68 FR 60 pg. 15165 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 68Number: 60Page: 15165
Docket number: [ER-FRL-6638-7]
FR document: [FR Doc. 03-7502 Filed 3-27-03; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6638-7]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General Information (202)564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed March 17, 2003 through March 21, 2003
Pursuant to 40 CFR 1506.9.
EIS No. 030119, Draft Supplement, AFS, MT, Threemile Stewardship Project, Proposed Short-Term and Long-Term Vegetation and RoadManagement Activities, Ashland Ranger District,Custer National Forest, Powder and RosebudCounties, MT, Comment Period Ends: May 12, 2003,Contact: Elizabeth McFarland (406) 784-2344.This document is available on the Internet at: http://www.fs.fed.us/rl/custer/.
EIS No. 030120, Draft Supplement, AFS, UT, Long Deer Vegetation Management Project, To the South Spruce Ecosystem Rehabilitation Project,Implementation, Dixie National Forest, Cedar CityRanger District, Iron and Kane Counties, UT,Comment Period Ends: May 12, 2003,Contact: Phillip G. Eisenhauer (435) 865-3200.
EIS No. 0230121, Draft EIS, COE, CA, East CliffDrive Bluff Protection and Parkway Project,Evaluate Alternatives for Coastal Bluff ErosionProtection, City of Santa Cruz, Santa CruzCounty, CA, Comment Period Ends: May 12, 2003,Contact: Sarah Cameron (415) 977-8538.
EIS No. 030122, Final EIS, FHW, CA, CA-78/111Brawley Bypass, Construction of an Expressway from CA-86 to CA-11, City of Brawley, Funding,Imperial County, CA, Wait Period Ends: April 28, 2003,Contact: Jeff Lewis (916) 498-5035.
EIS No. 030123, Final Supplement, JUS, CA, PinalCounty Private Detention Facility, UpdatedInformation, Single Contract for 3,000 BedsPossible Sites (1) Undeveloped Parcel of Land in the City of Eloy and the Existing Central ArizonaDetention Center Located in Florence, PinalCounty, AZ, Wait Period Ends: April 28, 2003, Contact:Charles Coburn (202) 307-9045.
EIS No. 030124, Draft EIS, NPS, DC, Rock CreekPark and the Rock Creek and Potomac ParkwayProject, General Management Plan, Implementation,Washington, DC, Comment Period Ends: May 12, 2003,Contact: Adrienna Coleman (202) 282-1063.This document is available on the Internet at: http://www.nps.gov/rocr.
EIS No. 030125, Draft EIS, TVA, TN, Rarity PointeCommercial Recreation and Residential Development on Tellico Reservoir Project, Request for TVA'sLand and Approval of Water Use Facilities,Tellico Reservoir, Loudon County, TN,Comment Period Ends: May 12, 2003,Contact: Richard Toennisson (865) 632-8517.
EIS No. 030126, Draft EIS, AFS, UT, Monticello and Blanding Municipal Watershed ImprovementProjects, Implementation, Manti-La Sal NationalForest, Monticello Ranger District, San JuanCounty, UT, Comment Period Ends: May 12, 2003,Contact: Greg T. Montgomery (435) 587-2041.
EIS No. 030127, Draft EIS, BLM, WY, West HayCreek Coal Lease Application, To Lease FederalCoal to the Buckskin Mine in Wyoming Powder RiverBasin, Campbell County, WY, Comment Period Ends: May 27, 2003,Contact: Patricia Karbs (307) 261-7600.This document is available on the Internet at: http://www.wy.blm.gov/nepa/.
EIS No. 030128, Draft EIS, NPS, AZ, PetrifiedForest National Park General Management PlanRevision, Implementation, Navajo and ApacheCounties, AZ, Comment Period Ends: May 30, 2003,Contact: Suzy Stutzman (303) 987-6671.This document is available on the Internet at: http://planning.den.nps.gov/plans.cfm.
EIS No. 030129, Draft EIS, FHW, ND, LibertyMemorial Bridge Replacement Project, Rehabilitate or Reconstruct Due to Poor and DeterioratingStructural, U.S. Coast Guard Permit and U.S. Army COESection 10 and 404 Permits, Missouri River,Bismarck and Mandan, ND, Comment Period Ends: May 12, 2003,Contact: Mark Schrader Ext.111 (701) 250-4343.
EIS No. 030130, FINAL EIS, BLM, OR, RogueNational Wild and Scenic River HellgateRecreation Area (Applegate River to Grave Creek)Management Plan, Implementation, BedfordDistrict, Josephine County, OR, Wait Period Ends: April 28,2003, Contact: Cori Cooper (541) 618-2428.
Amended Notices
EIS No. 030115, Draft EIS, FRC, CA, Pit 3, 4, 5Hydroelectric Project, (FERC No. 233-081),Application for New License, Pit River,Shasta-Trinity National Forest, Shasta County, CA,Due: May 5, 2003, Contact: John Mudre (202)502-8902.Revision of FR Notice Published on 3/21/2003: Correction to Document Status from Final to Draft.
Dated: March 25, 2003.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 03-7502 Filed 3-27-03; 8:45 am]
BILLING CODE 6560-50-P