67 FR 198 pgs. 63421-63422 - Environmental Impact Statements; Notice of Availability
Type: NOTICEVolume: 67Number: 198Pages: 63421 - 63422
Docket number: [ER-FRL-6633-9]
FR document: [FR Doc. 02-26001 Filed 10-10-02; 8:45 am]
Agency: Environmental Protection Agency
Official PDF Version: PDF Version
ENVIRONMENTAL PROTECTION AGENCY
[ER-FRL-6633-9]
Environmental Impact Statements; Notice of Availability
Responsible Agency: Office of Federal Activities, General Information (202) 564-7167 or http://www.epa.gov/compliance/nepa/.
Weekly receipt of Environmental Impact Statements
Filed September 30, 2002 through October 04, 2002
Pursuant to 40 CFR 1506.9.
EIS No. 020407, Draft EIS, AFS, ID, NorthKennedy-Cottonwood Stewardship Project, Proposal to Modify the Existing Transportation System and to Manage Vegetation through both Commercial andNon-Commercial methods to Improve the ForestHealth, Boise National Forest, Emmett RangerDistrict, Gem and Valley Counties, ID, Comment Period Ends:November 25, 2002, Contact: Terry Hardy (208)373-4235.
EIS No. 020408, Draft EIS, EPA, FL, PeaceRiver/Manasota Regional Surface Water SupplyAuthority's Surface Water Supply, Storage, andInterconnect Project, Construction and Operation,To Increase Finished Water Delivery Capacity of 32.7 Million Gallon Per Day To Meet Year 2015 Potable Water Demand, DeSoto, Manatee, Sarasota and Charlotte Counties, Fl, Comment Period Ends: November 29,2002, Contact: John Hamilton (404) 562-9617.
EIS No. 020409, Final EIS, NPS, GA, FortFrederica National Monument General ManagementPlan, Implementation, Saint Simons Island, GlynnCounty, GA, Wait Period Ends: November 12, 2002, Contact:Mike Tennent (912) 638-3630.
EIS No. 020410, Final Supplement, FRC, WA, IreneCreek Hydroelectric Project, (FERC No.10100-002) and Anderson Creek Hydroelectric Project (FERCNo. 10416-003), Construction and Operation,Issuance of Amended License Applications, Skagit and Whatcom Counties, WA, Wait Period Ends: November 12,2002, Contact: Alan Mitchnick (202) 502-6074.
EIS No. 020411, Final EIS, BIA, CA, NV, TruckeeRiver Water Quality Settlement Agreement-Federal Water Right Acquisition, Implementation,Truckee River, Placer County, CA and Washoe,Storey and Lyon Counties, NV, Wait Period Ends: November 12,2002, Contact: Tom Strekal (775) 887-3500.
EIS No. 020412, Final EIS, COE, KS, Tuttle CreekDam Safety Assurance Program, Proposal for FloodControl, Water Supply, Water Quality, FishWildlife, Recreation and Navigation Support, BigBlue River, Riley and Potawatomie Counties, KS,Wait Period Ends: November 12, 2002, Contact: William B.Empson (816) 983-3556.
EIS No. 020413, Final EIS, FHW, LA, Louisiana 1Improvements Project, Golden Meadow to PortFourchon Highway Construction, Funding, U.S. ArmyCOE Section 10 and 404, NPDES and Coast GuardBridge Permits Issuance, Lafoufche Parish, LA,Wait Period Ends: November 20, 2002, Contact: William C. Farr(225) 757-7615.
EIS No. 020414, Final EIS, AFS, MT, Black AntSalvage Project, Salvage of 739 Acres of DeadMerchantable Trees from the Lost Fork Fire of 2001, Lewis and Clark National Forest, MeagherBasin County, MT, Wait Period Ends: November 12, 2002,Contact: George Weldon (406) 791-7700.
EIS No. 020415, Final Supplement, COE, FL, Central and Southern Florida Project, IndianRiver Lagoon-South Feasibility Study, AdditionalInformation, Selection of Plan, Alternative 6,Restoration of the Southern Indian River Lagoon and the St. Lucie Estuary Ecosystem, Martin, St.Lucie, Okeechobee Counties, FL, Wait Period Ends: November 12, 2002, Contact: Laura Mahoney (904) 232-2646.
EIS No. 020416, Final EIS, DOE, ID, IdahoHigh-Level Waste and Facilities Disposition,Alternatives for Managing High-Level Waste, MixedTransuranic Waste/Sodium Bearing Waste andAssociated Radioactive Wastes Evaluation,Bannock, Bingham, Bonneville, Butte, Madison,Clark, and Jefferson Counties, ID, Wait Period Ends: November 12, 2002, Contact: Richard Kimmel (208) 526-5583.
EIS No. 020417, Draft EIS, FTA, CA, TransbayTerminal/Caltrain Development DowntownExtension/Redevelopment Project, New Multi-ModalTerminal Construction, Peninsula Corridor ServiceExtension and Establishment of a RedevelopmentPlan, Funding, San Francisco, San Mateo and SantaClara Counties, CA, Comment Period Ends: November 25, 2002,Contact: Jerome Wiggins (415) 744-3115.
EIS No. 020418, Draft EIS, USN, CA, AdvancedAmphibious Assault Vehicle (AAAV) Development,Replacement and Establishment, Implementation,Del Mar Basin Area of Marine Base Corps (MCB)Camp Pendelton, San Diego County, CA, Comment Period Ends:November 25, 2002, Contact: Lisa Seneca (619) 532-4744.
Amended Notices
EIS No. 020343, Draft EIS, SFW, CA, Natomas BasinHabitat Conservation Plan, Issuance of Incidental TakePermit and the Adoption of an Implementing Agreement orAgreements, Natomas Basin, Sacramento and Sutter Counties,CA, Comment Period Ends: October 28, 2002, Contact:Vicki Campbell (916) 414-6600. Revision of FR NoticePublished on 8/16/2002: CEQ Comment PeriodEnding 9/30/2002 has been Extended to 10/28/2002.
Dated: October 8, 2002.
Joseph C. Montgomery,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 02-26001 Filed 10-10-02; 8:45 am]
BILLING CODE 6560-50-U