67 FR 22 pg. 4959 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 67Number: 22Page: 4959
Docket number: [ER-FRL-6626-1]
FR document: [FR Doc. 02-2524 Filed 1-31-02; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6626-1]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of FederalActivities, General Information (202)564-7167 or www.epa.gov/oeca/ofa. Weekly receipt of Environmental Impact StatementsFiled January 21, 2002 Through January 25, 2002Pursuant to 40 CFR 1506.9.
EIS No. 020031, Draft EIS, FHW, LA, BayouBarataria Bridge/LA-302 Replacement, LA-45/JeanLafitte Boulvard to LA-3257/Privateer Boulvard,Funding and US Army COE Section 404 and US CoastGuard Bridge Permits Issuance, Communities of Jean Lafitte and Barataria, Jefferson Parish, LA,Comment Period Ends: March 18, 2002,Contact: William C. Farr (225) 757-7615
EIS No. 020032, Draft Supplement, GSA, CA, SanDiego-United States Courthouse Annex Project,Site Selection and Construction, New Information concerning Addition of the Union Street withHotel San Diego Facade and Lobby Alternative,Central Business District (CBD), City of San Diego,San Diego County, CA, Comment Period Ends: March 18,2002, Contact: Rosanne Nieto (415) 522-3490
EIS No. 020033, Final EIS, COE, NJ, Great EggHarbor Inlet to Townsends Inlet, Storm DamageReduction for Ocean City and Ludlam IslandUtilizing Beachfill to Construct a Protective Berm and Dune, City of Ocean City, Strathmere(Township of Upper), City of Sea Isle City, CapeMay County, NJ, Wait Period Ends: March 04, 2002,Contact: Robert L. Callegari (215) 656-6555
EIS No. 020034, Final EIS, GSA, NY, U.S. Mission to the United Nations (USUN), Demolition of Current USUN and the Construction of a New Facility on the Same Site, Located at 799 United NationsPlaza, New York, NY, Wait Period Ends: March 04,2002, Contact: Peter Sneed (212) 264-3581
EIS No. 020035, Final EIS, AFS, OK, QuachitaNational Forest, An Amendment to the Land andResource Management Plan, Implementation, GloverRiver, McCurtain County, OK, Wait Period Ends: March 04,2002, Contact: Bill Pell (501) 321-5320
EIS No. 020036, Draft EIS, BLM, NV, TableMountain Wind Generating Facility Project,Construction of a 150 to 205 Megawatt (MW) WindPowered Electric Generation Facility andAncillary Facilities, Right-of-Way Grant, SpringMountain Range between the Communities of Good Springs, Sandy Valley, Jean and Primm, ClarkCounty, NV, Comment Period Ends: April 01, 2002,Contact: Jerry Crockford (505) 599-6333
EIS No. 020037, Draft EIS, AFS, OR, CA, Programmatic-Siskiyou National Forest SuctionDredging Activities, Operating Plan Terms andConditions Approval, Coos, Curry and JosephineCounties, OR and Del Norte County, CA,Comment Period Ends: March 18, 2002,Contact: Roger Mendenhall (541) 471-6521.This document is available on the Internet at: http://www.fs.fed.us.r6/siskiyou
EIS No. 020038, Draft EIS, FHW, MI, M-15Reconstruction, I-75 to I-69, Funding and NPDES and US Army COE Section 404 Permits Issuance,Oakland and Genesse Counties, MI, Comment Period Ends:April 29, 2002, Contact: Ronald Kinney (517) 335-2621.This document is available on the Internet at: http://www.mdot.state.mi.us/m15/
EIS No. 020039, Draft EIS, JUS, CA, 14-MileBorder Infrastructure System Completion along the United States and Mexico Border, Areas I, V and VI,Pacific Ocean to just east of Tin Can Hill,San Diego County, CA, Comment Period Ends: April 01, 2002,Contact: Russell R. D'Hondt (202) 305-4386
EIS No. 020040, Final EIS, DOE, OR, UmatillaGenerating Project, Construction and Operation,Gas-Fired Combined Cycle Electric PowerGeneration Plant, Nominal Generation Capacity of 550 megawatts (MW) Connection to the RegionalGrid at McNary Substation, Umatilla County, AZ,Wait Period Ends: March 04, 2002,Contact: Inez Graetzer (503) 230-3786.This document is available on the Internet at: http://www.efw.bpa.gov
EIS No. 020041, Final SUPPLEMENT, NRC, Generic-license Renewal of Nuclear Power Plants,Supplement 5, Turkey Point Units 3 and 4(NUREG-1437), Operating License Renewal, BiscayneBay, Miami-Dade County, FL, Wait Period Ends: March 04, 2002,Contact: Dr. Michael T. Masnik (301) 415-1191
Amended Notices
EIS No. 010532, Draft EIS, AFS, IL, Natural AreaTrails Project, Construction, Reconstruction,Maintenance and Designation of Trails for Hikers and Equestrian Use, Approval of Site-SpecificMitigation and/or Monitoring Standards, ShawneeNational Forest, Jackson, Pope, Johnson, Union, Hardin and Saline Counties, IL, Comment Period Ends: March 11,2001, Contact: Richard Johnson (618) 658-2111.Revision of FR notice published on 12/31/2001: CEQ Comment Period Ending 02/11/2002 has been Corrected to 03/11/2002
EIS No. 020017, Draft EIS, BLM, WY, Powder RiverBasin Oil and Gas Project, To Extract, Transport, and Sell Oil and Natural Gas Resource,Application of Permit to Drill (APD), Special UsePermit and Right-of-Way Grant, Campbell,Converse, Johnson and Sheridan Counties, WY,Due: April 18, 2002, Contact: Paul Beels (307)684-1100.Published FR 01-18-02-Correction to Web site Address. This document is available on the Internet at: http://www.prb-eis.org
Dated: January 29, 2002.
B. Katherine Biggs,
Associate Director, NEPA Compliance Division,Office of Federal Activities.
[FR Doc. 02-2524 Filed 1-31-02; 8:45 am]
BILLING CODE 6560-50-P