67 FR 71 pgs. 17993-17994 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 67Number: 71Pages: 17993 - 17994
Docket number: [ER-FRL-6628-1]
FR document: [FR Doc. 02-8957 Filed 4-11-02; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6628-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or www.epa.gov/oeca/ofa.
Weekly receipt of Environmental Impact Statements
Filed April 01, 2002 Through April 05, 2002
Pursuant to 40 CFR 1506.9.
EIS No. 020128, Final EIS, AFS, CO, Bark Beetle Analysis, Proposal to Reduce Infestation of Trees by Tree-Killing Bark Beetles, Medicine Bow-Routt National Forests, Hahans Peak/Bears Ears Ranger District, Routt, Grand, Jackson and Moffat Counties, CO, Wait Period Ends: May 13, 2002, Contact: Andy Cadenhead (970) 870-2220.
EIS No. 020129, Draft EIS, BLM, OR, Kelsey Whisky Landscape Management Planning Area, Implementation, Associated Medford District Resource Management Plan Amendments, Joseph and Jackson Counties, OR, Comment Period Ends: July 12, 2002, Contact: Sherwood Tubman (541) 618-2399. This document is available on the Internet at: www.or.blm.gov/medford.
EIS No. 020130, Draft Supplement, NPS, ID, MT, WY, MT, WY, Yellowstone and Grand Teton National Parks and John D. Rockefeller, Jr., Memorial Parkway, Winter Use Plans, Updated and New Information on New Generation of Snowmobiles that Produce fewer Emissions and are Quiter, Fremont County, ID, Gallatin and Park Counties, MT and Park and Counties, WY, Comment Period Ends: May 29, 2002, Contact: Madeleine VanderHeyden (307) 739-3385.
EIS No. 020131, Final Supplement, AFS, CO, Uncompahgre National Forest Travel Plan Revision and Forest Plan Amendment, Updated Information concerning New Travel Restrictions for Resource Management, Recreational Opportunities and Winter Travel, Implementation, Gunnision, Hinsdale, Mesa, Montrose, Ouray, San Juan and San Miguel Counties, CO, Wait Period Ends: May 13, 2002, Contact: Jeff Burch (970) 874-6649.
EIS No. 020132, Draft EIS, FHW, KS, US 59 HighwayImprovements Construction, Lawrence to Ottawa,Funding, NPDES Permit Issuance and Possible USArmy COE Permit Issuance, Douglas and FranklinCounties, KS , Comment Period Ends: May 30, 2002,Contact: David R. Geiger (785) 267-7287.
EIS No. 020133, Draft EIS, FHW, VA, CapitalBeltway Study, Transportation Improvements to the 14-mile Section Capital Beltway (I-495) between the I-95/I-395/I-495 Interchange and the AmericanLegion Bridge, Fairfax County, VA , Comment Period Ends:May 28, 2002, Contact: Edward S. Sundra (804) 775-3338.
EIS No. 020134, Draft EIS, MMS, AL, LA, MS, TX, Gulf of Mexico Outer Continental Shelf Oil andGas Lease Sales: 2003-2007, Starting in 2002 the Proposed Central Planning Area Sales 185, 190,194, 198, and 201 and Western Planning Area Sales 187, 192, 196, and 200, Offshore MarineEnvironment and Coastal Counties Parishes of Texas, LA, AL and MS, Comment Period Ends:May 31, 2002, Contact: Archie Melancon (703) 787-1547.
EIS No. 020135, Final EIS, FHW, TN, I-40Transportation Improvements from I-75 to Cherry Street in Knoxville, Funding, NPDES andCOE Section 404 Permits, Knox County, TN, Wait Period Ends:May 13, 2002, Contact: Mark Doctor (615) 781-5788.
EIS No. 020136, Final EIS, FHW, MT, Montana StatePrimary Route 78 (P-78), Reconstruction, Widening and Realignment, from the junction with StateSecondary Route 419 (S-419) which is just South of Abarokee, to the Southern end of the Yellowstone River Bridge which is just south of Columbus, MT, Wait Period Ends: May 13, 2002,Contact: Dale W. Paulson (406) 449-5302.
EIS No. 020137, Draft EIS, HHS, GA, ChambleeCampus Centers for Disease Control and Prevention(CDC) Expansion, Atlanta Metro Area, City of Chamblee,Dekalb County, GA, Comment Period Ends: May 28, 2002,Contact: Phil Youngberg (404) 562-0787. This document is available on the Internet at: http://www.phe.com
EIS No. 020138, Final EIS, BIA, WA, White RiverAmphitheatre Project, Construction and Operation an 20,000 Seat Open-Air Amphitheatre on the Muckleshoot Indian Reservation, COE Section 404Permit and NPDES Permit, Seattle-Tacoma, WA,Wait Period Ends: May 13, 2002, Contact: June Boynton(503) 231-6749.
EIS No. 020139, Final EIS, UAF, MT, Montana AirNational Guard Air-to-Ground Training RangeDevelopment for Use by the 120th Fighter Wing(120th FW), Implementation, Phillips and BlaineCounties, MT, Wait Period Ends: May 13, 2002,Contact: Lt. Col. Tammy Mitnik (301) 836-8636.
EIS No. 020140, Final EIS, FTA, CA, BART-OaklandInternational Airport Connector, Extending south from the Existing Coliseum BART Station, about 3.2 miles, to the Airport Terminal Area, AlamedaCounty, CA, Wait Period Ends: May 13, 2002,Contact: Donna Turchie (415) 744-3115.
EIS No. 020141, Draft EIS, COE, WV, Spruce MineNumber 1 Surface Mining Construction Project, USArmy COE Section 404 and NPDES Permits Issuance,Blair, Logan County, WV, Comment Period Ends: May 28, 2002,Contact: James M. Richmond (304) 529-5210.
EIS No. 020142, Final EIS, FHW, NY, Interstate 86/Route 15 Interchange and Route 15/ Gang MillsInterchange, New Roadway and Ramp Construction,Intersection Reconstruction, New Bridges andBridge Rehabilitation, Town of Erwin, SteubenCounty, NY, Wait Period Ends: May 13, 2002,Contact: Robert Arnold (518) 431-4127.
Dated: April 09, 2002.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 02-8957 Filed 4-11-02; 8:45 am]
BILLING CODE 6560-50-P