, 2003, Contact: Dale Kanen (907) 826-3211.
EIS No. 030204, Draft EIS, STB, TX, Bayport LoopRail Line Project, Construction and Operation, between Bayport Loop and the former Galveston,Houston, Henderson Railroad Rail Line, Houston,Harris County, TX, Comment Period Ends: June 23, 2003, Contact: Dana White (888) 229-7857.This document is available on the Internet at: http://www.stb.dot.gov.
EIS No. 030205, Final EIS, NPS, FL, BiscayneNational Park General Management Plan Amendment,Evaluation of the Effects of SeveralAlternatives for the Long-Term Management Plan,Stillsville, Biscayne National Park, Homestead,Miami-Dade County, FL, Wait Period Ends: June 9, 2003, Contact: Linda Canzanell (305) 230-1144.
EIS No. 030206, Draft EIS, NOA, LA, ProgrammaticEIS-The Louisiana Regional Restoration PlanningProgram, To Establish and Implement Natural ResourceTrust Mandates, LA, Comment Period Ends: July 9, 2003, Contact: William Conner (301) 713-3038 Ext 190.This document is available on the Internet at: http://www.darp.noaa.gov/.
EIS No. 030208, Final EIS, AFS, ID, Golden HandNo. 3 and No. 4 Lode Mining Claims Plan of Operations Approval, Implementation, FrankChurch-River of No Return (FC-RONR) Wilderness,Payette National Forest, Krassel Ranger District,Valley County, ID, Wait Period Ends: June 9, 2003, Contact: Quinn Carver (208) 634-0600.This document is available on the Internet at: http://www.fs/fed/us/r4/payette/main.htm/.
Dated: May 6, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-11632 Filed 5-8-03; 8:45 am]
BILLING CODE 6560-50-P